Commercial Kitchen Fitout SWMS
NSW β Commercial Kitchen Fitout. Full task scope, hazards and controls to be authored to Phase 1 standard.
SWMS variants reference your stateβs WHS legislation. Instant download after payment.
Commercial kitchen fitout involves the installation of stainless steel benches, cooking suites, exhaust canopies, refrigeration, gas distribution piping and three-phase electrical services within tight, occupied or newly constructed hospitality premises. The work combines structural fixing at height (canopy and duct suspension), penetrations through fire-rated construction, gas fitting to appliances and manifolds, and connection of energised switchboards. Manual handling of heavy prefabricated modules through narrow access, hot works during ductwork modification, and coordination with wet trades create overlapping hazards in a compressed program.
Under the Work Health and Safety Regulation 2025 (NSW), section 291, this scope constitutes high risk construction work because it involves a risk of a fall of more than 2 metres, work on or near pressurised gas distribution mains or piping, and work on or near energised electrical installations. Section 299 therefore requires a Safe Work Method Statement to be prepared before the work commences. Controls follow the hierarchy in section 36, prioritising elimination and engineering solutions over administrative measures and PPE.
Hazards identified
12 hazards covered, sorted by priority.
Fatal or serious head, spinal and multi-trauma injuries from falls to hard tiled or concrete floors
Flash fire, explosion, severe burns and fatality; asphyxiation in enclosed plant rooms
Electrocution, arc flash burns, cardiac arrest
Structural fire, smoke inhalation, business interruption and injury to occupants
Silicosis, accelerated silicosis, lung cancer (long-latency)
Mesothelioma, asbestosis, lung cancer
Acute back injury, crush injuries to hands and feet, musculoskeletal disorders
Deep lacerations to hands, forearms and lower legs
Fractures, sprains, secondary impact with fixtures
Noise-induced hearing loss, tinnitus
Heat stress, entrapment, delayed rescue in emergency
Occupational asthma, dermatitis, respiratory sensitisation
Control measures
Hierarchy-of-controls order: elimination β substitution β isolation β engineering β administrative β PPE.
- 1Eliminate work at height where possible by pre-assembling canopy sections and duct runs at ground level and lifting as complete modules using mechanical aids.
- 2Substitute wet-cut core drilling and water-fed masonry saws for dry cutting to suppress respirable crystalline silica at source, in accordance with AS/NZS 60335.2.69 for wet extraction where applicable.
- 3Engineer fall protection using mobile scaffolds or elevating work platforms compliant with AS/NZS 1576 and AS 2550.10; edge protection and guardrails are the primary control for any work surface above 2 m.
- 4Isolate gas supply at the meter or upstream valve, purge lines to atmosphere via an approved vent, and pressure-test all new work to AS/NZS 5601.1 before commissioning; a licensed gasfitter must perform and certify all gas work.
- 5De-energise electrical circuits, apply lock-out/tag-out and verify dead with a tested voltage indicator in accordance with AS/NZS 4836; all installation work performed by a licensed electrician and tested/certified to AS/NZS 3000.
- 6Implement a hot work permit system with 30-minute fire watch, charged extinguisher, welding blankets and isolation of smoke detectors coordinated with the building manager; comply with AS 1674.1 for fire precautions during welding and cutting.
- 7Prior to demolition, review the building asbestos register (mandatory for pre-31/12/2003 structures under WHS Regulation 2025 s425) and engage a licensed removalist for any identified ACM.
- 8Use on-tool H-class HEPA dust extraction for all silica-generating tasks, and provide RPE to AS/NZS 1716 with fit-testing to AS/NZS 1715 where residual exposure exists.
- 9Provide mechanical lifting aids (panel lifters, appliance trolleys, engine cranes) for loads over 25 kg; establish two-person lifts and clear travel paths through the site.
- 10Enforce PPE baseline: safety footwear and eye protection (AS/NZS 1337.1), cut-resistant gloves (AS/NZS 2161.3) when handling stainless, Class 5 hearing protection (AS/NZS 1270) during power tool use, and P2 respirators for dust tasks.
- 11Coordinate with the principal contractor and hospitality client on occupied-premises controls: exclusion zones, after-hours scheduling, and isolation of fire and gas systems affecting neighbouring tenancies.
- 12All workers to hold CPCCWHS1001 (White Card); conduct daily pre-start briefings on the SWMS and consult workers on control changes in accordance with WHS Act 2011 (NSW) section 47, and review the SWMS under WHS Regulation 2025 section 302 whenever controls, personnel or scope change.
Applicable Codes of Practice
Sets the framework for SWMS preparation, HRCW identification and construction site risk management applicable to the fitout.
Directs the hierarchy of fall controls used for canopy, duct and ceiling-service installation above 2 m.
Governs design, installation, pressure testing and commissioning of natural gas and LPG piping to commercial cooking appliances.
Mandatory standard for the installation, alteration and verification of electrical services to kitchen equipment and switchboards.
High-Risk Construction Work triggered
Installation of exhaust canopies, ductwork suspension, ceiling-mounted refrigeration lines and services routinely requires access above 2 m from EWPs, scaffolds or platform ladders.
Connection, alteration and pressure testing of natural gas and LPG piping to cooking suites, wok burners and combi ovens brings workers into direct contact with pressurised gas systems.
Terminations at live switchboards, isolators and three-phase appliance connections cannot always be fully de-energised where adjacent tenancies remain in operation.
Under WHS Regulation 2025 (NSW) section 299, a SWMS must be prepared before HRCW commences and section 302 requires review whenever controls change. Failure to control an HRCW risk may constitute a Category 1 offence (reckless conduct) under section 31 or a Category 2 offence under section 32 of the WHS Act 2011 (NSW). Penalties applicable to individuals, officers and body corporates are set out in the current SafeWork NSW penalty schedule.
Who this is for
- βShopfitting contractors delivering commercial kitchen fitouts to hospitality clients
- βLicensed gasfitters and plumbers connecting cooking equipment and gas trains
- βLicensed electricians installing three-phase and control wiring to kitchen appliances
- βHVAC and canopy installers fabricating and hanging exhaust and make-up air systems
- βPrincipal contractors and project managers coordinating fitout works in occupied or new-build premises
What you receive
- βEditable SWMS in Microsoft Word and PDF, pre-populated for NSW commercial kitchen fitout
- βHRCW register cross-referenced to WHS Regulation 2025 section 291 categories
- βHazard and risk register with pre- and post-control risk scoring
- βHierarchy-of-control mapping citing current AS/NZS standards and SafeWork NSW Codes
- βSign-on sheet, daily pre-start briefing template and consultation record (WHS Act s47)
- βSWMS review log meeting WHS Regulation 2025 section 302 requirements
- βHot work permit, electrical isolation permit and gas pressure test record templates
- βEmergency response and rescue procedure for falls, gas leaks and electrical incidents
- βGuidance notes on integration with the principal contractor's WHS Management Plan
Worked example
A shopfitting subcontractor is engaged to deliver a new 180-cover restaurant fitout in Parramatta, NSW. Scope includes demolition of an existing 1990s tenancy kitchen, installation of a 6-metre stainless exhaust canopy at 2.4 m AFFL, a six-burner cooking suite on a new gas manifold, and three-phase supply to combi ovens from an upgraded distribution board. Because the work triggers s291 categories, a SWMS is prepared before mobilisation and signed by all workers at pre-start. The canopy is pre-assembled at ground level and lifted using a scissor lift with guardrails; gas piping is tested to AS/NZS 5601.1 by a licensed gasfitter and certified before purge and commissioning; electrical terminations are performed under lock-out with a licensed electrician verifying dead. When the client requests an additional wok stove late in the program, the SWMS is formally reviewed under section 302 and workers re-consulted before the varied work proceeds.
Related legislation
- Work Health and Safety Act 2011 (NSW)
- Work Health and Safety Regulation 2025 (NSW)
- Gas and Electricity (Consumer Safety) Act 2017 (NSW)
- Home Building Act 1989 (NSW) β licensing of gasfitting and electrical work
- Environmental Planning and Assessment Act 1979 (NSW) β fitout approvals
- Protection of the Environment Operations Act 1997 (NSW) β construction waste and noise
Frequently asked questions
Do I still need a SWMS if a licensed gasfitter and electrician are doing the high-risk parts?
Yes. Licensing covers the technical work; the SWMS is a separate obligation under WHS Regulation 2025 section 299 that must be prepared by the PCBU carrying out the HRCW before work starts, regardless of the operative's licence.
Does the fitout automatically trigger HRCW if the canopy is only 2.2 m high?
Any risk of a fall of more than 2 metres triggers section 291(a). Installing a canopy at 2.2 m AFFL means workers on platforms will exceed that threshold, so a SWMS is required.
How do we handle asbestos discovered during demolition of an older kitchen?
Stop work in the affected area, review the asbestos register required under WHS Regulation 2025 for pre-2004 structures, and engage a SafeWork NSW licensed asbestos removalist. Update the SWMS under section 302 before recommencing.
When must the SWMS be reviewed?
Under WHS Regulation 2025 section 302, the SWMS must be reviewed and revised if control measures are altered, a notifiable incident occurs, new hazards emerge, or workers raise concerns through consultation under section 47 of the WHS Act.
Document details
Related SWMS templates
πͺKitchen & Bathroom Cabinet Installation SWMS
NSW β Kitchen & Bathroom Cabinet Installation. Full task scope, hazards and controls to be authored to Phase 1β¦
π οΈOffice Fitout & Partitioning SWMS
NSW β Office Fitout & Partitioning. Full task scope, hazards and controls to be authored to Phase 1 standard.
π§±Acoustic Ceiling Tile Installation SWMS
NSW β Acoustic Ceiling Tile Installation. Full task scope, hazards and controls to be authored to Phase 1 stanβ¦
π’Aluminium Composite Panel Installation SWMS
NSW β Aluminium Composite Panel Installation. Full task scope, hazards and controls to be authored to Phase 1 β¦
π§Artificial Turf Installation SWMS
NSW β Artificial Turf Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.
β£οΈAsbestos Soil Remediation SWMS
NSW β Asbestos Soil Remediation. Full task scope, hazards and controls to be authored to Phase 1 standard.