Industrial Machinery Installation SWMS

NSW β€” Industrial Machinery Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.

βš–οΈWHS Regulation 2025 & Codes of Practice β€” legally binding from 1 July 2026 (s26A)
πŸ‘·Reviewed by certified occupational health and safety professionals
πŸ—ΊοΈState-specific variants for all 8 Australian jurisdictions
$199 AUDβœ“ Instant Download Available

SWMS variants reference your state’s WHS legislation. Instant download after payment.

Industrial machinery installation involves positioning, aligning, anchoring, connecting and commissioning heavy fixed plant β€” press lines, CNC machining centres, conveyors, packaging equipment, mixers, compressors and process skids β€” inside operating or newly constructed facilities. Work typically combines rigging and load shifting with powered mobile plant (forklifts, cranes, elevated work platforms), hot work, energised electrical termination, hydraulic and pneumatic pressurisation, and confined or restricted access. Loads are heavy and unstable during placement, stored energy is progressively introduced during commissioning, and installers frequently work alongside production personnel unfamiliar with construction hazards.

Under the Work Health and Safety Regulation 2025 (NSW), section 291 defines this activity as high risk construction work where it involves work on or near energised electrical installations or services (s291(k)) and work where there is movement of powered mobile plant (s291(o)). Section 299 requires a Safe Work Method Statement to be prepared before work commences, identifying hazards, assessing risks and documenting controls applied in accordance with the hierarchy of control under section 36. This SWMS documents isolation, exclusion zoning, load management and verification controls consistent with AS/NZS standards and SafeWork NSW Codes of Practice.

Hazards identified

12 hazards covered, sorted by priority.

Contact with energised conductors during termination of machine power supplies and control circuitsHIGH

Electrocution, arc flash burns, cardiac arrest

Suspended load failure or shift during crane/forklift placement of machine base or sub-assembliesHIGH

Fatal crush injury, catastrophic damage

Struck by or crushed between powered mobile plant (forklifts, EWPs, cranes) manoeuvring in confined install footprintHIGH

Fatality, multiple fractures, amputation

Uncontrolled release of stored energy during commissioning (hydraulic, pneumatic, spring, gravitational, capacitive)HIGH

High-pressure fluid injection injury, ejection of components, crushing

Machine tip-over or roll during skidding, jacking or final positioning on uneven or under-rated flooringHIGH

Crush fatality, structural damage

Respirable crystalline silica dust from core-drilling or chasing concrete floors for holding-down boltsHIGH

Silicosis, lung cancer

Disturbance of asbestos-containing materials in older industrial floors, wall linings or gaskets on legacy plant being removedHIGH

Mesothelioma, asbestosis, lung cancer

Hot work (welding, grinding, oxy-cutting) igniting oils, hydraulic fluid, cardboard or process combustiblesHIGH

Fire, explosion, burns

Manual handling of heavy sub-assemblies, guards, motors and cable during fit-up in restricted spacesMEDIUM

Musculoskeletal injury, hernia, chronic back injury

Falls from height when accessing elevated machine platforms, gantries or roof-mounted services during installHIGH

Serious injury, fatality

Noise exposure during commissioning runs and adjacent production operationsMEDIUM

Noise-induced hearing loss, tinnitus

Interface with client production staff and other trades unfamiliar with install exclusion zonesMEDIUM

Struck-by injury, unauthorised energisation

Control measures

Hierarchy-of-controls order: elimination β†’ substitution β†’ isolation β†’ engineering β†’ administrative β†’ PPE.

  1. 1Eliminate live work: isolate the supply at the switchboard, apply personal danger tags and padlocks under a documented lock-out/tag-out procedure, and verify dead with a tested voltage indicator before any termination β€” live testing only where unavoidable and only by a licensed electrical worker under AS/NZS 4836.
  2. 2Substitute manual placement with engineered lifting: use rated lifting lugs, spreader beams and certified rigging designed to AS 4991, with load calculations and lift study signed off by a competent rigger before the lift.
  3. 3Engineer exclusion of powered mobile plant from personnel: establish hard-barricaded exclusion zones, use spotters, install physical stops and travel limits, and separate pedestrian routes in accordance with the SafeWork NSW Code of Practice β€” Managing the Risks of Plant in the Workplace.
  4. 4Apply full energy isolation prior to mechanical work: bleed hydraulic accumulators, vent pneumatic receivers, block gravitational loads and discharge capacitors; verify zero-energy state and lock isolators in accordance with AS 4024.1603 (safety of machinery β€” prevention of unexpected start-up).
  5. 5Control silica dust during concrete drilling and chasing: use tools fitted with on-tool water suppression or H-class LEV extraction complying with AS/NZS 60335.2.69, and maintain airborne exposure below the workplace exposure standard of 0.05 mg/mΒ³ 8-hour TWA.
  6. 6Manage asbestos risk on brownfield sites: obtain and review the site asbestos register before penetration or demolition of legacy equipment; where ACM is suspected, cease work and engage a licensed asbestos assessor in accordance with the SafeWork NSW Code of Practice β€” How to Manage and Control Asbestos in the Workplace.
  7. 7Implement a hot work permit system: remove combustibles within a 10 m radius, deploy a trained fire watch with a serviced extinguisher, and maintain the watch for at least 60 minutes post-completion in accordance with AS 1674.1.
  8. 8Provide compliant fall protection when working on elevated machine structures: use EWPs, fixed platforms with edge protection to AS 1657, or a travel-restraint/fall-arrest system to AS/NZS 1891 with a documented rescue plan.
  9. 9Verify structural adequacy of the installation floor and anchor design: obtain engineering certification of point loads, anchor pull-out capacity and floor thickness before setting or torquing holding-down bolts.
  10. 10Control noise through engineering (acoustic enclosures, damping) and administrative measures (rotation, restricted-access signage); provide hearing protection selected to AS/NZS 1270 where exposure exceeds 85 dB(A) LAeq,8h.
  11. 11Select PPE to task: AS/NZS 2210 safety footwear, AS/NZS 1337.1 eye protection, arc-rated clothing to AS/NZS 4836 for electrical work, AS/NZS 1716 P2 respirators for dust, and AS/NZS 1801 hard hats β€” issued, fit-tested where applicable, and inspected before each shift.
  12. 12Confirm all workers hold White Card (CPCCWHS1001) and relevant High Risk Work Licences (rigging, crane, forklift, EWP >11 m); consult the workforce on this SWMS under section 47 of the WHS Act, sign-on prior to work, and review the SWMS under section 302 of the WHS Regulation 2025 when methods, plant or personnel change or following any incident.

Applicable Codes of Practice

SafeWork NSW Code of Practice β€” Managing the Risks of Plant in the Workplaceβš– Legally binding Β· 1 Jul 2026

Primary code for the design, installation, commissioning and safeguarding of industrial plant, including isolation, guarding and interface with mobile plant.

SafeWork NSW Code of Practice β€” Managing Electrical Risks in the Workplaceβš– Legally binding Β· 1 Jul 2026

Applies to isolation, testing and termination of energised electrical installations and services during machine power-up.

AS 4024.1603 β€” Safety of machinery: Prevention of unexpected start-up

Technical basis for lock-out/tag-out and stored-energy dissipation during install and commissioning.

AS 4991 β€” Lifting devices

Governs design, marking and use of lifting lugs, beams and rigging accessories used to place machinery.

High-Risk Construction Work triggered

s291(k)
Is carried out on or near energised electrical installations or services

Machine commissioning requires termination and testing of three-phase supplies, control circuits and interlocks on or adjacent to energised switchboards and distribution boards, bringing workers within the exclusion distances defined for energised installations.

s291(o)
Is carried out in an area at a workplace in which there is any movement of powered mobile plant

Forklifts, cranes, EWPs and skid-steer loaders continuously move loads and personnel across the install footprint, creating struck-by and crush exposures throughout the works.

Legal consequence

Section 299 of the Work Health and Safety Regulation 2025 (NSW) requires a SWMS to be prepared before high risk construction work begins, kept available for inspection, and complied with. Section 302 requires review and, where necessary, revision when controls are inadequate, methods change, or after an incident. Failure to discharge the primary duty of care exposes a PCBU to Category 1 offences under section 31 of the Work Health and Safety Act 2011 (NSW) (reckless conduct causing risk of death or serious injury) or Category 2 offences under section 32. Refer to the current SafeWork NSW penalty schedule for maximum penalties applicable to individuals, officers and body corporates.

Who this is for

  • β†’Plant installation and mechanical contractors commissioning industrial machinery on NSW sites
  • β†’Millwrights, riggers and industrial electricians performing machine set, align and terminate scopes
  • β†’Principal contractors coordinating brownfield fit-outs inside operating manufacturing facilities
  • β†’OEM commissioning engineers and integrators delivering turnkey production lines
  • β†’WHS managers and site supervisors preparing SWMS packs for HRCW notifications and client pre-starts

What you receive

  • βœ“Editable Microsoft Word SWMS aligned to the Work Health and Safety Regulation 2025 (NSW)
  • βœ“Pre-populated hazard register with 10+ industrial installation-specific risks and priority ratings
  • βœ“Hierarchy-of-control response mapped to AS/NZS standards and SafeWork NSW Codes of Practice
  • βœ“HRCW justification statement for sections 291(k) and 291(o) suitable for client submission
  • βœ“Worker sign-on register satisfying section 47 consultation requirements
  • βœ“SWMS review and revision log meeting section 302 requirements
  • βœ“Plant and equipment pre-start inspection checklist for cranes, forklifts, EWPs and rigging gear
  • βœ“Lock-out/tag-out and stored-energy isolation procedure template
  • βœ“Emergency response and rescue plan covering electrical injury, crush injury and falls

Worked example

A mechanical contractor is engaged to install a 12-tonne servo-driven stamping press and infeed conveyor inside an operating automotive components factory at Ingleburn, NSW. Works include core-drilling forty M24 chemical anchors into the existing concrete floor, crane placement of the press bed through a roof opening, alignment and grouting, termination of a 415 V 250 A supply from a new sub-board, hydraulic pack fill and pressure test, and commissioning runs alongside continuing adjacent production. The SWMS identifies s291(k) (energised electrical work at the sub-board) and s291(o) (mobile crane, two forklifts and a scissor lift operating in a shared aisle) as the HRCW triggers. Controls include a signed lift study to AS 4991, hard-barricaded 5 m exclusion zone with dedicated spotter, LOTO on the sub-board isolator verified with a tested voltage indicator, on-tool water suppression during core-drilling with air monitoring against the 0.05 mg/mΒ³ silica WES, and staged commissioning with production halted in the adjacent bay. All workers sign on and hold current White Card plus relevant HRW licences.

Related legislation

  • Work Health and Safety Act 2011 (NSW)
  • Work Health and Safety Regulation 2025 (NSW)
  • Electricity Supply Act 1995 (NSW)
  • Electricity (Consumer Safety) Act 2004 (NSW)
  • Protection of the Environment Operations Act 1997 (NSW)
  • Dangerous Goods (Road and Rail Transport) Act 2008 (NSW)

Frequently asked questions

Does machinery installation always require a SWMS in NSW?

A SWMS is required under section 299 of the Work Health and Safety Regulation 2025 (NSW) whenever the work meets one or more categories of high risk construction work in section 291. Industrial machinery installation almost invariably triggers s291(o) (movement of powered mobile plant) and frequently s291(k) (energised electrical work), so a SWMS is required before work commences.

Who is responsible for preparing the SWMS β€” the installer or the client?

The PCBU carrying out the high risk construction work β€” typically the installation contractor β€” must prepare the SWMS under section 299. The principal contractor must be given a copy before work starts and must ensure the work is carried out in accordance with it. Both parties have consultation obligations under section 46–49 of the WHS Act.

How do we handle live electrical testing during commissioning?

Live work must be eliminated wherever reasonably practicable. Where live testing is genuinely unavoidable for commissioning, it must be performed only by a licensed electrical worker under a documented live work procedure consistent with AS/NZS 4836, with a competent safety observer, tested rescue equipment, and arc-rated PPE. The SWMS must specifically document each live activity, its justification and its controls.

When must this SWMS be reviewed?

Section 302 of the Work Health and Safety Regulation 2025 (NSW) requires the SWMS to be reviewed and, if necessary, revised whenever the control measures are not adequately controlling the risk, the work method or plant changes, new hazards are introduced, or a notifiable incident occurs. Any revision must be consulted on with workers and re-signed before work resumes.

What's in this SWMS

Document details

Regulation
Work Health and Safety Regulation 2025 (NSW), Section 291 β€” High Risk Construction Work
HRCW Category
s. 291(k) β€” Work on or near energised electrical installations or services; s. 291(o) β€” Work where there is movement of powered mobile plant
Hazards Identified
12 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment
CIH-reviewed SWMS Β· from $99 Β· instant download

Related SWMS templates

🧱Acoustic Ceiling Tile Installation SWMS

NSW β€” Acoustic Ceiling Tile Installation. Full task scope, hazards and controls to be authored to Phase 1 stan…

$149 AUDBuy β†’

🏒Aluminium Composite Panel Installation SWMS

NSW β€” Aluminium Composite Panel Installation. Full task scope, hazards and controls to be authored to Phase 1 …

$199 AUDBuy β†’

🚧Artificial Turf Installation SWMS

NSW β€” Artificial Turf Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.

$99 AUDBuy β†’

🏭Boiler & Pressure Vessel Installation SWMS

NSW β€” Boiler & Pressure Vessel Installation. Full task scope, hazards and controls to be authored to Phase 1 s…

$249 AUDBuy β†’

🌑️Boiler Installation & Commissioning SWMS

NSW β€” Boiler Installation & Commissioning. Full task scope, hazards and controls to be authored to Phase 1 sta…

$249 AUDBuy β†’

🚧Box Culvert Installation SWMS

NSW β€” Box Culvert Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.

$199 AUDBuy β†’