Install of retail and shopfitting lighting β€” track lighting, downlights, display spots, illuminated signage, emergency and exit lighting. Includes cable rough-in, ceiling penetration, transformer install, control panel wiring, commissioning and isolation tests.

βš–οΈWHS Regulation 2025 & Codes of Practice β€” legally binding from 1 July 2026 (s26A)
πŸ‘·Reviewed by certified occupational health and safety professionals
πŸ—ΊοΈState-specific variants for all 8 Australian jurisdictions
$199 AUDβœ“ Instant Download Available

SWMS variants reference your state’s WHS legislation. Instant download after payment.

Installation of retail lighting systems including track lighting, downlights, display spots, illuminated signage and emergency/exit fittings. Work involves cable rough-in, ceiling penetration, transformer mounting, control panel wiring and live commissioning. Triggers HRCW under WHS Regulation 2025 Schedule 1 for energised electrical work and work at height above 2m.

Hazards identified

3 hazards covered, sorted by priority.

Contact with energised conductors during commissioningHIGH

Electrocution, cardiac arrest, severe burns

Fall from ladder or EWP during ceiling installHIGH

Fractures, head injury, fatality

Ceiling dust, insulation fibres and asbestos in pre-1990 fitoutsMEDIUM

Respiratory disease, mesothelioma

Control measures

Hierarchy-of-controls order: elimination β†’ substitution β†’ isolation β†’ engineering β†’ administrative β†’ PPE.

  1. 1Isolate, lock-out and tag circuits; verify dead with tested two-pole tester before work.
  2. 2Use rated EWP or industrial A-frame ladder with spotter; harness above 2m on EWP.
  3. 3Review asbestos register before ceiling penetration; wear P2 respirator and cut-resistant gloves.

Applicable Codes of Practice

AS/NZS 3000:2018 Wiring Rules

Mandatory installation, testing and verification requirements

AS/NZS 3012:2019

Electrical safety on construction and demolition sites

High-Risk Construction Work triggered

8
Work on or near energised electrical installations

Live commissioning, panel termination and insulation resistance testing on energised circuits.

9
Work at height with risk of fall more than 2m

Ceiling-mounted fitting installation from ladders and EWPs above 2 metres.

Legal consequence

SWMS mandatory before work starts; penalties up to $15,000 individual.

What you receive

  • βœ“Editable DOCX SWMS customisable to your project and ABN
  • βœ“State-specific WHS legislation schedule (NSW, VIC, QLD, WA, SA, TAS, ACT, NT)
  • βœ“Pre-populated hazard and risk register with residual risk ratings
  • βœ“Worker sign-on register for SWMS consultation evidence

Related legislation

  • WHS Act 2011 s.19 β€” Primary duty of care
  • WHS Regulation 2025 Part 4.7 β€” Electrical safety
  • WHS Regulation 2025 Part 4.4 β€” Falls
What's in this SWMS

Document details

Regulation
WHS Regulation 2025, Schedule 1 β€” High Risk Construction Work
HRCW Category
Cat 8 (electrical), Cat 9 (work at height), live testing
Hazards Identified
9 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)