OH Consultant
← All SWMS Documents
πŸͺ

Rigging Operations SWMS

Rigging operations SWMS for NSW. Dropped loads, crane stability, overhead power lines, lifting gear WLL, dogging and rigging licences, exclusion zones and suspended loads. Editable DOCX, instant download.

βš–οΈWHS Regulation 2025 & Codes of Practice β€” legally binding from 1 July 2026 (s26A)
πŸ‘·Reviewed by certified occupational health and safety professionals
πŸ—ΊοΈState-specific variants for all 8 Australian jurisdictions
$149 AUDβœ“ Instant Download Available

SWMS variants reference your state’s WHS legislation. Instant download after payment.

Rigging operations cover the slinging, lifting, guiding and landing of loads with cranes and lifting gear across construction and industrial work β€” structural steel erection, precast placement, plant installation and general lifting. It is high risk construction work under the NSW WHS Regulation 2025 because rigging routinely involves a risk of a person falling more than 2 m, the movement of powered mobile plant (cranes), work on or near energised electrical services, structural steel erection and the placement of precast or tilt-up concrete (s291), so a SWMS is mandatory under s299. Dogging (DG) and rigging (RB/RI/RA) high risk work licences, and the relevant crane high risk work licence, are required. The defining hazard is the dropped or swinging load: a sling rigged to the wrong configuration, a load with a mis-judged centre of gravity, an exceeded working load limit, or a snag can drop tonnes onto the crew below or swing into people and structures. Crane stability and ground conditions, contact with overhead powerlines, and falls during access to landing points complete the high-consequence picture. The SWMS controls the rigging configuration and lifting gear, the exclusion zone beneath suspended loads, crane set-up and powerline clearance, and the licensing and communication that keep the dogger, rigger and crane operator working as one. Plant duties are under Part 3.5 and SafeWork NSW is the regulator.

Hazards identified

7 hazards covered, sorted by priority.

Dropped load from rigging failure, snag or a load rigged beyond its working load limitHIGH

Fatal crush injury to crew beneath the load

Loss of crane stability from poor ground bearing or exceeding the chartHIGH

Crane overturn and catastrophic injury

Contact with overhead powerlines by the crane, load or riggingHIGH

Electrocution of the crew (WHS Reg Part 4.7)

Swinging or uncontrolled load striking workers or structuresHIGH

Struck-by fatality and structural damage

Personnel inside the exclusion zone beneath a suspended loadHIGH

Crush or struck-by injury

Falls during access to slinging and landing points above 2 mHIGH

Fall injury or fatality (WHS Reg Part 4.4)

Use of unlicensed dogging, rigging or crane operatorsHIGH

Unauthorised high risk work and loss of competent control

Control measures

Hierarchy-of-controls order: elimination β†’ substitution β†’ isolation β†’ engineering β†’ administrative β†’ PPE.

  1. 1Elimination β€” Prefabricate and assemble at ground level and lift completed modules so the number and complexity of lifts is reduced
  2. 2Substitution β€” Substitute mechanical lifting points and engineered lifting frames for improvised slinging arrangements
  3. 3Engineering β€” Rated lifting gear matched to the load and configuration, inspected and tagged, with crane set-up to the load chart and ground-bearing assessment
  4. 4Engineering β€” Tag lines to control load orientation and prevent uncontrolled swing
  5. 5Engineering β€” Powerline clearance β€” de-energise, insulate or maintain the regulated approach distance with an observer
  6. 6Administrative β€” Lift plan, exclusion zone hard-barricaded beneath the load, and a dedicated communication channel between dogger, rigger and crane operator
  7. 7Administrative β€” Licensed dogger (DG), rigger (RB/RI/RA) and crane operator for every role, competencies verified
  8. 8Administrative β€” Pre-lift inspection of gear and a documented sequence, with stop authority for any crew member
  9. 9PPE β€” Hard hat, high-visibility clothing, gloves and safety footwear, with fall protection for work at height during rigging
  10. 10PPE β€” Two-way radios for dogger, rigger and crane operator on a dedicated channel

Applicable Codes of Practice

AS 2550.1 Cranes, hoists and winches β€” safe useβš– Legally binding Β· 1 Jul 2026

Primary standard for safe crane use during rigging

Managing the Risks of Plant in the Workplace Code of Practiceβš– Legally binding Β· 1 Jul 2026

WHS duties for powered mobile plant and cranes

AS 4991 Lifting devices

Specification of slings, shackles and below-the-hook lifting devices

AS 3850 Prefabricated concrete elements

Lifting and placement of precast and tilt-up elements

Construction Work Code of Practice

General construction duties and SWMS requirements

High-Risk Construction Work triggered

1
Work involving a risk of a person falling more than 2 m

Riggers access slinging and landing points above 2 m.

16
Work carried out in an area at a workplace in which there is any movement of powered mobile plant

Lifting is carried out with cranes β€” powered mobile plant moving in the area.

12
Work carried out on or near energised electrical installations or services

Lifts are routinely carried out near energised overhead powerlines.

14
Work involving tilt-up or precast concrete

Rigging places precast and tilt-up concrete and structural steel.

Legal consequence

Who this is for

  • β†’Licensed riggers (RB/RI/RA) and doggers (DG)
  • β†’Crane operators working with rigging crews
  • β†’Steel erectors and precast installers
  • β†’Lifting supervisors and crane crew leaders
  • β†’Principal contractor HSE managers overseeing lifting operations

What you receive

  • βœ“Editable DOCX template β€” Microsoft Word compatible
  • βœ“State-specific WHS legislation schedule (NSW/VIC/QLD/SA/WA/TAS/NT/ACT)
  • βœ“Hazard register with risk ratings + hierarchy-of-control mapping
  • βœ“Worker sign-on register, pre-start checklist, and incident escalation flow

Worked example

At 6:30 am a rigging crew from Keystone Rigging is set to place precast wall panels with a mobile crane. The licensed rigger checks each panel's lifting inserts and the rated chains against the panel mass, and the crane operator confirms the set-up is level on packed mats and within the chart at the planned radius. A powerline survey flags an energised feeder near the slew arc, so a tiger-tail and a spotter are set and the approach distance marked. The dogger directs the lift on a dedicated radio channel, tag lines are clipped to control the panel's swing, and the landing crew stand clear of the exclusion zone until the panel is braced. As the first panel lifts, a gust starts it rotating; the dogger calls the stop, lets it settle on the tag lines, then continues. Riggers guiding the panel at the brace points are clipped to fall-arrest. The panel is landed onto its braces, the props secured before the chains come off, and only then does the crew approach. The sequence repeats, with the exclusion zone re-established for every lift.

Related legislation

  • WHS Act 2011 (model)
  • WHS Regulation 2025
  • AS 2550.1 Cranes, hoists and winches β€” safe use
  • Managing the Risks of Plant in the Workplace Code of Practice
What's in this SWMS

Document details

Regulation
Work Health and Safety Regulation 2025 (NSW) β€” High Risk Construction Work (s291; SWMS s299), high risk work licensing (dogging DG and rigging RB/RI/RA, and crane classes), and Plant (Part 3.5)
HRCW Category
High risk construction work β€” rigging routinely involves a risk of a person falling more than 2 m, the movement of powered mobile plant (cranes), work on or near energised electrical services, structural steel erection and the placement of precast or tilt-up concrete (s291); a SWMS is required (s299). Dogging (DG) and rigging (RB/RI/RA) high risk work licences, and the relevant crane high risk work licence, are required for the work.
Hazards Identified
7 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment