Pool Plumbing & Filtration Install SWMS

Install of pool plumbing β€” skimmer box, suction lines, return lines, main drain, balance tank plumbing. Includes pipe install through pool wall penetrations, pressure test, plant-room piping to pump and filter, valve install.

βš–οΈWHS Regulation 2025 & Codes of Practice β€” legally binding from 1 July 2026 (s26A)
πŸ‘·Reviewed by certified occupational health and safety professionals
πŸ—ΊοΈState-specific variants for all 8 Australian jurisdictions
$149 AUDβœ“ Instant Download Available

SWMS variants reference your state’s WHS legislation. Instant download after payment.

Installation of pool plumbing systems including skimmer boxes, suction and return lines, main drains, and balance tank piping through pool wall penetrations, with plant-room connections to pumps, filters and valves. Work triggers WHS Regulation 2025 HRCW provisions requiring a SWMS before work commences.

Hazards identified

3 hazards covered, sorted by priority.

Trench/excavation collapse during pipe installHIGH

Crush injury, asphyxiation, fatality

Pressurised pipe failure during hydrostatic testHIGH

Projectile impact, eye injury, fluid injection

Manual handling of pipes, valves and fittingsMEDIUM

Musculoskeletal injury, sprains, strains

Control measures

Hierarchy-of-controls order: elimination β†’ substitution β†’ isolation β†’ engineering β†’ administrative β†’ PPE.

  1. 1Batter, bench or shore excavations >1.5m per AS 5100; daily inspection by competent person.
  2. 2Cap and restrain pipe ends; pressure test in stages; exclusion zone during test.
  3. 3Two-person lift for pipes >20kg; use mechanical aids for plant-room equipment placement.

Applicable Codes of Practice

WHS Regulation 2025 Part 6.3 β€” Excavation workβš– Legally binding Β· 1 Jul 2026

Mandates controls for trenching during pipe runs

AS/NZS 2032 Installation of PVC pipe systems

Pressure pipe install and testing standard

High-Risk Construction Work triggered

21
Work in or near a trench/shaft deeper than 1.5m

Suction and return line trenches typically exceed 1.5m depth to pool shell.

23
Work on or near pressurised gas/liquid systems

Hydrostatic pressure testing of suction, return and main drain lines before commissioning.

Legal consequence

SWMS mandatory before HRCW starts under WHS Reg s299; PCBU penalties apply.

What you receive

  • βœ“Editable DOCX SWMS ready for project customisation
  • βœ“State-specific WHS legislation schedule (all 8 jurisdictions)
  • βœ“Project hazard register aligned to controls
  • βœ“Worker sign-on and consultation register

Related legislation

  • WHS Act 2011 s19 β€” Primary duty of care
  • WHS Regulation 2025 Schedule 1 β€” High Risk Construction Work
  • WHS Regulation 2025 Part 6.3 β€” Excavation work
What's in this SWMS

Document details

Regulation
WHS Regulation 2025, Schedule 1 β€” High Risk Construction Work
HRCW Category
Working in excavation, pressure testing, manual handling
Hazards Identified
9 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment