Glass Partition Installation SWMS
NSW β Glass Partition Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.
SWMS variants reference your stateβs WHS legislation. Instant download after payment.
Glass partition installation involves the handling, lifting and fixing of large, heavy and inherently fragile glazing panels β typically 10β15 mm toughened or laminated safety glass weighing 30β50 kg per square metre β into aluminium, timber or frameless channel systems within commercial fit-outs. The work combines manual handling of awkward loads, working from stepladders or mobile scaffolds, use of powered tools to fix tracks into concrete slabs or steel, and the risk of catastrophic glass breakage producing sharp shards or full-panel collapse. Historic fixings may also contain asbestos backing materials, and drilling into concrete generates respirable crystalline silica.
Under the Work Health and Safety Regulation 2025 (NSW), glass partition installation frequently constitutes high risk construction work under section 291 where panels are installed at heights exceeding two metres or where the work involves structural alterations. Section 299 requires a Safe Work Method Statement to be prepared before the work commences, kept available for inspection, and complied with on site. Controls follow the hierarchy in section 36, prioritising mechanical lifting aids, engineered edge protection and administrative exclusion zones over PPE alone.
Hazards identified
12 hazards covered, sorted by priority.
Fatal crush injury, amputation, deep lacerations to head, torso or limbs
Fatal or serious fall injuries onto hard finished floors
Explosive shattering, penetrating shard injuries to eyes, face and arteries
Silicosis, lung cancer, chronic obstructive pulmonary disease
Mesothelioma, asbestos-related lung cancer, asbestosis
Acute back, shoulder and knee injuries; chronic disc damage
Deep tendon and nerve lacerations to hands, forearms and thighs
Electrocution, arc flash burns, secondary fall
Foot crush, panel breakage, laceration cascade
Respiratory irritation, dermatitis, sensitisation
Falls onto glass edges, sprains, fractures
Facial lacerations, concussion, panel breakage
Control measures
Hierarchy-of-controls order: elimination β substitution β isolation β engineering β administrative β PPE.
- 1Eliminate manual lifting of panels over 40 kg by specifying panelised sizes at design stage that can be handled within safe lifting limits, or by mandating mechanical lifting.
- 2Substitute toughened glass with heat-soaked toughened or toughened-laminated glass compliant with AS/NZS 2208 to reduce spontaneous fracture risk and retain fragments if breakage occurs.
- 3Use engineered glass-lifting equipment β powered vacuum lifters, glass trolleys and A-frames β rated to the panel weight, with dual-circuit vacuum and audible loss-of-vacuum alarms, inspected before each shift.
- 4Where installation exceeds 2 m, work from a compliant mobile scaffold (AS/NZS 1576) or elevating work platform (AS/NZS 2550.10) with operator holding the relevant HRW licence; stepladders only for incidental work below 2 m.
- 5Control silica dust by using on-tool water suppression or H-class dust extraction (AS/NZS 60335.2.69) when drilling concrete tracks, and comply with the workplace exposure standard for respirable crystalline silica of 0.05 mg/mΒ³.
- 6Before any drilling or fixing in pre-2004 buildings, review the site asbestos register under section 425 of the WHS Regulation 2025 and engage a licensed asbestos removalist for any confirmed ACM disturbance.
- 7Isolate and verify all electrical circuits in the drilling zone using an authorised electrician and a cable locator prior to penetrating slabs, walls or bulkheads; apply lock-out tag-out.
- 8Establish exclusion zones around active glazing works using barriers and signage; prohibit unauthorised personnel within a radius equal to the panel height plus one metre until fixings are complete.
- 9Apply manifestation to completed frameless glass immediately on installation in accordance with AS 1288 to prevent walk-into incidents, and use temporary high-visibility tape where permanent film is not yet applied.
- 10Provide task-specific PPE: cut-level D gloves (AS/NZS 2161.3), safety glasses (AS/NZS 1337.1), steel-capped footwear (AS/NZS 2210.3), P2 respirators when cutting concrete, and forearm protection when handling raw edges.
- 11Implement a documented pre-start inspection of vacuum lifters, scaffolds, EWPs and power tools, with defective equipment tagged out under AS/NZS 3760 for electrical testing.
- 12All workers to hold CPCCWHS1001 (White Card); the SWMS is to be developed in consultation with workers under section 47 of the WHS Act 2011 (NSW), signed by all persons doing the work, and reviewed under section 302 of the WHS Regulation 2025 whenever controls fail, incidents occur or the work method changes.
Applicable Codes of Practice
Approved Code guiding fall-prevention controls for glazing installation above 2 m, including scaffold and EWP selection.
Approved Code detailing SWMS content, consultation and high risk construction work obligations under sections 291 and 299.
Governs glass type selection, structural adequacy, human impact safety and manifestation for partition glazing.
Specifies performance requirements for Grade A safety glass used in partitions to reduce injury on breakage.
High-Risk Construction Work triggered
Head channels, transoms and upper glazing beads for full-height partitions are routinely installed at 2.4β3.6 m, requiring workers to operate from scaffolds, EWPs or stepladders at heights where a fall would exceed two metres.
Section 299 of the Work Health and Safety Regulation 2025 (NSW) requires a compliant SWMS to be prepared before HRCW commences, complied with during the work, and reviewed under section 302 whenever controls are revised or an incident occurs. Failure to prepare, comply with or produce a SWMS on request exposes the PCBU and officers to prosecution under sections 31 (Category 1 β reckless conduct) or 32 (Category 2 β failure to comply with a health and safety duty) of the WHS Act 2011 (NSW), with penalties set out in the current SafeWork NSW penalty schedule.
Who this is for
- βCommercial glaziers and glazing subcontractors installing office and retail partitions
- βShopfitters and fit-out contractors self-performing glazing scope
- βPrincipal contractors coordinating tenancy fit-outs requiring glazing SWMS from trades
- βSite supervisors and project managers responsible for HRCW compliance on Class 5β9 buildings
- βSole-trader glaziers and small crews tendering for commercial fit-out packages
What you receive
- βFully editable Microsoft Word SWMS aligned to the WHS Regulation 2025 (NSW)
- βPre-populated hazards, risk ratings and hierarchy-of-control measures specific to glass partition installation
- βSection 291 HRCW identification and section 299 compliance statements
- βWorker sign-on register and daily pre-start review sheet
- βConsultation record aligned to section 47 of the WHS Act 2011 (NSW)
- βSWMS review and amendment log meeting section 302 requirements
- βPlant, tool and PPE schedule referencing current AS/NZS standards
- βEmergency response, first aid and incident notification prompts referencing section 38 of the WHS Act
- βGuidance notes for site-specific customisation and principal contractor submission
Worked example
A three-person glazing crew is engaged by a fit-out contractor to install 42 frameless 12 mm toughened glass partitions across a Level 14 tenancy on Kent Street, Sydney CBD. Panels are 2.7 m high and average 68 kg. The crew loads the SWMS with the building address, lift access constraints, and the goods lift booking window. Because installation of head channels at 2.7 m constitutes HRCW under section 291(1) of the WHS Regulation 2025, the SWMS is provided to the principal contractor before mobilisation. On site, panels are transported on rated A-frame trolleys, positioned using a twin-circuit vacuum lifter, and installed from a certified mobile scaffold. When the crew discovers unregistered bonded asbestos backing behind an existing partition on Day 2, work stops, the SWMS is reviewed under section 302, and a licensed removalist is engaged before glazing resumes.
Related legislation
- Work Health and Safety Act 2011 (NSW)
- Work Health and Safety Regulation 2025 (NSW)
- Construction Work Code of Practice (NSW)
- Managing the Risk of Falls at Workplaces Code of Practice (NSW)
- How to Manage Work Health and Safety Risks Code of Practice (NSW)
- Managing Noise and Preventing Hearing Loss at Work Code of Practice (NSW)
Frequently asked questions
Is glass partition installation always high risk construction work?
Not automatically. It becomes HRCW under section 291 of the WHS Regulation 2025 (NSW) when any part of the work carries a risk of a person falling more than two metres β which applies to almost all full-height commercial partitions β or where other s291 triggers such as work on or adjacent to energised installations are present. Where any trigger applies, a SWMS is mandatory under section 299.
Do I need a scaffold for 2.4 m high partitions?
Fixing head channels at 2.4 m places the worker at a height where a fall would exceed two metres. A compliant mobile scaffold or elevating work platform is the preferred control. Stepladders should only be used for brief, incidental tasks below 2 m and are not appropriate as a primary work platform for glazing installation.
How do we manage the risk of spontaneous glass breakage?
Specify heat-soaked toughened glass or toughened-laminated glass to AS/NZS 2208, protect edges from impact during transport and installation, use rated vacuum lifters, maintain exclusion zones during positioning, and apply manifestation to AS 1288 immediately on completion. Workers should wear cut-resistant gloves, eye protection and forearm protection when handling panels.
When must the SWMS be reviewed?
Section 302 of the WHS Regulation 2025 (NSW) requires review whenever controls are revised, an incident or near-miss occurs, the work method changes, or a health and safety representative requests it. Reviews must be documented in the SWMS amendment log and re-communicated to all workers, who then sign onto the updated version before work resumes.
Document details
Related SWMS templates
π οΈDemountable Partition Installation SWMS
NSW β Demountable Partition Installation. Full task scope, hazards and controls to be authored to Phase 1 stanβ¦
πͺWindow & Glass Pane Installation SWMS
NSW β Window & Glass Pane Installation. Full task scope, hazards and controls to be authored to Phase 1 standaβ¦
π§±Acoustic Ceiling Tile Installation SWMS
NSW β Acoustic Ceiling Tile Installation. Full task scope, hazards and controls to be authored to Phase 1 stanβ¦
π’Aluminium Composite Panel Installation SWMS
NSW β Aluminium Composite Panel Installation. Full task scope, hazards and controls to be authored to Phase 1 β¦
π§Artificial Turf Installation SWMS
NSW β Artificial Turf Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.
πBoiler & Pressure Vessel Installation SWMS
NSW β Boiler & Pressure Vessel Installation. Full task scope, hazards and controls to be authored to Phase 1 sβ¦