Commercial Kitchen Deep Clean SWMS
Deep cleaning of commercial kitchens including exhaust hoods, grease ducts, ovens, fryers, floor degreasing. Caustic degreaser handling, ducting access (sometimes confined space), hot residual heat from equipment.
SWMS variants reference your stateβs WHS legislation. Instant download after payment.
Commercial kitchen deep cleaning covers the periodic decontamination of exhaust canopies, grease ducts, plenum chambers, ovens, deep fryers, combi-steamers, salamanders and tiled floors using caustic and solvent-based degreasers, pressurised hot water and mechanical agitation. The work is routinely undertaken after trading hours when residual heat from cooking equipment remains above 60Β°C, surfaces are saturated with carbonised grease, and ducted plenums may meet the definition of a confined space under WHS Regulation 2025 Part 4.3. Because tasks involve hazardous chemicals (Part 7.1), potential confined space entry (Part 4.3), working at height on canopies and roof-mounted fans (Part 4.4) and contact with hot surfaces, a documented Safe Work Method Statement is mandatory before work commences. The PCBU must consult with workers, the kitchen operator and any building controller, then keep the SWMS available for inspection for the duration of the work and for two years after any notifiable incident.
Hazards identified
7 hazards covered, sorted by priority.
Full-thickness chemical burns, corneal liquefaction, permanent scarring and SafeWork notifiable incident under WHS Reg s38
Asphyxiation, loss of consciousness inside ducting, fatality and Category 1 prosecution of the PCBU
Partial-thickness thermal burns to forearms and hands requiring hospitalisation and lost-time injury
Falls causing fractured wrists, coccyx and head impact injuries; common kitchen workers compensation claim
Fractures, spinal injuries and fatalities from falls above two metres triggering notifiable incident reporting
Chemical pneumonitis, occupational asthma sensitisation and chronic upper airway inflammation in cleaners
Cardiac arrhythmia, electrocution and arc-flash injury where isolation procedures are not followed
Control measures
Hierarchy-of-controls order: elimination β substitution β isolation β engineering β administrative β PPE.
- 1Elimination β Where possible, replace manual duct scraping with steam-injection cleaning systems that remove the need for worker entry into the duct envelope entirely.
- 2Elimination β Schedule deep clean a minimum of six hours after gas and electrical equipment shutdown so residual surface temperatures fall below 40Β°C before contact cleaning begins.
- 3Substitution β Replace sodium hydroxide foaming degreasers (pH 13+) with citrus-terpene or potassium-soap formulations rated pH 11 or lower where soil load permits effective cleaning.
- 4Substitution β Substitute petrol pressure washers operating indoors with electric hot-water units to eliminate carbon monoxide accumulation in enclosed kitchen spaces.
- 5Engineering β Install mechanical extraction or portable HEPA-carbon ventilation during chemical application; lock out and tag energy isolation points on all cooking equipment per AS/NZS 4836.
- 6Engineering β Use bunded chemical decanting stations, drip trays under fryer drain points and anti-slip matting on wet zones to control grease-water runoff across walkways.
- 7Administrative β Conduct a pre-start SWMS sign-on, confined space risk assessment and atmospheric gas test (O2, LEL, CO) before any duct entry; issue confined space permit valid for the shift only.
- 8Administrative β Implement a two-person buddy system with a dedicated standby attendant outside any duct or plenum entry, equipped with retrieval line and radio communication.
- 9PPE β Chemical-splash goggles to AS/NZS 1337.1, full-face shield, nitrile chemical gauntlets to AS/NZS 2161.10.1, alkali-resistant apron and slip-rated R12 footwear to AS/NZS 2210.3.
- 10PPE β Half-face respirator with ABEK-P3 cartridges to AS/NZS 1716 for caustic mist exposure; upgrade to supplied-air respirator where duct entry occurs or LEV is unavailable.
Applicable Codes of Practice
Triggers PCBU duty to maintain SDS register, conduct exposure assessment for caustic aerosols and provide AS/NZS 1716 compliant respiratory protection.
Grease ducts and plenums meeting the confined space definition require entry permit, atmospheric monitoring and standby attendant under WHS Reg Part 4.3.
Canopy and rooftop fan access above two metres triggers fall risk control duties under WHS Reg s78 including ladder selection and edge protection.
Pressure washers, wet-pickup vacuums and extension leads used in wet kitchen environments must be test-tagged and RCD-protected before use each shift.
Who this is for
- βCommercial kitchen cleaning contractors and franchisees
- βHood and duct cleaning specialists servicing hospitality venues
- βFacility managers of hotels, clubs and aged care kitchens
- βCleaning supervisors coordinating after-hours hospitality crews
What you receive
- βEditable DOCX template β Microsoft Word compatible
- βState-specific WHS legislation schedule (NSW/VIC/QLD/SA/WA/TAS/NT/ACT)
- βHazard register with risk ratings + hierarchy-of-control mapping
- βWorker sign-on register, pre-start checklist, and incident escalation flow
Worked example
A two-person crew arrives at a 220-seat suburban club kitchen at 11pm for a quarterly deep clean of the cooking line, two exhaust canopies and 6m of grease ducting to the rooftop fan. The supervisor opens the Commercial Kitchen Deep Clean SWMS on a tablet at the pass and runs the pre-start brief. Working through the hazard register, both workers confirm the char-grill was shut down at 9pm but the supervisor uses an infrared thermometer and records a cast iron surface temperature of 78Β°C β above the 40Β°C control threshold β so the team reorders the task sequence to start with the fryers and canopies while the grill cools. The SWMS confined space control directs the supervisor to gas-test the duct at the access panel; O2 reads 20.9%, LEL 0%, so a confined space permit is issued for the shift with the second worker assigned as standby attendant on a radio. Both sign on electronically, acknowledging the caustic degreaser SDS and the ABEK-P3 respirator requirement. Mid-task, the standby worker notices the LEV fan tripping intermittently. Following the SWMS during-task adjustment trigger, work stops, the duct entry is evacuated, an electrician is called, and the variation is recorded against the SWMS before recommencement at reduced caustic concentration with portable extraction repositioned at the canopy mouth.
Related legislation
- WHS Act 2011 (model)
- WHS Regulation 2025
- Managing Risks of Hazardous Chemicals CoP
Frequently asked questions
Do grease ducts count as a confined space?
Frequently, yes, and that duty stands on its own footing. Where a duct or plenum meets the confined space definition, Part 4.3 of the WHS Regulation 2025 requires an entry permit, atmospheric testing, a standby person and a rescue plan before anyone goes in, and that obligation applies whether or not the job is construction work and therefore whether or not the section 291 and section 299 SWMS mandate is engaged. Kitchen deep cleaning is generally not construction work, so the SWMS here is written as the documented safe system of work that ties the permit, the chemical controls and the fall controls together.
How long after shutdown can the crew start cleaning?
Long enough for surfaces to fall below forty degrees, which the document sets at a minimum of six hours after gas and electrical equipment shutdown, verified rather than assumed. Cast iron char-grill plate and fryer vats hold heat far longer than crews expect, and the practical control is an infrared thermometer reading taken at the pre-start. Where the grill is still too hot, the task sequence is reordered to start with the fryers and canopies while it cools, rather than working around it. Contact burns to forearms and hands are the most common lost-time injury on an after-hours deep clean.
What respiratory protection is needed for caustic degreasers?
A half-face respirator with ABEK-P3 cartridges to AS/NZS 1716 as the baseline for caustic mist, upgraded to supplied air where duct entry occurs or local exhaust ventilation is unavailable. Foaming degreasers above pH thirteen produce an aerosol from trigger-spray application that causes chemical pneumonitis and can sensitise a cleaner into occupational asthma. The substitution control drops to citrus-terpene or potassium-soap formulations at pH eleven or lower where the soil load allows. Splash protection is a full-face shield over goggles, nitrile chemical gauntlets and an alkali-resistant apron, with slip-rated R12 footwear for the emulsion on quarry tiles.
Does it cover rooftop fan and canopy access?
Yes. Access to exhaust hoods and roof-mounted fan units puts cleaners above two metres, so ladder selection under the AS/NZS 1892 series, edge protection on the roof and the hierarchy of fall control are documented alongside the chemical and confined space controls. Electrical isolation is handled at the same time, with lockout and tagging of energy isolation points on all cooking equipment under AS/NZS 4836, because pressure washing around hardwired ovens, fan motors and three-phase equipment invites water ingress into live connections. Pressure washers and wet-pickup vacuums must be test-tagged and protected by a residual current device.
What does the standby attendant actually do during a duct entry?
Stays outside, keeps the entrant in communication, and holds the means of retrieval. The controls require a two-person buddy system with a dedicated standby attendant equipped with a retrieval line and radio, and a permit issued for that shift only rather than carried over. Atmospheric testing for oxygen, LEL and carbon monoxide is completed at the access panel before entry. Where the extraction fan trips mid-task, the documented response is to evacuate the duct, stop work, get an electrician in, and record the variation before recommencing, often at a reduced caustic concentration with portable extraction repositioned at the canopy mouth.
Document details
Related SWMS templates
π§ΉCommercial Kitchen Exhaust / Canopy Cleaning SWMS
SWMS template for commercial kitchen exhaust / canopy cleaning. Covers AS 1851 servicing, chemical degreasing,β¦
ποΈRestaurant Fit-Out SWMS
Commercial restaurant fit-out including commercial kitchen install (cooking equipment, exhaust hoods, grease tβ¦
π₯Dairy Processing SWMS
Fluid-milk and cheese processing β separator and homogeniser operation, CIP (clean-in-place) caustic and acid β¦
π§½Bond Cleaning SWMS
End-of-lease deep clean β kitchen detail, bathroom sanitisation, window cleaning, carpet steam clean. Includesβ¦
ποΈQSR Kitchen Fit-Out SWMS
Quick-service / takeaway kitchen fit-out β burger / sushi / kebab. Includes commercial cooking equipment, exhaβ¦
π§ΉCarpet & Hard Floor Restoration SWMS
Carpet and hard floor restoration covers commercial truck-mount cleaning, encapsulation cleaning, hard floor sβ¦