Soil Compaction & Grading SWMS
NSW — Soil Compaction & Grading. Full task scope, hazards and controls to be authored to Phase 1 standard.
SWMS variants reference your state’s WHS legislation. Instant download after payment.
Soil compaction and grading involves the use of powered mobile plant — vibratory rollers, plate compactors, graders, dozers and loaders — to level, shape and densify soil to specified engineering tolerances on civil, subdivision and building sites. The work exposes operators and ground workers to crushing and run-over risk from plant, hand-arm and whole-body vibration, respirable crystalline silica in dry soil dust, noise above 85 dB(A), unstable ground and edge collapse near excavations, and struck-by hazards from articulated machinery operating in shared zones.
Under section 291 of the Work Health and Safety Regulation 2025 (NSW), work involving the movement of powered mobile plant is high risk construction work, and section 299 requires a Safe Work Method Statement to be prepared before the work commences. Controls must follow the hierarchy in section 36 — eliminating pedestrian exposure through exclusion zones and separation, engineering ROPS/FOPS and proximity detection, then administrative traffic management and PPE — and the SWMS must be reviewed under section 302 if controls fail or the work changes.
Hazards identified
12 hazards covered, sorted by priority.
Fatal crush injury or multiple trauma
Operator fatality or serious crush injury
Plant and operator fall into excavation; entrapment
Electrocution, explosion, arc flash or utility strike
Silicosis, lung cancer — WES 0.05 mg/m³ 8-hour TWA
Asbestos exposure; mesothelioma; notifiable incident
Lumbar spine injury; exceedance of ISO 2631-1 exposure action values
Noise-induced hearing loss above 85 dB(A) LAeq,8h
Hand-arm vibration syndrome; vascular and neurological damage
Musculoskeletal strain and back injury
Heat exhaustion or heat stroke; dehydration
Sprains, fractures, twisted ankles
Control measures
Hierarchy-of-controls order: elimination → substitution → isolation → engineering → administrative → PPE.
- 1Eliminate pedestrian/plant interaction by sequencing works so compaction and grading occur in exclusion zones with no ground workers present; use physical barriers and signage to define the zone.
- 2Substitute walk-behind plate compactors with ride-on trench rollers or remote-controlled compactors in confined trenches to remove operator proximity to the vibrating drum.
- 3Verify all mobile plant has current ROPS/FOPS certification to AS 2294 and reversing alarms/cameras compliant with AS 1742.3; isolate and tag out plant that fails pre-start inspection.
- 4Use Dial Before You Dig, on-site service locator (AS 5488.1 quality level A/B) and hand-expose services before ripping or deep grading; maintain no-go offsets around live utilities.
- 5Suppress silica dust with water carts, misting or damp-down of fill material to keep RCS below the 0.05 mg/m³ WES; conduct atmospheric monitoring under AS 2985 where dry-condition work is unavoidable.
- 6Where site history indicates fill or demolition material, obtain a hazardous materials survey and manage suspected ACM in accordance with the SafeWork NSW Code of Practice — How to Manage and Control Asbestos in the Workplace.
- 7Implement a documented Traffic Management Plan with dedicated haul routes, spotters for reversing plant, and radio communication between operators and ground crew.
- 8Rotate operators to limit whole-body vibration exposure with reference to ISO 2631-1 action values; ensure suspension seats are maintained and adjusted to operator weight.
- 9Provide hearing protection to AS/NZS 1270 (Class 5 near compactors), P2 respirators to AS/NZS 1716, safety eyewear to AS/NZS 1337.1, high-visibility clothing to AS/NZS 4602.1, and safety footwear to AS/NZS 2210.3.
- 10Conduct daily pre-start inspections, toolbox talks and verify operator High Risk Work Licences (LR/LB) and VOC records for the specific plant class before work commences.
- 11Establish emergency response for entrapment, utility strike and heat illness; ensure a trained first aider and communications are available on site at all times.
- 12All workers must hold CPCCWHS1001 (White Card); consult the workforce on the SWMS content under section 47 of the WHS Act, and review controls under section 302 of the WHS Regulation 2025 if an incident, near-miss or scope change occurs.
Applicable Codes of Practice
Primary code for selection, maintenance, guarding and safe operation of powered mobile plant used in compaction and grading.
Applies where compaction occurs adjacent to or within excavations, batters and trenches; addresses ground stability and plant proximity.
Specifies rollover and falling-object protective structure requirements for rollers, graders, dozers and loaders.
Governs traffic management, signage and worker protection where grading interacts with public roads or shared traffic zones.
High-Risk Construction Work triggered
Soil compaction and grading is performed exclusively with powered mobile plant — vibratory rollers, graders, dozers, loaders and walk-behind compactors — moving across active work areas, satisfying section 291(o) of the WHS Regulation 2025 (NSW).
Section 299 requires the SWMS to be prepared before the high risk construction work commences and section 302 requires review if controls are revised or an incident occurs. Failure to comply, or reckless conduct exposing a worker to serious injury, may constitute a Category 1 or Category 2 offence under sections 31 and 32 of the Work Health and Safety Act 2011 (NSW). Refer to the current SafeWork NSW penalty schedule for applicable monetary penalties.
Who this is for
- →Civil contractors undertaking subdivision pad, road and bulk earthworks
- →Plant operators for rollers, graders, dozers and loaders
- →Site supervisors and civil foremen coordinating earthworks sequencing
- →Principal contractors on residential and commercial construction sites
- →Local government and RMS/Transport for NSW civil works crews
What you receive
- ✓Fully editable Microsoft Word SWMS aligned to the WHS Regulation 2025 (NSW)
- ✓Pre-populated hazards, risk ratings and hierarchy-of-control measures for compaction and grading
- ✓a high risk construction work category(o) declaration and worker sign-on register
- ✓Plant pre-start inspection checklist for rollers, graders and compactors
- ✓Traffic Management Plan template with exclusion zone diagrams
- ✓Silica dust control and monitoring reference aligned to AS 2985
- ✓Emergency response procedures for entrapment, utility strike and rollover
- ✓SWMS review log referencing section 302 triggers
- ✓Company, project and ABN fields ready for immediate site issue
Worked example
A civil contractor is compacting a Class 2 subgrade for a new residential subdivision at Marsden Park in Sydney's north-west. A 12-tonne smooth-drum vibratory roller and a walk-behind plate compactor are operating in adjacent lots while surveyors set out kerb lines. Prior to mobilisation, the site supervisor issued the Soil Compaction & Grading SWMS, confirmed the roller operator's LR licence and VOC, and verified ROPS certification to AS 2294. A 5-metre exclusion zone was demarcated around the roller with witches' hats and a spotter was assigned. Dial Before You Dig plans identified a 400 mm potable water main under the pad — hand-exposed and marked before ripping. Water carts damped the surface every 30 minutes to suppress silica dust. Mid-shift, the surveyor attempted to enter the roller's zone; the spotter halted the plant, the supervisor consulted the crew under section 47 of the WHS Act, and the SWMS was reviewed under section 302 to strengthen radio-check protocols before work resumed.
Related legislation
- Work Health and Safety Act 2011 (NSW)
- Work Health and Safety Regulation 2025 (NSW)
- Protection of the Environment Operations Act 1997 (NSW)
- Roads Act 1993 (NSW) — where works interface with public roads
- Environmental Planning and Assessment Act 1979 (NSW)
- Contaminated Land Management Act 1997 (NSW) — where fill or ACM is suspected
Frequently asked questions
Is soil compaction always classified as High Risk Construction Work?
Yes, when performed with powered mobile plant such as rollers, graders or ride-on compactors it falls under section 291(o) of the WHS Regulation 2025 (NSW), which triggers the SWMS requirement under section 299. Even hand-operated plate compactors on construction sites should be documented in a SWMS given the vibration, noise and silica exposures involved.
Do we need a separate SWMS if we're working near an open excavation?
If the compaction work occurs within or adjacent to a trench deeper than 1.5 metres, section 291(b) is also triggered and the SWMS must address excavation-specific hazards including ground stability, batter angles and plant loading on edges. Many contractors combine both scopes into a single integrated document; ensure both HRCW categories are declared.
How do we manage silica dust during dry-weather compaction?
Dry soil with a silica content above 1% produces respirable crystalline silica when disturbed. Primary control is water suppression via water carts or misting to keep dust below the WES of 0.05 mg/m³ (8-hour TWA). Where wet suppression is impractical, conduct atmospheric monitoring under AS 2985 and provide P2 respirators to AS/NZS 1716 as a supplementary control.
What licences do operators require?
Ride-on rollers over 5 tonnes require a Class LR High Risk Work Licence under Schedule 3 of the WHS Regulation. Front-end loaders and dozers require verified operator competency (VOC) rather than a HRWL. All workers on the construction site must hold a CPCCWHS1001 (White Card), and evidence should be sighted and recorded before mobilisation.
Document details
Related SWMS templates
☣️Asbestos Soil Remediation SWMS
NSW — Asbestos Soil Remediation. Full task scope, hazards and controls to be authored to Phase 1 standard.
🧱Acoustic Ceiling Tile Installation SWMS
NSW — Acoustic Ceiling Tile Installation. Full task scope, hazards and controls to be authored to Phase 1 stan…
🏢Aluminium Composite Panel Installation SWMS
NSW — Aluminium Composite Panel Installation. Full task scope, hazards and controls to be authored to Phase 1 …
🚧Artificial Turf Installation SWMS
NSW — Artificial Turf Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.
🔨Asbestos-Containing Material Demolition SWMS
NSW — Asbestos-Containing Material Demolition. Full task scope, hazards and controls to be authored to Phase 1…
🏠Asphalt Shingle Roofing SWMS
NSW — Asphalt Shingle Roofing. Full task scope, hazards and controls to be authored to Phase 1 standard.