Office Fitout & Partitioning SWMS
NSW β Office Fitout & Partitioning. Full task scope, hazards and controls to be authored to Phase 1 standard.
SWMS variants reference your stateβs WHS legislation. Instant download after payment.
Office fitout and partitioning covers the installation of demountable and framed partition systems, suspended ceilings, workstations, joinery, glazed office fronts and associated services in commercial tenancies. Work is typically undertaken above 2 metres from mobile scaffolds, order pickers or step platforms, involves cutting and fixing steel stud, plasterboard, MDF and glazing, and often occurs in partially occupied buildings where other trades, tenants and cleaners share the space. The combination of working at height, powered hand tools, respirable crystalline silica dust from cutting plasterboard-and-fibre-cement systems, potential asbestos-containing material (ACM) in pre-1990 base-build fabric, and live services makes this a high-consequence activity.
Under the Work Health and Safety Regulation 2025 (NSW), section 291 defines high risk construction work (HRCW) to include work with a risk of a fall of more than 2 metres. Section 299 requires a Safe Work Method Statement to be prepared before the work commences, kept available for inspection, and complied with. Controls must be applied in the hierarchy set out in section 36 of the Regulation, prioritising elimination of the fall risk before relying on fall protection or PPE.
Hazards identified
12 hazards covered, sorted by priority.
Fatal or serious head, spinal and internal injuries
Mesothelioma, asbestosis, lung cancer (latent)
Silicosis, lung cancer, chronic obstructive pulmonary disease
Electrocution, arc flash burns, cardiac arrest
Crush injury, tip-over, entrapment against fixed structure
Deep lacerations, crush injuries, penetrating trauma
Projectile injury, hearing damage, hand injury
Shoulder, back and cervical spine injuries
Noise-induced hearing loss, tinnitus
Fractures, sprains, secondary impact injuries
Structure fire, smoke inhalation, sprinkler discharge damage
Injury to non-workers, complaints, regulatory intervention
Control measures
Hierarchy-of-controls order: elimination β substitution β isolation β engineering β administrative β PPE.
- 1Eliminate work at height where possible by pre-assembling partition frames and pre-glazing at ground level, then lifting complete panels into position
- 2Where fall risk remains, provide an EWP (order picker or scissor lift) selected and used in accordance with AS 2550.10 in preference to mobile scaffold; ladders are not to be used as a work platform for partition fixing
- 3Mobile scaffolds erected and inspected in accordance with AS/NZS 1576.1 and AS/NZS 1576.3 by a competent person; guardrails, mid-rails and toe boards to all open sides above 2 m
- 4Before penetrating any existing structure, obtain the base-build asbestos register and, where the tenancy pre-dates 1990 or the register is unavailable, engage a licensed asbestos assessor; any confirmed ACM removal only by a Class A/B licensed removalist per sections 419β487 of the WHS Regulation 2025
- 5Control silica dust at source using on-tool H-class extraction (AS/NZS 60335.2.69) or wet-cutting; prohibit uncontrolled dry-cutting of fibre-cement and compressed sheet; RPE selected to AS/NZS 1715/1716 with a minimum P2 half-face where residual dust remains
- 6De-energise and isolate circuits in the work zone under a permit to work; verify dead with a tested voltage indicator; use cable locators before core-drilling or chasing walls and floors
- 7Establish exclusion zones around EWPs and glazing installation with hard barriers and signage; separate fitout works from occupied areas with dust-proof hoardings and negative-air where required
- 8Two-person handling, mechanical suction lifters and glass trolleys for panels exceeding 25 kg or 2 m in any dimension; edge-protected storage racks; cut-resistant gloves to AS/NZS 2161.3
- 9Hot works (including grinding on fire-rated systems) under a written hot work permit with a fire watch, extinguisher and 30-minute post-work watch; isolate smoke detectors through building management with reinstatement checklist
- 10PPE issued and maintained: safety helmet (AS/NZS 1801), safety eyewear (AS/NZS 1337.1), hearing protection (AS/NZS 1270) matched to measured exposure, and safety footwear (AS/NZS 2210.3)
- 11Housekeeping regime: end-of-task clean-down using H-class vacuums, waste segregation, and daily inspection of walkways; toolbox talks each shift covering the day's tasks and interfaces with other trades
- 12All workers hold CPCCWHS1001 (White Card); the SWMS is developed in consultation with workers under section 47 of the WHS Act 2011 (NSW), signed by each worker before commencement, and reviewed under section 302 of the WHS Regulation 2025 whenever controls are revised, an incident occurs, or the work method changes
Applicable Codes of Practice
Primary code for the s291(a) fall-from-height trigger; sets the hierarchy for eliminating or minimising fall risk during partition, ceiling and high-level fitout works
Governs SWMS content, HRCW identification and principal contractor duties applicable to commercial fitout projects
Sets the risk management process and application of the hierarchy of controls under section 36 of the WHS Regulation 2025
Design, erection and inspection standard for mobile and modular scaffolds used to install partitions and ceilings
High-Risk Construction Work triggered
Fixing top tracks, ceiling grids, bulkheads and high-level glazing routinely places workers on EWPs or mobile scaffold platforms above 2 m; fall exposure exists during setout, sheet fixing, service penetrations and ceiling tile installation
Because this work is HRCW under section 291, a compliant SWMS is mandatory under section 299 of the WHS Regulation 2025 (NSW) before work commences, must be readily accessible on site, and must be reviewed under section 302 if controls change or an incident occurs. Failure to prepare, comply with, or produce a SWMS is an offence. A breach of the primary duty of care under sections 19 and 20 of the WHS Act 2011 (NSW) that exposes a person to a risk of death or serious injury may be prosecuted as a Category 2 offence under section 32, or as a Category 1 offence under section 31 where recklessness or gross negligence is established. Current maximum penalties are set by the SafeWork NSW penalty schedule in force at the time of the offence.
Who this is for
- βCommercial shopfitters and office fitout contractors installing partitioning, ceilings and joinery in NSW tenancies
- βPrincipal contractors coordinating multi-trade fitout works who must obtain and consolidate SWMS under section 309 of the WHS Regulation 2025
- βSubcontract carpenters, plasterers and glaziers engaged on category 1, 2 and 3 fitout projects
- βProject managers and site supervisors responsible for tenant-occupied and after-hours fitout works
- βWHS managers auditing SWMS compliance for shopfitting and interior construction crews
What you receive
- βEditable Microsoft Word SWMS pre-populated for NSW office fitout and partitioning works
- βHRCW identification aligned to section 291(a) β fall risk greater than 2 metres β with supporting justification
- βFull hazard register with consequence rating and residual risk after controls applied
- βHierarchy-of-controls table cross-referenced to the WHS Regulation 2025 (NSW) and applicable AS/NZS standards
- βWorker sign-on and consultation record satisfying section 47 of the WHS Act 2011 (NSW)
- βSWMS review and revision log satisfying section 302 of the WHS Regulation 2025
- βPlant and equipment pre-start checklists for EWPs, mobile scaffolds and powered hand tools
- βPermit templates for hot works, electrical isolation and penetrations
- βEmergency response and incident notification guidance referencing section 38 of the WHS Act
Worked example
A shopfitting contractor is engaged to fit out Level 12 of a commercial tower on George Street, Parramatta. Scope includes 240 lineal metres of framed partitioning to 3.6 m, a suspended plasterboard ceiling, three glazed office fronts and integration with the existing base-build sprinkler and mechanical services. The building was constructed in 1987, so the principal contractor issues the base-build asbestos register β vinyl floor tiles in the core lift lobby are identified as ACM and excluded from the works. The shopfitter's SWMS identifies the s291(a) fall-from-height HRCW trigger and specifies scissor lifts for top-track fixing rather than A-frame ladders. Plasterboard offcuts are cut with track saws fitted with H-class extraction. Prior to penetrating the slab for bottom-track fixing, circuits are isolated through the base-build electrician and a cable locator sweep is completed. The SWMS is signed on by all six workers, reviewed after week two when a change to the ceiling detail requires additional overhead work, and produced on request during a SafeWork NSW site visit.
Related legislation
- Work Health and Safety Act 2011 (NSW)
- Work Health and Safety Regulation 2025 (NSW)
- Protection of the Environment Operations Act 1997 (NSW) β construction noise and waste
- Environmental Planning and Assessment Act 1979 (NSW) β after-hours work approvals
- Electricity Supply (Safety and Network Management) Regulation 2014 (NSW)
- Building Code of Australia (National Construction Code) β fire-rated construction compliance
Frequently asked questions
Is a SWMS legally required for internal office partitioning if the ceiling is only 2.7 m high?
Yes. Under section 291 of the WHS Regulation 2025 (NSW), the trigger is a risk of a fall of more than 2 metres β not the ceiling height. A worker standing on a 1 m scissor lift platform to fix a top track at 2.7 m is exposed to a fall of more than 2 m and section 299 requires a SWMS before that work commences.
Does this SWMS cover asbestos removal encountered during strip-out?
No. This SWMS addresses identification of suspected ACM and the immediate stop-work and isolation response. Removal of friable or more than 10 mΒ² of non-friable ACM must be performed by a licensed asbestos removalist under a separate asbestos removal control plan as required by sections 419β487 of the WHS Regulation 2025 (NSW).
Who signs the SWMS on a fitout project with multiple subcontractors?
Each PCBU carrying out the high risk construction work must prepare a SWMS for their scope. Every worker performing that scope signs on before starting. The principal contractor collects and holds each SWMS under section 309 of the WHS Regulation 2025 (NSW) for the duration of the work.
How often must the SWMS be reviewed?
Section 302 of the WHS Regulation 2025 (NSW) requires review whenever controls are revised, a notifiable incident occurs, the work method changes, or a health and safety representative requests review. In practice, we recommend review at each stage change (strip-out, framing, ceilings, glazing) and after any near miss.
Document details
Related SWMS templates
π οΈCommercial Kitchen Fitout SWMS
NSW β Commercial Kitchen Fitout. Full task scope, hazards and controls to be authored to Phase 1 standard.
π§±Acoustic Ceiling Tile Installation SWMS
NSW β Acoustic Ceiling Tile Installation. Full task scope, hazards and controls to be authored to Phase 1 stanβ¦
π’Aluminium Composite Panel Installation SWMS
NSW β Aluminium Composite Panel Installation. Full task scope, hazards and controls to be authored to Phase 1 β¦
π§Artificial Turf Installation SWMS
NSW β Artificial Turf Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.
β£οΈAsbestos Soil Remediation SWMS
NSW β Asbestos Soil Remediation. Full task scope, hazards and controls to be authored to Phase 1 standard.
π¨Asbestos-Containing Material Demolition SWMS
NSW β Asbestos-Containing Material Demolition. Full task scope, hazards and controls to be authored to Phase 1β¦