Tiled Roof Installation SWMS
NSW β Tiled Roof Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.
SWMS variants reference your stateβs WHS legislation. Instant download after payment.
Tiled roof installation involves the loading, distribution and fixing of concrete or terracotta tiles to timber or steel battens on pitched roof structures, typically at heights well above two metres. The work combines sustained exposure to fall hazards at pitched edges and openings with significant manual handling loads (concrete tiles average 4.5-5.5 kg each, loaded in stacks of 6-8 to the batten), sharp cutting operations, and exposure to respirable crystalline silica when tiles are cut, drilled or ground on-site. Roof surfaces are unstable underfoot, especially before tiles are bedded, and battens themselves are not a rated working surface.
Under the Work Health and Safety Regulation 2025 (NSW), section 291 defines tiled roof installation as high risk construction work because it involves a risk of a person falling more than 2 metres. Section 299 therefore requires a Safe Work Method Statement to be prepared before work commences, kept available for inspection, and complied with on site. Controls must follow the hierarchy in section 36 β eliminate the fall risk where reasonably practicable, then apply engineering controls such as edge protection and fall-arrest systems before relying on administrative measures and PPE.
Hazards identified
12 hazards covered, sorted by priority.
Fatal or catastrophic injury β spinal, head and multi-trauma
Fatal fall into building interior
Serious fracture, head injury
Fall from height with fatal potential
Silicosis, lung cancer, chronic respiratory disease
Head injury, fatality to workers or public
Chronic back, shoulder and knee musculoskeletal injury
Electrocution, arc flash burns, fatality
Deep lacerations, tendon damage, amputation
Heat stroke, dehydration, long-term skin cancer risk
Fall through roof, crush injury
Permanent noise-induced hearing loss
Control measures
Hierarchy-of-controls order: elimination β substitution β isolation β engineering β administrative β PPE.
- 1Eliminate work at height where feasible by pre-cutting and pre-assembling components at ground level and using ground-based tile-loading elevators rather than manual carry-up.
- 2Substitute dry cutting with wet-cut tile saws or tools fitted with on-tool H-class dust extraction to control respirable crystalline silica in accordance with the Working with silica and silica containing products Code of Practice (SafeWork NSW).
- 3Install perimeter guardrail edge protection (top rail, mid rail, toeboard) to all roof edges before tile loading commences, compliant with AS/NZS 4994.1 for temporary edge protection.
- 4Cover, guard or barricade all roof penetrations and skylights with load-rated mesh or fixed covers labelled 'Do Not Remove' before work over or near them.
- 5Where edge protection is not reasonably practicable, use a fall-arrest system with roof-anchor points, full body harness and shock-absorbing lanyard compliant with AS/NZS 1891.1 and AS/NZS 1891.4, with anchor points certified to 15 kN.
- 6Use industrial ladders compliant with AS/NZS 1892.1 rated 120 kg minimum, secured top and bottom, extending 1 m above landing; ladders used only for access, not as a work platform.
- 7Maintain minimum 4 m (up to 132 kV) exclusion zones from overhead powerlines per SafeWork NSW guidance; arrange isolation or tiger tails through the network operator where clearance cannot be maintained.
- 8Establish exclusion zones below roof work with hard barricades, spotters and signage; never store loose tiles within 2 m of the roof edge and use tile-loading platforms rated for the imposed load.
- 9Break tile-loading tasks into two-person lifts, rotate crews, and use mechanical hoists or conveyors for delivery to the roof to reduce manual handling load per the Hazardous manual tasks Code of Practice.
- 10Implement a heat stress management plan with scheduled rest, shaded areas, drinking water, and reschedule work on days forecast >35 Β°C; provide PPE compliant with AS/NZS 1337.1 (eye), AS/NZS 1270 (hearing), AS/NZS 1716 P2 (respiratory) and AS/NZS 2210.3 (safety footwear).
- 11Prohibit access onto batten-only surfaces; require crawl boards or roof platforms until sarking and tiles are bedded and structurally continuous.
- 12All workers to hold CPCCWHS1001 (White Card) plus verified competency in working at heights and fall-arrest use; consult workers on the SWMS under section 47 of the WHS Act and review the SWMS under section 302 of the WHS Regulation 2025 whenever the control measures, work method or site conditions change.
Applicable Codes of Practice
Primary approved Code for controlling falls >2 m during tiled roof installation, including edge protection, fall-arrest and safe roof access.
Sets the framework for high risk construction work, SWMS content, principal contractor duties and site consultation obligations.
Applies to on-site cutting, drilling or grinding of concrete and terracotta roof tiles which generate respirable crystalline silica.
Technical standard governing anchor selection, harness inspection, lanyard configuration and rescue planning for roof fall-arrest systems.
High-Risk Construction Work triggered
Tiled roof installation is performed on pitched roof surfaces at eaves, ridges and gables typically 3-8 m above ground or an internal floor level. Workers are exposed to unprotected edges, roof penetrations and skylights during loading, cutting and fixing. The fall distance exceeds 2 m throughout the entire work sequence, directly engaging section 291(a) of the WHS Regulation 2025 (NSW).
Because the work is high risk construction work under section 291, section 299 of the WHS Regulation 2025 (NSW) requires a compliant SWMS to be prepared before work starts, complied with during the work, and reviewed under section 302 when controls change or an incident occurs. Failure to prepare, comply with or produce a SWMS is a regulatory offence. Where a breach exposes a worker to a risk of death or serious injury, prosecution may proceed as a Category 2 offence under section 32 of the WH&S Act 2011 (NSW), or a Category 1 offence under section 31 where the conduct is reckless. Penalties applied by SafeWork NSW follow the current statutory penalty schedule published by SafeWork NSW and indexed under the Act.
Who this is for
- βLicensed roof tilers and roofing subcontractors installing concrete or terracotta tiles on residential and light-commercial roofs
- βPrincipal contractors and residential builders coordinating tiled roofing packages on new dwellings and re-roof projects
- βRoofing labour-hire crews and apprentices working under a supervising roof tiler
- βOwner-builders engaging tilers on Home Building Act projects who must verify SWMS documentation
- βWHS advisors and site supervisors auditing high risk construction work compliance on residential sites
What you receive
- βEditable Microsoft Word SWMS aligned to section 299 of the WHS Regulation 2025 (NSW), ready to site-brand
- βPre-populated high risk construction work declaration citing section 291(a) β fall >2 m
- βFull hazard register with risk-rated consequences for tiled roofing operations
- βHierarchy-of-control measures referencing AS/NZS 1891, AS/NZS 4994, AS/NZS 1892 and AS/NZS 1716
- βSilica dust control procedures for on-site tile cutting including wet-cut and on-tool extraction
- βWorker consultation and sign-on register meeting section 47 of the WH&S Act
- βSection 302 SWMS review trigger log for changes in method, personnel or conditions
- βEmergency response and rescue plan template for fall-arrest activation on a pitched roof
- βFree updates for 12 months as SafeWork NSW Codes and referenced AS/NZS standards are revised
Worked example
A roofing subcontractor is engaged by a residential builder to install a concrete tiled roof on a two-storey dwelling in Kellyville in Sydney's Hills District. The ridge height is 7.2 m and the eaves sit 5.8 m above the finished ground level, so the work is high risk construction work under section 291(a). Before tile delivery, the subcontractor installs perimeter guardrail edge protection to AS/NZS 4994.1 around the full roof perimeter and covers the two proposed skylight openings with load-rated ply covers screwed to the trusses. A tile-loading elevator delivers tiles directly to a loading platform, avoiding manual carry-up. On-site tile cuts at the hips and valleys are performed with a wet-cut tile saw positioned at ground level. The SWMS is signed by all four tilers, the site supervisor and reviewed with the principal contractor. When wet weather later requires the crew to switch to fall-arrest anchors during a gutter detail, the SWMS is formally reviewed under section 302 and re-signed before that work proceeds.
Related legislation
- Work Health and Safety Act 2011 (NSW)
- Work Health and Safety Regulation 2025 (NSW) β sections 36, 47, 78, 291, 299, 302
- Managing the risk of falls at workplaces Code of Practice (SafeWork NSW)
- Construction Work Code of Practice (SafeWork NSW)
- Working with silica and silica containing products Code of Practice (SafeWork NSW)
- Home Building Act 1989 (NSW) β licensing of roofing work
Frequently asked questions
Is a SWMS legally required for every tiled roof installation in NSW?
Yes. Any tiled roof installation involving a risk of a fall greater than 2 metres is high risk construction work under section 291(a) of the WHS Regulation 2025 (NSW). Section 299 requires a SWMS to be prepared before the work starts, complied with during the work, and made available for inspection. The threshold is the risk of the fall, not whether one occurs.
Do we still need edge protection if workers are wearing harnesses?
Edge protection is a higher-order control under the hierarchy in section 36 of the WHS Regulation 2025 (NSW). Passive fall prevention (guardrails, scaffolds) must be used where reasonably practicable before relying on fall-arrest harnesses. Harnesses are appropriate where edge protection is genuinely not reasonably practicable, and require certified anchors, trained users and a documented rescue plan under AS/NZS 1891.4.
Does cutting concrete roof tiles trigger silica obligations?
Yes. Concrete and terracotta tiles contain crystalline silica, and dry cutting generates respirable crystalline silica. Work must control exposure below the workplace exposure standard of 0.05 mg/mΒ³ (8-hour TWA) using wet cutting or on-tool extraction, consistent with the Working with silica and silica containing products Code of Practice. Health monitoring obligations under Part 7.1 of the WHS Regulation 2025 may also apply depending on exposure.
When does the SWMS need to be reviewed?
Under section 302 of the WHS Regulation 2025 (NSW), the SWMS must be reviewed β and if necessary revised β whenever the control measures are inadequate, the work method changes, a new hazard is identified, a notifiable incident occurs, or a health and safety representative reasonably requests it. On tiled roofs, common triggers include weather-driven changes to access, replacement crew members, or a change from edge protection to fall-arrest for detail work.
Document details
Related SWMS templates
π§±Acoustic Ceiling Tile Installation SWMS
NSW β Acoustic Ceiling Tile Installation. Full task scope, hazards and controls to be authored to Phase 1 stanβ¦
π’Aluminium Composite Panel Installation SWMS
NSW β Aluminium Composite Panel Installation. Full task scope, hazards and controls to be authored to Phase 1 β¦
π§Artificial Turf Installation SWMS
NSW β Artificial Turf Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.
πBoiler & Pressure Vessel Installation SWMS
NSW β Boiler & Pressure Vessel Installation. Full task scope, hazards and controls to be authored to Phase 1 sβ¦
π‘οΈBoiler Installation & Commissioning SWMS
NSW β Boiler Installation & Commissioning. Full task scope, hazards and controls to be authored to Phase 1 staβ¦
π§Box Culvert Installation SWMS
NSW β Box Culvert Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.