Office Fit-Out SWMS
Commercial office fit-out covering partition install, suspended ceiling install, electrical and data cable rough-in, light fitting install, carpet and floor laying, joinery (workstations, meeting rooms, kitchenette), HVAC ductwork modifications, and signage.
SWMS variants reference your stateβs WHS legislation. Instant download after payment.
Commercial office fit-out including partitions, suspended ceilings, electrical/data rough-in, lighting, flooring, joinery, HVAC ductwork and signage. Triggers HRCW under WHS Regulation 2025 Schedule 1 for heights and energised electrical work.
Hazards identified
3 hazards covered, sorted by priority.
Fractures, head injury, fatality
Electrocution, arc flash burns
Crush, strain, laceration injuries
Control measures
Hierarchy-of-controls order: elimination β substitution β isolation β engineering β administrative β PPE.
- 1Use rated mobile scaffold or EWP above 2m; ladders for access only.
- 2Isolate, LOTO and test dead per AS/NZS 4836 before electrical work.
- 3Two-person lift partition sheets; brace top plates until fixed.
Applicable Codes of Practice
Suspended ceiling design and installation loads
Electrical wiring rules for rough-in and fit-off
High-Risk Construction Work triggered
Ceiling grid, light fitting and HVAC duct work above 2m.
SWMS mandatory before work; PCBU fines to $30,000.
What you receive
- βEditable DOCX template β Microsoft Word compatible
- βState-specific WHS legislation schedule (NSW/VIC/QLD/SA/WA/TAS/NT/ACT)
- βHazard register with risk ratings + controls
- βWorker sign-on register and pre-start checklist
Related legislation
- WHS Act 2011 (model)
- WHS Regulation 2025
- AS/NZS 3000 β Electrical installations