Fit-out & Finishing SWMS Templates
Commercial fit-out, joinery, and specialist installation.
About these SWMS
Fit-out and finishing covers commercial joinery, kitchen and bathroom installation, shop fitting, partition systems, fire-rated penetrations, fire services, swimming pool construction, and specialist interior installations across new-build and refurbishment projects. SWMS templates in this category address the High Risk Construction Work triggers under section 291 of the Work Health and Safety Regulations 2025 β including work at height over 2 metres, work on or near energised electrical installations, and work in or near confined spaces β and align with the Construction Work Code of Practice, AS/NZS 3000:2018 Wiring Rules for fixed wiring interfaces, and AS 4586 for slip-resistant finishes. Content is state-neutral and suitable for harmonised WHS jurisdictions including NSW, QLD, VIC, SA, WA, TAS, ACT and NT.
What this category covers
- βJoinery fabrication, cabinet assembly and on-site installation
- βKitchen, laundry and bathroom cabinetry and stone benchtop installation
- βShop fitting, retail display and commercial office fit-out
- βOffice partition wall, glazed partition and demountable wall installation
- βFire door, fire window and fire-rated penetration sealing
- βFire services installation including sprinkler and hydrant systems
- βSwimming pool shell construction, tiling and equipment commissioning
- βPool chemical dosing systems and chlorine handling installations
- βCommercial kitchen fit-out including gas, mechanical and drainage
- βOffice furniture, workstation and modular system assembly
- βInternal trim, skirting, architrave and decorative finishing
- βSpecialist hardware, ironmongery and access control installation
22 SWMS in this category
22 ready-to-buy editable DOCXs Β· 8 state variants per product Β· available for instant download.
Shopfitting
13 SWMSπ οΈCommercial Kitchen Fitout SWMS
NSW β Commercial Kitchen Fitout. Full task scope, hazards and controls to be authored to Phase 1 standard.
π οΈDemountable Partition Installation SWMS
NSW β Demountable Partition Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.
π οΈJoinery & Cabinetry Installation SWMS
NSW β Joinery & Cabinetry Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.
π οΈModular Furniture Installation SWMS
NSW β Modular Furniture Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.
π οΈOffice Fitout & Partitioning SWMS
NSW β Office Fitout & Partitioning. Full task scope, hazards and controls to be authored to Phase 1 standard.
π οΈShopfitting - General SWMS
NSW β Shopfitting - General. Full task scope, hazards and controls to be authored to Phase 1 standard.
π οΈSignage Installation - Internal SWMS
NSW β Signage Installation - Internal. Full task scope, hazards and controls to be authored to Phase 1 standard.
Joinery Cabinet Making
5 SWMSπͺJoinery/Cabinets SWMS
Workshop and on-site joinery, custom cabinetry, benchtop installation, and fit-out carpentry.
π¨Commercial Shopfront Joinery Install SWMS
SWMS template for commercial shopfront joinery install. Covers Retail bump-in, aluminium framing, counter joinery.. 8-state AU coverage, CIHβ¦
π¨Joinery / Cabinet Install β On-Site SWMS
SWMS template for joinery / cabinet install β on-site. Covers Workshop-built joinery installed on site.. 8-state AU coverage, CIH-reviewed eβ¦
Ceiling Fixing
3 SWMSπBulkhead & Feature Ceiling SWMS
Installing bulkheads and feature ceilings - steel furring framing, curved and stepped sections and plasterboard lining - working from platfoβ¦
πͺSuspended Grid Ceiling Install SWMS
Installing suspended exposed-tee grid ceilings - hanging wires, perimeter angle, main and cross tees and lay-in tiles - working from platforβ¦
Kitchen Installation
3 SWMSπ³Kitchen Install SWMS
Kitchen joinery installation including cabinets, benchtops, sinks, and appliance integration.
π³Stone Benchtop Install (Post-Fab) SWMS
SWMS template for stone benchtop install (post-fab). Covers natural stone, porcelain and sintered slab installation, plus controlled work onβ¦
Data Centre Electrical
1 SWMSπData-Centre Power & Battery SWMS
Installing data-centre power - overhead and underfloor busbar, uninterruptible power supply and lithium-ion battery energy storage racks - mβ¦
Fire Protection
1 SWMSπ§―AFFF / PFAS System Decommission SWMS
AFFF/PFAS fire suppression system decommission SWMS for NSW. PFAS exposure control, no environmental release, confined-space tank entry, decβ¦
Fire Suppression
1 SWMSπ§―Clean-Agent Suppression SWMS
Installing and commissioning a clean-agent (gaseous) total-flooding fire suppression system - high-pressure agent cylinders, discharge pipewβ¦
Gas Fitting
1 SWMSπ₯Commercial Gas Appliance SWMS
Installing, connecting and commissioning commercial gas appliances - kitchen cooking equipment, water heaters and boilers - including pipewoβ¦
Hvac Mechanical
1 SWMSπDuct Attenuator & Acoustic SWMS
Installing duct attenuators (silencers) and acoustic duct lining in HVAC systems at ceiling height, including handling, hoisting and fixing β¦
Refrigeration
1 SWMSβοΈCool-Room & Refrigerant SWMS
Installing, connecting and commissioning a commercial cool-room or refrigeration system - insulated panels, condensing unit and evaporators,β¦
Site Management
1 SWMSπ§Site Mobilisation & Establishment SWMS
Establishing a commercial fit-out site on an occupied or public-facing site: hoarding and temporary fencing, amenities, temporary power, traβ¦
Window Furnishings
1 SWMSπͺWindow Furnishings & Blinds SWMS
Installing blinds, tracks, headrails and window furnishings, including high-set and atrium windows from platforms, with cord-safety complianβ¦
Applicable standards & regulations
Frequently asked questions
Do I need a SWMS for commercial fit-out work or is a JSA enough?
A SWMS is legally required, not optional, whenever the work meets the High Risk Construction Work definition under section 291 of the WHS Regulations 2025 β which most fit-out scopes do, through work above 2 metres, work on or near energised electrical installations, or confined space entry. A JSA is an internal hazard analysis tool with no legal status. The Construction Work Code of Practice requires the SWMS to be prepared before work starts, kept on site, and reviewed if conditions change or an incident occurs.
Is stone benchtop installation High Risk Construction Work under the 2025 regulations?
Yes. Post-fabrication stone benchtop installation is not a section 291 paragraph in its own right, but on-site cutting, drilling or polishing engages WHS Regulation 2025 Chapter 8A, which requires processing of crystalline silica substances to be controlled and a silica risk control plan under section 529CB where that processing is high risk. The engineered stone prohibition under WHS Regulation 2025 Part 7.1 bans fabrication but installation of pre-fabricated tops continues under strict controls. SWMS must address dust suppression, on-tool extraction to AS/NZS 60335.2.69, respiratory protection to AS/NZS 1716, and two-person manual handling for slabs typically exceeding 25 kg.
What controls are required for chlorine gas and acid dosing in pool plant rooms?
Pool chemical dosing falls under the Hazardous Chemicals Code of Practice and WHS Regulation 2025 Chapter 7. Required controls include segregated storage of acids and hypochlorites to prevent chlorine gas generation, mechanical ventilation, emergency eyewash and shower compliant with AS 4775:2007, gas detection where bulk chlorine is used, and a manifest if quantities exceed Schedule 11 thresholds. SWMS must cover decanting, line-breaking, emergency response and PPE including chemical splash suits and SCBA where applicable.
Do I need a state-specific SWMS for fit-out work in NSW, VIC or QLD?
Under the harmonised WHS framework, the core SWMS content is consistent across NSW, QLD, VIC, SA, WA, TAS, ACT and NT β all of which adopt the model WHS Regulations 2025 and Construction Work Code of Practice. State variations exist mainly in notification thresholds, licensing for specific trades, and regulator names. A well-structured SWMS template is jurisdiction-neutral provided it cites the model regulation clauses and is signed by workers on the specific site before work commences.
Who is responsible for the SWMS β the head contractor or the fit-out subcontractor?
Under WHS Regulation 2025 section 299, the PCBU carrying out the High Risk Construction Work β typically the fit-out subcontractor β must prepare the SWMS. The principal contractor has a separate duty under clause 309 to obtain a copy before work starts and to ensure work is carried out in accordance with it. Both duties run concurrently. The Construction Work Code of Practice clarifies that consultation with workers performing the task is mandatory during SWMS preparation.
Fit-out & Finishing SWMS
Editable DOCX templates, 8 state variants per product, CIH-reviewed.
Browse all SWMS