OH Consultant
← All SWMS Documents
⛏️

Detailed Excavation Near Services SWMS

NSW — Detailed Excavation Near Services. Full task scope, hazards and controls to be authored to Phase 1 standard.

⚖️WHS Regulation 2025 & Codes of Practice — legally binding from 1 July 2026 (s26A)
👷Reviewed by certified occupational health and safety professionals
🗺️State-specific variants for all 8 Australian jurisdictions
$249 AUD✓ Instant Download Available

SWMS variants reference your state’s WHS legislation. Instant download after payment.

Detailed excavation near services is excavation carried out close to live underground utilities — gas mains, electrical cables, water, and fuel or chemical lines. It is high risk construction work under the WHS Regulation because it is carried out in a trench deeper than 1.5 m, on or near pressurised gas mains and chemical or fuel lines, on or near energised electrical services, and with the movement of powered mobile plant (s291), so a SWMS is mandatory (s299). The central hazard is the trench itself — collapse once depth exceeds 1.5 m buries workers in seconds — but the defining feature of this work is the proximity of live services. An excavator bucket or hand tool striking a pressurised gas main causes fire and explosion; striking an energised cable electrocutes the operator and crew; striking a fuel or chemical line releases hazardous product. Because the services are buried and not always where the plans say, the controls turn on knowing exactly where each service is before any machine digs near it. The SWMS sequences services location, hand and vacuum excavation in proximity zones, trench support, and plant separation. It is supplied in eight jurisdiction editions, each citing its own Act, Regulation and regulator, with service-asset duties left to the applicable state legislation and the relevant network operators.

Hazards identified

8 hazards covered, sorted by priority.

Trench or excavation collapse once depth exceeds 1.5 mHIGH

Crush fatality or burial of workers in the trench (central HRCW)

Excavator or tool strike on a pressurised gas mainHIGH

Fire, explosion and fatal injury (WHS Reg s291 — near pressurised gas)

Strike on an energised underground electrical cableHIGH

Electrocution of the operator and crew (WHS Reg Part 4.7)

Strike on a fuel, chemical or refrigerant lineHIGH

Hazardous product release, fire or chemical exposure

Powered mobile plant strike on workers in and around the excavationHIGH

Crush or struck-by fatality

Services located incorrectly or not at all before diggingHIGH

Unexpected strike on an unmarked live asset

Hazardous or oxygen-deficient atmosphere in the trenchMEDIUM

Asphyxiation or exposure in the excavation

Public access into the excavation or work zoneMEDIUM

Falls into the trench and public exposure

Control measures

Hierarchy-of-controls order: elimination → substitution → isolation → engineering → administrative → PPE.

  1. 1Elimination — Where practicable, relocate or de-energise/depressurise and isolate the service before excavating so the live asset is removed from the dig zone
  2. 2Substitution — Substitute non-destructive (vacuum) excavation and hand digging for mechanical excavation within the service proximity zone
  3. 3Engineering — Battered or shored trench faces designed for the soil class to prevent collapse beyond 1.5 m
  4. 4Engineering — Positive services location — dial-before-you-dig, ground-penetrating survey and potholing — with assets physically exposed and marked before machine digging
  5. 5Engineering — Plant separation, exclusion zones and spotters keeping powered mobile plant clear of workers and exposed services
  6. 6Administrative — Permit to excavate, services-proximity procedure and coordination with the relevant network operators and the applicable state legislation
  7. 7Administrative — Atmospheric testing of the trench where contamination or gas ingress is possible, with ventilation as required
  8. 8Administrative — Public exclusion, barriers and reinstatement so the open excavation is never left unprotected
  9. 9PPE — Hard hat, high-visibility clothing, gloves and steel-toe boots; insulated PPE where a cable strike is credible
  10. 10PPE — Respiratory protection where the trench atmosphere may be contaminated

Applicable Codes of Practice

Excavation Work Code of Practice⚖ Legally binding · 1 Jul 2026

Central code for trench collapse prevention and services proximity

Construction Work Code of Practice⚖ Legally binding · 1 Jul 2026

General construction duties and SWMS requirements

Managing Electrical Risks in the Workplace Code of Practice⚖ Legally binding · 1 Jul 2026

Duties for work near energised underground cables

Managing the Risks of Plant in the Workplace Code of Practice⚖ Legally binding · 1 Jul 2026

Duties for powered mobile plant around the excavation

AS 5488 Classification of subsurface utility information

Standard for locating and classifying buried services

AS 2885 Pipelines — Gas and liquid petroleum

Reference where work is near a transmission pipeline

High-Risk Construction Work triggered

s291(g)
Is carried out in or near a shaft or trench deeper than 1.5 metres, or a tunnel

Service trenches routinely exceed 1.5 m in depth.

s291(i)
Is carried out on or near pressurised gas distribution mains or piping

Excavation is carried out on or near pressurised gas mains.

s291(j)
Is carried out on or near chemical, fuel or refrigerant lines

Work is on or near fuel, chemical or refrigerant lines.

s291(k)
Is carried out on or near energised electrical installations or services

Excavation is on or near energised underground electrical cables.

s291(o)
Is carried out in an area at a workplace in which there is any movement of powered mobile plant

Excavators and powered mobile plant move within the work area.

Legal consequence

Who this is for

  • Civil construction contractors operating in urban areas
  • Utility connection contractors (gas, electrical, water)
  • Telecommunications and fibre installation contractors
  • Excavator operators and dogmen working near services
  • Pipeline contractors operating near transmission assets

What you receive

  • Editable DOCX template — Microsoft Word compatible
  • State-specific WHS legislation schedule (NSW/VIC/QLD/SA/WA/TAS/NT/ACT)
  • Hazard register with risk ratings + hierarchy-of-control mapping
  • Worker sign-on register, pre-start checklist, and incident escalation flow

Worked example

At 7:00 am a civil crew from Gridline Civil is set to dig a service trench across a footpath beside a busy road. Before the excavator starts, the supervisor reviews the dial-before-you-dig plans and a ground-penetrating survey, then the crew potholes by vacuum excavation to physically expose a gas main and an electrical cable shown crossing the trench line. Both are marked, and a proximity zone is set within which only hand and vacuum digging is allowed — the machine stays out. The trench is battered as it passes 1.5 m, and a spotter keeps the excavator clear of workers and the exposed assets. When the bucket nears the marked gas main, work switches to hand digging until the pipe is fully exposed and protected. A barrier and traffic plan keep the public and passing vehicles clear of the open trench. The atmosphere is tested before anyone enters to lay the new service, and the trench is reinstated rather than left open at the end of the shift.

Related legislation

  • WHS Act 2011 (model)
  • WHS Regulation 2025
  • Excavation Work Code of Practice
  • AS 5488 Classification of subsurface utility information

Frequently asked questions

Is detailed excavation near live services high risk construction work?

Yes, and it usually satisfies five separate paragraphs of WHS Regulation s291 at once. Service trenches routinely exceed 1.5 metres, which is s291(g). Digging on or near pressurised gas distribution mains is s291(i), near fuel, chemical or refrigerant lines is s291(j), and near energised underground electrical services is s291(k). Excavators and trucks working around the trench add s291(o) for movement of powered mobile plant. Section 299 makes the SWMS mandatory before work starts and requires the work to be carried out the way the SWMS describes, with work stopped and the document reviewed if it is not.

How close can the machine dig before we have to switch to hand or vacuum excavation?

The template sets a services proximity zone around every located asset, and inside that zone only hand digging and non-destructive vacuum excavation are permitted — the machine stays out. Crucially, the zone is set before digging, not judged on the fly: positive services location using dial-before-you-dig plans, a ground-penetrating survey and potholing, with each asset physically exposed and marked. The actual clearance distance is set by the asset owner and the applicable state legislation and differs between gas, electrical and water networks, so the document has you record the distance the network operator imposes rather than assuming a single number.

Does this cover the trench collapse risk as well as the service strike risk?

Both, because they compound. Collapse once depth exceeds 1.5 metres is listed as the central hazard, and the controls require battered or shored faces designed for the actual soil class, not a default profile. Undermining an exposed service is what turns a wall failure into a second incident during rescue. The document also covers atmospheric testing before anyone enters the trench where contamination or gas ingress is credible, with ventilation as required, plus public exclusion, barriers and reinstatement so an open excavation beside a footpath or road is never left unprotected at the end of a shift.

Does it apply near a transmission pipeline, or only local reticulation?

The scope is reticulation and service connections, and it points to AS 2885 where the work is near a gas or liquid petroleum transmission pipeline. Transmission assets carry their own operator permit regime and third-party works approval process that sits above this document. AS 5488 is referenced for classifying the quality of subsurface utility information, which matters because a plan-only alignment and a potholed, physically exposed asset are not the same level of confidence. Service asset duties themselves are left to the applicable state legislation and the relevant network operators, so obtain their requirements before you rely on this SWMS alone.

Which jurisdiction edition should I buy and what arrives?

It comes in eight editions covering NSW, VIC, QLD, SA, WA, TAS, NT and ACT, each citing its own Act, Regulation and regulator. Choose the state where the excavation physically happens. What arrives is a single editable Word document, bought once: the hazard register with risk ratings, hierarchy-of-control mapping, the state legislation schedule, a worker sign-on register, a pre-start checklist and an incident escalation flow. Before the crew signs on, add your trench alignment and depth, the located assets and their proximity zones, the network operator emergency contacts, your shoring or battering design and the traffic and public exclusion arrangements.

What's in this SWMS

Document details

Regulation
Work Health and Safety Regulation 2025 (NSW), Section 291 — High Risk Construction Work
HRCW Category
s. 291(g) — Work in or near a shaft or trench >1.5 m or a tunnel; s. 291(i) — Work on or near pressurised gas distribution mains or piping; s. 291(j) — Work on or near chemical, fuel or refrigerant lines; s. 291(k) — Work on or near energised electrical installations or services; s. 291(o) — Work where there is movement of powered mobile plant
Hazards Identified
8 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment
CIH-reviewed SWMS · from $99 · instant download

Related SWMS templates

⛏️Bored Pier & Caisson Construction SWMS

NSW — Bored Pier & Caisson Construction. Full task scope, hazards and controls to be authored to Phase 1 stand…

$199 AUDBuy →

⛏️Bulk Earthworks SWMS

NSW — Bulk Earthworks. Full task scope, hazards and controls to be authored to Phase 1 standard.

$199 AUDBuy →

⛏️Land Clearing & Grubbing SWMS

NSW — Land Clearing & Grubbing. Full task scope, hazards and controls to be authored to Phase 1 standard.

$149 AUDBuy →

⛏️Rock Breaking & Ripping SWMS

NSW — Rock Breaking & Ripping. Full task scope, hazards and controls to be authored to Phase 1 standard.

$199 AUDBuy →

⛏️Soil Compaction & Grading SWMS

NSW — Soil Compaction & Grading. Full task scope, hazards and controls to be authored to Phase 1 standard.

$149 AUDBuy →

⛏️Underground Tank Removal SWMS

NSW — Underground Tank Removal. Full task scope, hazards and controls to be authored to Phase 1 standard.

$249 AUDBuy →