Glass Coating & Tinting SWMS
NSW β Glass Coating & Tinting. Full task scope, hazards and controls to be authored to Phase 1 standard.
SWMS variants reference your stateβs WHS legislation. Instant download after payment.
Glass coating and tinting involves the application of adhesive polyester films, security laminates, decorative frosting and solar-control coatings to installed glazing in commercial, residential and retail settings. The work is performed close to large glass panes at height on scaffolds, ladders and elevating work platforms, and requires the use of slip-solutions (soapy water), squeegees, precision blades and sometimes solvent-based cleaners. Hazards include cuts from razor blades and glass edges, glass breakage under thermal or mechanical stress, falls when working near unprotected glazed openings, chemical exposure from cleaning agents and film adhesives, manual handling of large rolls and panes, and slips on wet floors created by the application fluid.
Under the Work Health and Safety Regulation 2025 (NSW), work that involves a risk of a person falling more than 2 metres is high risk construction work under section 291, triggering the requirement in section 299 for a Safe Work Method Statement prepared before work commences. This SWMS applies the hierarchy of control from section 36, prioritises elimination and engineering controls (EWPs, edge protection) over PPE, and documents consultation with workers under section 47.
Hazards identified
12 hazards covered, sorted by priority.
Fatal or catastrophic injury from falls exceeding 2 metres
Fatal lacerations, impalement or fall to lower level
Deep cuts to hands, wrists, tendons; potential arterial injury
Serious cuts, eye injury, falling glass striking persons below
Acute back, shoulder and wrist injuries; chronic musculoskeletal disorders
Respiratory irritation, dermatitis, eye burns, headaches
Fractures, head injury from same-level falls
Electric shock, electrocution, fire
Struck-by injuries from dropped tools, blades or off-cuts
Respirable crystalline silica exposure; lead absorption
Inhalation of asbestos fibres; long-latency disease
Shoulder impingement, lateral epicondylitis, wrist strain
Control measures
Hierarchy-of-controls order: elimination β substitution β isolation β engineering β administrative β PPE.
- 1Eliminate work at height where practicable by tinting glass panels at ground level before installation, or scheduling coating during factory glazing manufacture.
- 2Substitute solvent-based cleaners with low-VOC water-based slip-solutions (baby shampoo and water) and isopropyl alcohol at the lowest effective concentration; obtain and review SDS for every product used.
- 3Use elevating work platforms (scissor lifts, boom lifts) compliant with AS 2550.10 in preference to ladders for any work above 2 metres; operators to hold the relevant HRW licence for boom lifts with boom length β₯ 11 m.
- 4Where EWPs are not practicable, install edge protection or use mobile scaffolds compliant with AS/NZS 1576 series, erected by a competent person; ladders used only for light, short-duration access per the SafeWork NSW Code of Practice: Managing the risk of falls at workplaces.
- 5Identify and cordon any glass panel that could be mistaken for an opening; apply visible manifestation and confirm panels are fixed and load-tested before leaning or applying pressure.
- 6Isolate power to fittings and outlets within 1 metre of wet application zones; use RCD-protected leads compliant with AS/NZS 3012 and cover fittings with plastic sheeting.
- 7Use retractable safety knives with finger guards; blades changed at the first sign of dullness; cut-resistant gloves rated to AS/NZS 2161.3 worn during trimming; establish a designated blade-disposal sharps container.
- 8Manage manual handling by using two-person lifts for rolls over 15 kg or longer than 1.5 m, roll trolleys, and mechanical lifters for glass panels; rotate squeegee tasks to limit repetitive strain.
- 9Establish exclusion zones below overhead work with barriers, signage and spotters; drop-sheet floors to contain slip-solution and place wet-floor signage in occupied areas.
- 10Where scraping old film or adjacent frames on pre-2004 residential or pre-1990 commercial buildings, test for asbestos and lead before disturbance; if positive, cease work and engage a licensed removalist per the Work Health and Safety Regulation 2025 (NSW), Chapter 8.
- 11PPE: safety glasses to AS/NZS 1337.1, cut-resistant gloves, non-slip footwear, chemical-resistant nitrile gloves when handling activators, and P2 respirator to AS/NZS 1716 when scraping residue or using aerosol solvents.
- 12All workers hold CPCCWHS1001 (White Card); SWMS reviewed with workers under section 47 of the WHS Act 2011 (NSW) before work starts and re-reviewed under section 302 of the WHS Regulation 2025 (NSW) whenever controls, personnel or the work environment change.
Applicable Codes of Practice
Primary code for controlling falls from ladders, scaffolds and EWPs during elevated glazing work
Sets the framework for HRCW identification, SWMS content and site consultation
Applies to handling of film rolls, ladders and glass panels
Design and erection standard for mobile scaffolds used during interior tinting at height
High-Risk Construction Work triggered
Coating and tinting of upper-storey windows, atrium glazing, shopfronts and stairwell balustrades is routinely performed from ladders, EWPs or mobile scaffolds at heights well above 2 metres, and a fall from these positions is reasonably foreseeable.
Section 299 of the Work Health and Safety Regulation 2025 (NSW) requires a SWMS to be prepared before HRCW commences, and section 302 requires it to be reviewed and revised whenever controls are inadequate or conditions change. Failure to comply exposes the PCBU to prosecution under the Work Health and Safety Act 2011 (NSW), including Category 1 offences under section 31 (reckless conduct causing risk of death or serious injury) and Category 2 offences under section 32 (failure to comply with a health and safety duty exposing a person to risk). Current maximum penalties are set out in the SafeWork NSW penalty schedule, which is indexed periodically.
Who this is for
- βWindow film and tinting contractors performing commercial and residential installations
- βGlazing companies offering post-installation coating and safety film services
- βSolar-control and security-film applicators working in occupied premises
- βDecorative frosting and signage installers applying vinyl and film to glazed surfaces
- βPrincipal contractors and builders engaging tinting subcontractors on construction sites
What you receive
- βEditable Microsoft Word SWMS pre-populated for glass coating and tinting scope
- βNSW-specific legislative references to the WHS Act 2011 and WHS Regulation 2025
- βFull hazard register with risk ratings before and after controls
- βHierarchy-of-control aligned control measures with AS/NZS citations
- βa high risk construction work category (falls more than 2 m) trigger analysis and justification
- βWorker consultation and sign-on register meeting section 47 requirements
- βSWMS review and amendment log addressing section 302 obligations
- βPPE schedule with Australian Standard references for each item
- βEmergency response, first-aid and incident-notification procedures for cuts, falls and chemical exposure
Worked example
A tinting crew is engaged to apply solar-control film to the western elevation of a four-storey commercial building in Parramatta. The upper three levels require access from a boom-type EWP in the loading dock, while the ground-floor shopfront is done from step platforms. Before mobilising, the supervisor walks the site with the two applicators, reviews this SWMS, and each worker signs the consultation register under section 47 of the WHS Act 2011 (NSW). The EWP operator produces their HRW licence; the unit is checked against AS 2550.10 and a pre-start recorded. Slip-solution is decanted into labelled bottles per the SDS; RCD leads are used for the heat gun. Mid-morning, one panel on Level 3 is found to have edge damage. Work stops, the panel is isolated, the SWMS is reviewed under section 302, and the control set is amended to require a second panel inspection before film application. The amendment is signed by both applicators before work resumes.
Related legislation
- Work Health and Safety Act 2011 (NSW)
- Work Health and Safety Regulation 2025 (NSW)
- Work Health and Safety Regulation 2025 (NSW), Chapter 6 β Construction work
- Work Health and Safety Regulation 2025 (NSW), Chapter 7 β Hazardous chemicals
- Work Health and Safety Regulation 2025 (NSW), Chapter 8 β Asbestos
- Environmental Planning and Assessment Act 1979 (NSW) β for scaffold and hoarding approvals over public footpaths
Frequently asked questions
Is glass coating and tinting always high risk construction work?
It is HRCW under section 291 of the Work Health and Safety Regulation 2025 (NSW) whenever there is a risk of a person falling more than 2 metres, which covers most upper-storey, shopfront and atrium tinting. Ground-floor domestic work at low level may not trigger HRCW, but a SWMS remains best practice and is still required if any other s291 category applies.
Do I need a White Card to apply window film on a construction site?
Yes. Any worker who enters a construction site to carry out construction work β including tinting during fit-out or after installation β must hold CPCCWHS1001 general construction induction (White Card). The principal contractor is required to verify this before site entry.
Can I use a ladder instead of an EWP for upper-level windows?
The hierarchy of control in section 36 of the WHS Regulation 2025 (NSW) requires higher-order controls to be considered first. Ladders are only acceptable for light, short-duration tasks where an EWP or scaffold is not reasonably practicable, and the SafeWork NSW Code of Practice: Managing the risk of falls at workplaces must be followed. Justification for ladder use should be recorded in the SWMS.
When must the SWMS be reviewed?
Section 302 of the WHS Regulation 2025 (NSW) requires the SWMS to be reviewed and, if necessary, revised whenever the control measures are shown to be inadequate, a notifiable incident occurs, the work method changes, or new hazards are introduced β for example when scope extends to a higher level, new film chemistry is used, or a different EWP is substituted.
Document details
Related SWMS templates
πͺGlass Partition Installation SWMS
NSW β Glass Partition Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.
πͺWindow & Glass Pane Installation SWMS
NSW β Window & Glass Pane Installation. Full task scope, hazards and controls to be authored to Phase 1 standaβ¦
π§±Acoustic Ceiling Tile Installation SWMS
NSW β Acoustic Ceiling Tile Installation. Full task scope, hazards and controls to be authored to Phase 1 stanβ¦
π’Aluminium Composite Panel Installation SWMS
NSW β Aluminium Composite Panel Installation. Full task scope, hazards and controls to be authored to Phase 1 β¦
π§Artificial Turf Installation SWMS
NSW β Artificial Turf Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.
β£οΈAsbestos Soil Remediation SWMS
NSW β Asbestos Soil Remediation. Full task scope, hazards and controls to be authored to Phase 1 standard.