OH Consultant
← All SWMS Documents
πŸ›οΈ

Medical Practice Fit-Out SWMS

GP / specialist medical practice fit-out including consult-room partitioning, medical-grade plumbing for hand-wash and decontamination, electrical fit-out with AS/NZS 3003 patient-area compliance, medical gas pipework where required (oxygen, suction), pharmacy storage, reception and waiting area finishes, accessible bathroom upgrade.

βš–οΈWHS Regulation 2025 & Codes of Practice β€” legally binding from 1 July 2026 (s26A)
πŸ‘·Reviewed by certified occupational health and safety professionals
πŸ—ΊοΈState-specific variants for all 8 Australian jurisdictions
$199 AUDβœ“ Instant Download Available

SWMS variants reference your state’s WHS legislation. Instant download after payment.

Medical practice fit-out covers consult-room partitioning, AS/NZS 3003 patient-area electrical, medical-grade plumbing, oxygen and suction gas pipework, pharmacy storage and accessible bathroom upgrades. WHS Regulation 2025 Schedule 1 classifies electrical, structural and pressurised-gas work as High Risk Construction Work, requiring a SWMS before work commences on site.

Hazards identified

3 hazards covered, sorted by priority.

Live electrical work near patient-care areas (AS/NZS 3003)HIGH

Electrocution, microshock to future patients

Medical gas pipework β€” oxygen-enriched atmosphere and pressurisationHIGH

Fire, explosion, asphyxiation

Construction dust and biological contamination of clinical zonesMEDIUM

Infection risk to staff and patients

Control measures

Hierarchy-of-controls order: elimination β†’ substitution β†’ isolation β†’ engineering β†’ administrative β†’ PPE.

  1. 1Licensed electrician verifies AS/NZS 3003 body/cardiac protected area compliance with test certificates
  2. 2Medical gas pipework installed and certified to AS 2896 by accredited installer only
  3. 3Negative-pressure dust containment, HEPA extraction, daily clean-down before reopening clinical zones

Applicable Codes of Practice

AS/NZS 3003:2018 Patient Areas

Mandatory electrical safety standard for medical treatment areas

AS 2896:2021 Medical Gas Systems

Installation and testing of medical gas pipeline systems

High-Risk Construction Work triggered

14
Work on or near energised electrical installations

Patient-area electrical fit-out and switchboard connections under AS/NZS 3003

16
Work on or near pressurised gas distribution mains

Installation of oxygen and medical suction pipework under pressure

Legal consequence

SWMS mandatory before work starts; penalties up to $30,000 per breach

What you receive

  • βœ“Editable DOCX SWMS customisable to your project and ABN
  • βœ“State-specific WHS legislation schedule (all 8 jurisdictions)
  • βœ“Hazard and risk register with residual risk scoring
  • βœ“Worker sign-on register for daily SWMS acknowledgement

Related legislation

  • WHS Act 2011 s.19 β€” Primary duty of care
  • WHS Regulation 2025 Part 6.3 β€” High Risk Construction Work
  • AS 4187 β€” Reprocessing of reusable medical devices
What's in this SWMS

Document details

Regulation
WHS Regulation 2025, Schedule 1 β€” High Risk Construction Work
HRCW Category
Electrical, plumbing, medical gas pipework, infection control
Hazards Identified
14 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment