Beauty & Nail Salon Fit-Out SWMS
Beauty salon / nail salon fit-out. Includes manicure / pedicure station install with plumbing, dedicated ventilation for nail chemicals, treatment room build with wet area, retail display, reception, signage.
SWMS variants reference your stateβs WHS legislation. Instant download after payment.
Beauty and nail salon fit-out including manicure/pedicure plumbing, dedicated chemical ventilation, wet-area treatment rooms, retail display and signage. Triggers WHS Regulation 2025 Schedule 1 HRCW provisions.
Hazards identified
3 hazards covered, sorted by priority.
Asthma, dermatitis, sensitisation
Electrocution, fire
Slips, electrical contact
Control measures
Hierarchy-of-controls order: elimination β substitution β isolation β engineering β administrative β PPE.
- 1Install source-capture LEV at each nail station per AS 1668.2.
- 2RCD-protected circuits; licensed electrician isolates and tests before energising.
- 3Licensed plumber installs backflow prevention; pressure-test before tiling closure.
Applicable Codes of Practice
Mechanical ventilation for nail chemical extraction
Electrical wiring rules, wet-area zoning
High-Risk Construction Work triggered
Salon power, lighting and ventilation circuits energised during commissioning.
SWMS mandatory before work starts (Reg 291).
What you receive
- βEditable DOCX template β Microsoft Word compatible
- βState-specific WHS legislation schedule (NSW/VIC/QLD/SA/WA/TAS/NT/ACT)
- βHazard register with risk ratings + controls
- βWorker sign-on register and pre-start checklist
Related legislation
- WHS Act 2011 (model)
- WHS Regulation 2025
- AS/NZS 3000 β Electrical installations