OH Consultant
← All SWMS Documents
πŸ›οΈ

Display Cabinet & Shelving Install SWMS

Install of retail display cabinets, gondola shelving, wall-mounted display systems, glass display cases. Includes flat-pack assembly on site, wall and floor anchoring, glass panel handling and install, integrated lighting connection.

βš–οΈWHS Regulation 2025 & Codes of Practice β€” legally binding from 1 July 2026 (s26A)
πŸ‘·Reviewed by certified occupational health and safety professionals
πŸ—ΊοΈState-specific variants for all 8 Australian jurisdictions
$99 AUDβœ“ Instant Download Available

SWMS variants reference your state’s WHS legislation. Instant download after payment.

Installation of retail display cabinets, gondola shelving, wall-mounted systems and glass display cases. Work involves flat-pack assembly, wall and floor anchoring, glass panel handling, and connection of integrated lighting. Triggers WHS Regulation 2025 Schedule 1 High Risk Construction Work provisions and requires a documented SWMS before work commences.

Hazards identified

3 hazards covered, sorted by priority.

Manual handling of heavy flat-pack components and glass panelsHIGH

Musculoskeletal injury, crush injury, lacerations

Falls from ladders or platforms installing high wall shelvingHIGH

Serious injury or fatality from height

Power tool use during anchoring and assemblyMEDIUM

Lacerations, eye injury, electric shock

Control measures

Hierarchy-of-controls order: elimination β†’ substitution β†’ isolation β†’ engineering β†’ administrative β†’ PPE.

  1. 1Two-person lift for panels over 25kg; use trolleys and suction cups for glass.
  2. 2Use rated platform ladders or mobile scaffold for shelving above 2m.
  3. 3Inspect and test-tag power tools; mandatory safety glasses, gloves and RCD protection.

Applicable Codes of Practice

Code of Practice: Hazardous Manual Tasksβš– Legally binding Β· 1 Jul 2026

Direct guidance on cabinet and shelving lifting risks

Code of Practice: Managing the Risk of Falls at Workplacesβš– Legally binding Β· 1 Jul 2026

Required controls for high shelving install work

High-Risk Construction Work triggered

1
Risk of a person falling more than 2 metres

Installing high wall shelving and overhead display systems above 2m height.

14
Work on or near energised electrical installations

Connection of integrated cabinet lighting to live circuits during fit-out.

Legal consequence

SWMS mandatory before HRCW starts; PCBU penalties apply for non-compliance.

What you receive

  • βœ“Editable DOCX SWMS tailored to display cabinet and shelving install
  • βœ“State-specific WHS legislation schedule (all Australian jurisdictions)
  • βœ“Hazard register covering manual handling, falls and power tool risks
  • βœ“Worker sign-on register for SWMS consultation and acknowledgement

Related legislation

  • WHS Act 2011 s.19 β€” Primary duty of care
  • WHS Regulation 2025 r.291 β€” SWMS for High Risk Construction Work
  • AS/NZS 1892.1 β€” Portable ladders
What's in this SWMS

Document details

Regulation
WHS Regulation 2025, Schedule 1 β€” High Risk Construction Work
HRCW Category
Manual handling, working at heights (high shelving), power tools
Hazards Identified
7 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment