OH Consultant
← All SWMS Documents
πŸ›οΈ

Quick-Service Kitchen Fit-Out SWMS

Quick-service / takeaway kitchen fit-out β€” burger / sushi / kebab. Includes commercial cooking equipment, exhaust hoods with fire suppression, gas connection, refrigerated display, customer counter, point-of-sale.

βš–οΈWHS Regulation 2025 & Codes of Practice β€” legally binding from 1 July 2026 (s26A)
πŸ‘·Reviewed by certified occupational health and safety professionals
πŸ—ΊοΈState-specific variants for all 8 Australian jurisdictions
$199 AUDβœ“ Instant Download Available

SWMS variants reference your state’s WHS legislation. Instant download after payment.

Quick-service kitchen fit-out covering commercial cooking equipment, exhaust hoods with fire suppression, gas connection, refrigeration and POS counters. Triggers HRCW under WHS Regulation 2025 Schedule 1 for energised services and confined work areas.

Hazards identified

3 hazards covered, sorted by priority.

Gas leak during commercial appliance connectionHIGH

Explosion, fire, asphyxiation

Live electrical work on three-phase cooking equipmentHIGH

Electrocution, arc flash burns

Manual handling of cooking equipment and stainless benchesMEDIUM

Crush injury, musculoskeletal damage

Control measures

Hierarchy-of-controls order: elimination β†’ substitution β†’ isolation β†’ engineering β†’ administrative β†’ PPE.

  1. 1Licensed gas fitter pressure-tests and certifies per AS/NZS 5601.1 before commissioning.
  2. 2Licensed electrician isolates, tests dead and issues CoES per AS/NZS 3000.
  3. 3Mechanical lifting aids and two-person lifts for items over 25kg.

Applicable Codes of Practice

AS/NZS 5601.1:2022 Gas installationsβš– Legally binding Β· 1 Jul 2026

Mandatory for commercial gas appliance connection and testing

AS/NZS 3000:2018 Wiring Rulesβš– Legally binding Β· 1 Jul 2026

Three-phase kitchen circuits and isolation requirements

High-Risk Construction Work triggered

14
Work on or near energised electrical installations

Connecting cooking equipment, exhaust controls and refrigeration to live switchboards.

Legal consequence

SWMS mandatory before work; stop-work if not followed.

What you receive

  • βœ“Editable DOCX template β€” Microsoft Word compatible
  • βœ“State-specific WHS legislation schedule (NSW/VIC/QLD/SA/WA/TAS/NT/ACT)
  • βœ“Hazard register with risk ratings + controls
  • βœ“Worker sign-on register and pre-start checklist

Related legislation

  • WHS Act 2011 (model)
  • WHS Regulation 2025
  • AS/NZS 3000 β€” Electrical installations
What's in this SWMS

Document details

Regulation
WHS Regulation 2025, Schedule 1 β€” High Risk Construction Work
HRCW Category
Electrical, gas fitting, plumbing, refrigeration
Hazards Identified
13 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment