Shop Fitting & Commercial Fit-Out SWMS Templates
Commercial shop-fitting SWMS for retail, medical practice, dental, pharmacy, laboratory, childcare, and anti-ligature mental-health fit-outs. Multi-trade scope covering joinery, partition, ceiling grid, services rough-in, and out-of-hours work in occupied premises.
About these SWMS
Shop fitting and commercial fit-out covers the multi-trade installation of joinery, partitions, suspended ceilings, services rough-in, fixtures, and finishes inside retail, hospitality, medical, dental, pharmacy, laboratory, childcare, and mental-health premises. SWMS in this category align with WHS Regulation 2025 Part 6.3 (high-risk construction work), the Construction Work Code of Practice, AS/NZS 1170 for structural fixings, AS/NZS 3000 for electrical rough-in, and AS 1684 for joinery framing. Fit-out work frequently occurs in occupied or partially occupied buildings, triggering duties under the Managing the Work Environment and Facilities Code of Practice and the Managing Noise and Preventing Hearing Loss Code. This category is built for shop-fitters, principal contractors, and project managers tendering commercial fit-out packages who need defensible, trade-specific SWMS.
What this category covers
- βDemolition of existing shop fronts, joinery and partitions
- βSteel and timber stud partition wall installation
- βSuspended ceiling grid and tile installation
- βCustom joinery, counters, shelving and display install
- βGlazing, mirror and shopfront installation
- βElectrical, data and lighting rough-in coordination
- βPlumbing, gas and mechanical services rough-in
- βCommercial kitchen and food-service equipment install
- βVinyl, tile and timber flooring installation
- βSignage, awnings, blinds and window treatments
- βAnti-ligature fixture install for mental-health fit-outs
- βOut-of-hours work in occupied retail and medical premises
39 SWMS in this category
39 ready-to-buy editable DOCXs Β· 8 state variants per product Β· delivered within 24 hours of payment.
Shop Fitting
49 SWMSπͺShop Fitting SWMS
Retail and hospitality fit-out including shop fronts, fixtures, joinery, and trade coordination.
πͺAwnings / Blinds / Curtains SWMS
Awnings, blinds, and curtains installation covers external retractable awning install, internal venetian/roller blind installation, motoriseβ¦
ποΈBakery Fit-Out SWMS
Bakery / patisserie fit-out. Includes oven and proofer install with gas / electrical, dough mixer install, refrigerated display cabinets, reβ¦
ποΈBeauty Salon Fit-Out SWMS
Beauty salon / nail salon fit-out. Includes manicure / pedicure station install with plumbing, dedicated ventilation for nail chemicals, treβ¦
ποΈCoffee Shop Fit-Out SWMS
Full commercial coffee shop fit-out including counter and joinery install, espresso machine plumbing and gas connection, refrigeration and cβ¦
ποΈDental Surgery Fit-Out SWMS
Dental surgery fit-out including dental chair install with utility hookups (water, suction, compressed air, electrical), nitrous oxide pipewβ¦
ποΈDisplay Cabinet Install SWMS
Install of retail display cabinets, gondola shelving, wall-mounted display systems, glass display cases. Includes flat-pack assembly on siteβ¦
ποΈFitness Studio Fit-Out SWMS
Fitness / yoga / pilates studio fit-out. Includes sprung studio flooring, mirror wall install, ballet barre install, sound system wiring, chβ¦
ποΈFitting Room Construction SWMS
Construction of retail fitting rooms / change rooms including stud-wall framing, plasterboard install, mirror mounting, curtain track or dooβ¦
ποΈGlass Display Wall SWMS
Install of glazed shopfront panels, glass display walls, frameless glass partitions and doors. Includes glass delivery and on-site handling β¦
ποΈHairdresser Salon Fit-Out SWMS
Hairdresser and beauty salon fit-out including styling station install with mirror walls, wash-basin install with plumbing and water heater,β¦
ποΈJewellery Store Fit-Out SWMS
Jewellery retail fit-out β high-security glass display cabinets, safe install, security camera and alarm system, customer counter, lighting β¦
ποΈMedical Practice Fit-Out SWMS
GP / specialist medical practice fit-out including consult-room partitioning, medical-grade plumbing for hand-wash and decontamination, elecβ¦
ποΈOffice Fit-Out SWMS
Commercial office fit-out covering partition install, suspended ceiling install, electrical and data cable rough-in, light fitting install, β¦
ποΈOptical Store Fit-Out SWMS
Optical store fit-out β frame display fit-out, consult room build for eye testing equipment, dispensing counter, lab area, reception, signagβ¦
ποΈPharmacy Fit-Out SWMS
Retail pharmacy fit-out including dispensary build (shelving, dispensary counter, refrigeration for Schedule 8/4 storage), retail floor dispβ¦
ποΈPhone Repair Shop SWMS
Mobile phone and tech repair shop fit-out β repair workbench install with ESD-safe surfaces, security display cabinets, customer counter, siβ¦
ποΈPOS Equipment Install SWMS
Install of point-of-sale equipment β cash registers, EFTPOS terminals, barcode scanners, customer-display screens, receipt printers, cash drβ¦
ποΈQSR Kitchen Fit-Out SWMS
Quick-service / takeaway kitchen fit-out β burger / sushi / kebab. Includes commercial cooking equipment, exhaust hoods with fire suppressioβ¦
ποΈRestaurant Fit-Out SWMS
Commercial restaurant fit-out including commercial kitchen install (cooking equipment, exhaust hoods, grease traps), gas appliance commissioβ¦
ποΈRetail Counter Install SWMS
Install of retail service counters, display cabinets, back-of-house joinery in shopping centre / strip retail locations. Includes flat-pack β¦
ποΈRetail Signage Install SWMS
Install of retail signage β fascia signs, illuminated box signs, channel-letter signs, pylon signs, vinyl shopfront graphics. Includes EWP /β¦
ποΈShop Lighting Install SWMS
Install of retail and shopfitting lighting β track lighting, downlights, display spots, illuminated signage, emergency and exit lighting. Inβ¦
πͺSliding/Bi-fold Door Maintenance SWMS
Sliding and bi-fold door maintenance covers track adjustment, roller replacement, glass panel handling for repair, lubrication, weather sealβ¦
ποΈTravel Agency Fit-Out SWMS
Travel agency fit-out β consultant desks with screens, customer waiting area, brochure displays, signage, data cabling for booking systems, β¦
Internal Fit Out
11 SWMSπ’Internal Fit-Out SWMS
Internal fit-out including partitions, ceilings, doors, joinery, and final finishing for commercial spaces.
πͺCommercial Kitchen Fit-Out (New) SWMS
SWMS template for commercial kitchen fit-out (new). Covers Multi-trade kitchen build, gas + drainage + extraction.. 8-state AU coverage, CIHβ¦
π₯οΈData Centre Fit-Out SWMS
Data centre white-space fit-out β raised-floor build, cable tray and busway install, cabinet / rack delivery and bolt-down, server-floor patβ¦
π₯Hospital Fit-Out (ICRA) SWMS
Construction and fit-out works inside occupied hospital / healthcare facilities under Infection Control Risk Assessment (ICRA) β class-of-coβ¦
π’Office Furniture / Workstation Install SWMS
SWMS template for office furniture / workstation install. Covers Modular furniture, workstation systems.. 8-state AU coverage, CIH-reviewed β¦
π’Office Partition Wall Installation SWMS
SWMS template for office partition wall installation. Covers Demountable systems, aluminium track + glazed/solid panels.. 8-state AU coveragβ¦
Carpentry Fitout
3 SWMSπAcoustic Wall Construction SWMS
Constructing acoustic-rated partition walls to slab height: steel framing, mineral-fibre insulation and multi-layer high-density board lininβ¦
π§±Steel-Stud Partition Install SWMS
Installing light-gauge steel-stud partition framing and plasterboard lining to ceiling or slab height, including top-track fixing, cutting, β¦
Childcare Fitout
3 SWMSπΌChildcare Wet-Area Fit-Out SWMS
Fitting out a childcare nappy-change and wet area - benches and steps, hand-wash and warm-water plumbing with anti-scald protection, wet-areβ¦
πChildcare Soft-Fall & Fencing SWMS
Installing childcare outdoor play equipment, impact-attenuating soft-fall surfacing, anti-trap detailing and boundary fencing to AS 4685 andβ¦
Anti Ligature Fitout
1 SWMSπ§©Anti-Ligature Fit-Out SWMS
Fitting out a dementia-care or mental-health area with anti-ligature and dementia-safe fixtures, fittings, door hardware and electrical acceβ¦
Dental Fitout
1 SWMSπ¦·Dental Surgery Fit-Out SWMS
Fitting out or stripping out a dental surgery - dental chairs, units, suction and amalgam separators - and decommissioning older surgeries wβ¦
Laboratory Fitout
1 SWMSπ§«Lab Biocontainment Fit-Out SWMS
Fitting out a PC2 or PC3 physical-containment laboratory - sealed surfaces, directional airflow and pressure cascade, HEPA filtration, biosaβ¦
Pharmacy Fitout
1 SWMSπPharmacy Dispensing Robot SWMS
Installing and commissioning a pharmacy dispensing and automation robot and a Schedule 8 drug-safe - positioning, electrical connection, assβ¦
Applicable standards & regulations
Frequently asked questions
Is commercial shop fitting classed as high-risk construction work under WHS Regulation 2025?
Yes β most shop fitting meets the high-risk construction work (HRCW) definition under WHS Regulation 2025 clause 291. Common triggers include risk of a fall greater than 2 metres (ceiling grid, signage, high joinery), use of powered tools and explosive-powered fixings, work on or near energised electrical installations, and work in areas with movement of powered mobile plant. A compliant SWMS must be prepared before work commences and kept available for the duration of the work.
Do I need separate SWMS for each trade in a multi-trade fit-out project?
Yes. Each PCBU performing high-risk construction work must prepare a SWMS for the specific tasks they undertake, per WHS Regulation 2025 clause 299. A single combined SWMS rarely satisfies regulators because joinery, electrical, plumbing, ceiling and glazing trades face different hazards and controls. The principal contractor coordinates SWMS under clause 309 but does not absorb the duty. Trade-specific SWMS also support clearer toolbox talks and worker consultation under clause 47.
What extra controls apply when fit-out work happens in occupied retail or medical premises?
Occupied-premises fit-out triggers duties under WHS Regulation 2025 section 19 to protect other persons, plus the Managing the Work Environment and Facilities Code. SWMS must address public exclusion zones, dust and noise controls (Managing Noise CoP), infection control for medical fit-outs (AS 1668.2 for ventilation), out-of-hours scheduling, secure isolation of construction zones, and emergency egress for tenants and customers. Anti-ligature fit-outs in mental-health settings require additional fixture specification controls.
What is the difference between a SWMS and a JSA for shop-fitting work?
A SWMS is a legal document required under WHS Regulation 2025 clause 299 specifically for high-risk construction work, with prescribed content: the HRCW, hazards, controls, how controls are implemented and reviewed. A JSA (Job Safety Analysis) is a general risk assessment tool with no prescribed format and is not regulator-mandated. For commercial fit-out classed as HRCW, a JSA alone will not satisfy WHS inspectors β a documented, signed and consulted SWMS is required.
Are these SWMS valid across all Australian states and territories?
Yes β these SWMS are written to the model WHS Regulation 2025 and model Codes of Practice, which are adopted in NSW, Queensland, ACT, Northern Territory, South Australia, Tasmania, and the Commonwealth. Western Australia adopted the model laws in 2022 (WHS Act 2020 WA). Victoria operates under the OHS Act 2004 and OHS Regulations 2017; the SWMS content remains technically valid but referenced as a Safe Work Procedure where required. State-specific licensing for electrical and plumbing trades still applies.
Shop Fitting & Commercial Fit-Out SWMS
Editable DOCX templates, 8 state variants per product, CIH-reviewed.
Browse all SWMS