← All SWMS Documents
⚡
Utility-Scale BESS Construction SWMS
Construction and commissioning of utility / grid-scale Battery Energy Storage System (BESS) sites — multi-MW container-class Li-ion installations, HV substation interconnection, DC string field assembly, fire suppression and ventilation, and integrated SCADA commissioning. Distinct from residential / commercial BESS installation.
⚖️WHS Regulation 2025 & Codes of Practice — legally binding from 1 July 2026 (s26A)
👷Reviewed by certified occupational health and safety professionals
🗺️State-specific variants for all 8 Australian jurisdictions
$199 AUD✓ Instant Download Available
SWMS variants reference your state’s WHS legislation. Instant download after payment.
What's in this SWMS
Document details
Regulation
WHS Regulation 2025
HRCW Category
Work on or near energised electrical installations (HV substation + DC arrays) + Work in flammable or contaminated atmosphere (Li-ion thermal runaway risk) + Work involving structural lifting of container-class BESS units
Hazards Identified
14 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment