Job Safety Analysis (JSA) Template

This universal JSA template covers the full lifecycle of a typical work task β€” pre-start planning, work area setup, materials handling, plant and tool operation, execution of the work, managing changed conditions, housekeeping and demobilisation. Every step, hazard, risk rating and control is fully editable in Word, so you can adapt the worked example to any trade or task. Suitable for use across all Australian states and territories.

βš–οΈWHS Regulation 2025 & Codes of Practice β€” legally binding from 1 July 2026 (s26A)
πŸ‘·Reviewed by certified occupational health and safety professionals
πŸ—ΊοΈState-specific variants for all 8 Australian jurisdictions
$99 AUDβœ“ Instant Download Available

SWMS variants reference your state’s WHS legislation. Instant download after payment.

A Job Safety Analysis breaks one task into its sequential steps, then identifies the hazards, initial risk, controls and residual risk at each step before work begins. This universal JSA template is built around a fully worked example β€” a typical construction task taken from pre-start planning through site setup, materials handling, plant and tool operation, the work activity itself, housekeeping and demobilisation. Every step, hazard and control is written as a realistic starting point that you edit to match your own trade, task and site conditions. The format follows accepted Australian WHS risk-management practice: hierarchy-of-controls tagging on every control, before-and-after risk ratings, worker sign-on, and prompts to stop and reassess when conditions change.

If the task you adapt this template to involves high-risk construction work as defined in regulation 291 of the model WHS Regulations (in Victoria, the equivalent provisions of the OHS Regulations 2017), a Safe Work Method Statement must be prepared before that work starts. Completing this JSA does not discharge the SWMS duty β€” in those situations the JSA supplements the SWMS with task-level planning detail, and both should be in place.

Hazards identified

15 hazards covered, sorted by priority.

Underground or overhead services (electricity, gas, water, comms) not identified before work starts, leading to strike or contactHIGH

Arises at step: Plan the task and walk the work area with the crew. Initial risk HIGH, reduced to LOW with the listed controls in place.

Crew members starting work unaware of site emergency procedures, exclusion zones or concurrent activities nearbyMEDIUM

Arises at step: Plan the task and walk the work area with the crew. Initial risk MEDIUM, reduced to LOW with the listed controls in place.

Pedestrians or other trades entering the work zone and being struck by moving materials or plantHIGH

Arises at step: Set up, barricade and sign the work area. Initial risk HIGH, reduced to LOW with the listed controls in place.

Trip hazards from power leads, hoses and stored materials run across walkways and access routesMEDIUM

Arises at step: Set up, barricade and sign the work area. Initial risk MEDIUM, reduced to LOW with the listed controls in place.

Sprains and strains from lifting packs or units over 20 kg, or repetitive carrying over distanceMEDIUM

Arises at step: Unload, move and stack materials. Initial risk MEDIUM, reduced to LOW with the listed controls in place.

Crush injuries to hands or feet from shifting, sliding or toppling stacked materialsMEDIUM

Arises at step: Unload, move and stack materials. Initial risk MEDIUM, reduced to LOW with the listed controls in place.

Saw or grinder kickback striking the operator's hand or thighHIGH

Arises at step: Inspect and operate powered plant and tools. Initial risk HIGH, reduced to MEDIUM with the listed controls in place.

Electric shock from damaged flexible leads or faulty portable toolsHIGH

Arises at step: Inspect and operate powered plant and tools. Initial risk HIGH, reduced to LOW with the listed controls in place.

Hearing damage from sustained plant noise above 85 dB(A)MEDIUM

Arises at step: Inspect and operate powered plant and tools. Initial risk MEDIUM, reduced to LOW with the listed controls in place.

Falls from stepladders or low platforms while working above ground levelHIGH

Arises at step: Carry out the main work activity. Initial risk HIGH, reduced to MEDIUM with the listed controls in place.

Airborne dust generated by cutting, grinding or dry sweeping inhaled by the operator and nearby workersMEDIUM

Arises at step: Carry out the main work activity. Initial risk MEDIUM, reduced to LOW with the listed controls in place.

New hazards arising mid-task β€” weather change, overhead work by another trade, or mobile plant moving nearby β€” not covered by the original JSAMEDIUM

Arises at step: Manage changed conditions and interaction with other trades. Initial risk MEDIUM, reduced to LOW with the listed controls in place.

Lacerations and puncture wounds from offcuts, nails and sharp waste during clean-upMEDIUM

Arises at step: Progressive housekeeping and waste removal. Initial risk MEDIUM, reduced to LOW with the listed controls in place.

Manual handling strain from lifting overfilled waste bags and binsMEDIUM

Arises at step: Progressive housekeeping and waste removal. Initial risk MEDIUM, reduced to LOW with the listed controls in place.

Plant, tools, leads or barricades left behind creating hazards for following trades or the publicMEDIUM

Arises at step: Demobilise, reinstate the area and sign off. Initial risk MEDIUM, reduced to LOW with the listed controls in place.

Control measures

Hierarchy-of-controls order: elimination β†’ substitution β†’ isolation β†’ engineering β†’ administrative β†’ PPE.

  1. 1Elimination β€” Obtain current service plans (Before You Dig Australia) and plan the task to avoid live services entirely where possible
  2. 2Isolation β€” Arrange de-energisation, isolation or physical barriers for services that cannot be avoided, confirmed before work starts
  3. 3Administrative β€” Visually locate, trace and mark service positions during the pre-start walk and record them on the JSA
  4. 4Administrative β€” Hold a pre-start briefing covering the JSA steps, site emergency plan, assembly point and any concurrent trades; all workers sign on to the JSA
  5. 5Isolation β€” Establish a physical exclusion zone with barricades or para-webbing around the work front before any work starts
  6. 6Administrative β€” Post signage at each approach and brief adjoining trades on the exclusion zone and its duration
  7. 7Engineering β€” Route leads and hoses overhead on lead stands or hooks, clear of walkways
  8. 8Administrative β€” Designate material laydown areas away from access routes and keep walkways clear throughout the task
  9. 9Engineering β€” Use mechanical aids β€” trolley, pallet jack or crane-assisted delivery to the work front β€” instead of manual carrying
  10. 10Administrative β€” Use two-person lifts for awkward or heavy items and store frequently used materials between knee and shoulder height
  11. 11Engineering β€” Stack on firm level ground using dunnage, restrain tall stacks, and keep stack heights within stable limits
  12. 12PPE β€” Wear gloves and safety boots when handling and breaking down stacks
  13. 13Engineering β€” Confirm guards are fitted and functional and anti-kickback features are engaged before each use; tag out defective tools
  14. 14Administrative β€” Only operators with a verified competency use the tool; maintain a firm two-handed grip and secure the workpiece before cutting
  15. 15PPE β€” Wear safety glasses and gloves rated for the task
  16. 16Engineering β€” Run all portable electrical tools through RCD protection
  17. 17Administrative β€” Check test-and-tag currency and visually inspect leads and casings before use; remove damaged items from service immediately
  18. 18Substitution β€” Select the quietest plant available for the task
  19. 19Administrative β€” Rotate operators to limit individual exposure time
  20. 20PPE β€” Wear Class 5 hearing protection (AS/NZS 1270) whenever noisy plant is running
  21. 21Elimination β€” Redesign the task to be done from ground level where practicable (for example, pre-assemble components before installation)
  22. 22Engineering β€” Use podium steps or platform ladders with guardrails instead of stepladders for sustained work at height
  23. 23Administrative β€” Maintain three points of contact on ladders and never overreach; reposition instead
  24. 24Engineering β€” Use on-tool dust extraction or wet-cutting methods to suppress dust at the source
  25. 25PPE β€” Wear a fitted P2 respirator (AS/NZS 1716) during dust-generating work
  26. 26Administrative β€” Stop work when conditions change, reassess, amend the JSA and re-brief the crew before resuming
  27. 27Isolation β€” Establish exclusion zones beneath any overhead work and around mobile plant paths before continuing
  28. 28Engineering β€” Locate waste bins at the work front so sharp waste goes straight into containment
  29. 29Administrative β€” Clean up progressively during the task rather than in one end-of-day push
  30. 30PPE β€” Wear cut-resistant gloves when handling waste
  31. 31Engineering β€” Use wheeled bins or a trolley to move waste to the disposal point
  32. 32Administrative β€” Do not overfill bags or bins; keep individual loads within comfortable lifting limits
  33. 33Administrative β€” Complete an end-of-task inspection against the JSA before leaving; supervisor signs off that the area is reinstated
  34. 34Isolation β€” Remove barricades only once the area is confirmed safe, or leave them secured if hazards remain and notify site management

Applicable Codes of Practice

How to Manage Work Health and Safety Risks Code of Practiceβš– Legally binding Β· 1 Jul 2026

The risk-management method this JSA applies β€” identify hazards, assess risk, control via the hierarchy, and review.

High-Risk Construction Work triggered

Legal consequence

If the task you adapt this template to involves high-risk construction work as defined in regulation 291 of the model WHS Regulations (in Victoria, the equivalent provisions of the OHS Regulations 2017), a Safe Work Method Statement must be prepared before that work starts. Completing this JSA does not discharge the SWMS duty β€” in those situations the JSA supplements the SWMS with task-level planning detail, and both should be in place.

Who this is for

  • β†’Sole traders and small contractors who need a professional, ready-to-adapt JSA format
  • β†’Site supervisors and leading hands preparing task briefings and toolbox talks
  • β†’Businesses tendering for work where JSAs are a contractual or principal-contractor requirement
  • β†’Safety coordinators building a task-based risk assessment library across multiple crews
  • β†’Maintenance and facilities teams documenting one-off or non-routine tasks

What you receive

  • βœ“Fully formatted, editable Microsoft Word (DOCX) Job Safety Analysis template
  • βœ“A complete worked example: a typical construction task broken into 8 sequential steps with concrete hazards, controls and hierarchy tags
  • βœ“Before-and-after risk rating columns using a simple High / Medium / Low scale, with a risk matrix included
  • βœ“Ready-to-adapt PPE, training, and emergency response sections referencing current Australian Standards
  • βœ“Worker sign-on and supervisor sign-off sections with review triggers built in
  • βœ“One-off purchase β€” edit and reuse the template for unlimited tasks within your business

Worked example

A Job Safety Analysis breaks one task into its sequential steps, then identifies the hazards, initial risk, controls and residual risk at each step before work begins. This universal JSA template is built around a fully worked example β€” a typical construction task taken from pre-start planning through site setup, materials handling, plant and tool operation, the work activity itself, housekeeping and demobilisation. Every step, hazard and control is written as a realistic starting point that you edit to match your own trade, task and site conditions. The format follows accepted Australian WHS risk-management practice: hierarchy-of-controls tagging on every control, before-and-after risk ratings, worker sign-on, and prompts to stop and reassess when conditions change.

Related legislation

  • Work Health and Safety Act and Regulations of your state or territory (in Victoria, the OHS Act 2004 and OHS Regulations 2017)
  • How to Manage Work Health and Safety Risks Code of Practice
  • Where the task is high-risk construction work: the SWMS provisions of your jurisdiction (a JSA supplements, and does not replace, a required SWMS)

Frequently asked questions

Do I still need a SWMS if I complete this JSA?

Sometimes, yes. If your task includes high-risk construction work as defined in regulation 291 of the model WHS Regulations β€” for example work where a person could fall more than 2 metres, work in or near a trench deeper than 1.5 metres, or work near energised electrical installations β€” the law requires a Safe Work Method Statement before that work starts. A JSA does not satisfy that duty. In those cases the JSA supplements the SWMS with task-level detail; it never replaces it. For tasks that are not high-risk construction work, a well-completed JSA is an accepted way to meet your general risk-management duties.

What is the difference between a JSA and a SWMS?

A JSA is a general risk-management tool: it breaks one task into sequential steps and records the hazards, risk ratings and controls for each step. A SWMS is a specific document the WHS Regulations require for high-risk construction work under regulation 291, and it must describe the high-risk work, its hazards and the control measures. Many principal contractors ask for both β€” the SWMS to meet the legislated duty, and JSAs for day-to-day task planning.

Can I adapt this template to any trade or task?

Yes β€” that is what it is designed for. The worked example follows a typical construction task from planning through to demobilisation, but every step, hazard, rating and control is plain editable text in Word. Keep the step-by-step structure and the hierarchy-of-controls tagging, and replace the example content with the specifics of your own task, whether that is a trade activity, maintenance work, or a workshop process.

Who should complete and sign the JSA?

The supervisor or leading hand should prepare it together with the workers who will actually do the task β€” they know the practical hazards best, and consultation is a duty under WHS law. Before work starts, brief the crew on the final JSA and have every worker sign on. Anyone joining the task later should read and sign it before starting.

When should the JSA be reviewed or updated?

Review it before each use, whenever site conditions or the work method change, when new plant, substances or trades are introduced, and after any incident or near miss involving the task. If conditions change mid-task, stop work, amend the JSA, re-brief the crew and have them sign the revised version before resuming.

What's in this SWMS

Document details

Regulation
General duty of care under the applicable WHS/OHS Act. A JSA is a task-level risk analysis tool β€” where the work is high-risk construction work, a SWMS is required in addition and this JSA supplements it.
HRCW Category
Not HRCW β€” task-level JSA supplementing any required SWMS
Hazards Identified
15 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment