OH Consultant
← All SWMS Documents
πŸ›οΈ

Pharmacy Fit-Out SWMS

Retail pharmacy fit-out including dispensary build (shelving, dispensary counter, refrigeration for Schedule 8/4 storage), retail floor display install, methadone-program room (where applicable), consult-room build, security shutters, signage, electrical and lighting.

βš–οΈWHS Regulation 2025 & Codes of Practice β€” legally binding from 1 July 2026 (s26A)
πŸ‘·Reviewed by certified occupational health and safety professionals
πŸ—ΊοΈState-specific variants for all 8 Australian jurisdictions
$199 AUDβœ“ Instant Download Available

SWMS variants reference your state’s WHS legislation. Instant download after payment.

Pharmacy fit-out involves dispensary joinery, Schedule 8/4 refrigeration install, consult-room build, security shutters, signage, electrical and lighting. Live retail environments, energised circuits, and controlled-drug storage requirements trigger WHS Regulation 2025 Schedule 1 High Risk Construction Work, requiring a documented SWMS before work commences on site.

Hazards identified

3 hazards covered, sorted by priority.

Live electrical work for dispensary refrigeration and lighting circuitsHIGH

Electrocution, arc flash, fatality

Manual handling of joinery, shelving and security shuttersMEDIUM

Crush injury, musculoskeletal damage

Working adjacent to occupied retail and public areasMEDIUM

Public injury, slip/trip from debris

Control measures

Hierarchy-of-controls order: elimination β†’ substitution β†’ isolation β†’ engineering β†’ administrative β†’ PPE.

  1. 1Licensed electrician isolates, tests and tags circuits before any dispensary or refrigeration connection work commences.
  2. 2Two-person lift or mechanical aids for joinery, shutters and refrigeration units exceeding 25kg.
  3. 3Hoarding, signage and exclusion zones separate fit-out work from pharmacy customers and staff.

Applicable Codes of Practice

AS/NZS 3000:2018 Wiring Rulesβš– Legally binding Β· 1 Jul 2026

Electrical installation standard for dispensary and refrigeration circuits

Code of Practice: Construction Workβš– Legally binding Β· 1 Jul 2026

SWMS required for HRCW under Schedule 1

High-Risk Construction Work triggered

14
Work on or near energised electrical installations

Dispensary lighting, refrigeration and power circuit connections involve energised electrical installations.

18
Work adjacent to a road or traffic corridor

Signage and shutter install often adjacent to footpath traffic in active retail precincts.

Legal consequence

No SWMS before HRCW: PCBU fines up to $15,000 (individual).

What you receive

  • βœ“Editable DOCX SWMS template
  • βœ“State-specific WHS legislation schedule
  • βœ“Project hazard register
  • βœ“Worker sign-on register

Related legislation

  • WHS Act 2011
  • WHS Regulation 2025 Schedule 1
  • Electrical Safety Act (state-based)
What's in this SWMS

Document details

Regulation
WHS Regulation 2025, Schedule 1 β€” High Risk Construction Work
HRCW Category
Electrical, joinery, security install, dispensary plumbing
Hazards Identified
12 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment