Multi-Trade Building Maintenance SWMS
Safe Work Method Statement for reactive and preventive maintenance by a multi-skilled technician moving between tasks and sites β minor carpentry, patching and painting, ceiling tiles, minor plumbing and electrical tasks within licence limits, roof and gutter access, cleaning and furniture moves β with a job-by-job check and referral to specialist SWMS.
SWMS variants reference your stateβs WHS legislation. Instant download after payment.
This Safe Work Method Statement covers reactive and preventive building maintenance by a multi-skilled technician or small crew moving between short tasks and sites in one shift β minor carpentry and hardware repairs, plasterboard patching and paint touch-ups, ceiling tile replacement, minor plumbing and lamp changes within licence limits, gutter and roof-access checks, graffiti removal, pressure cleaning, rubbish removal, grounds touch-ups and furniture moves. It sets out the recurring hazards of that work pattern, a job-by-job check the technician completes before every task to decide whether the task is inside the SWMS, and the control measures in hierarchy-of-control order, with clear referral points for asbestos, electrical wiring work, licensed plumbing, confined spaces and unprotected roofs.
Hazards identified
10 hazards covered, sorted by priority.
Exposure to unplanned hazards, unlicensed work, asbestos or electrical exposure
Fractures, head and spinal injury, death
Inhalation of asbestos fibres causing mesothelioma, asbestosis and lung cancer
Electric shock, electrocution, burns and fire
Delayed first aid after a fall, shock, medical event or assault
Asphyxiation, poisoning or drowning
Silicosis, lung cancer and lead poisoning
Chemical burns, dermatitis, injection injury and carbon monoxide poisoning
Needlestick and infection, physical and psychological injury
Musculoskeletal injury, vehicle crash, heat illness, fractures
Control measures
Hierarchy-of-controls order: elimination β substitution β isolation β engineering β administrative β PPE.
- 1Elimination β Complete the job-by-job check before every task and decline or refer out any task outside the SWMS; work from the ground with extension tools instead of climbing; leave asbestos, electrical wiring work, licensed plumbing and confined spaces to the right specialists.
- 2Substitution β Use a platform ladder or mobile scaffold with guardrails instead of a step or extension ladder, battery tools instead of corded tools, and water-based, low-hazard cleaners instead of solvent products.
- 3Isolation β Barricade and sign the work area in occupied premises; isolate the lighting circuit with lock-out and tag-out before lamp changes and isolate water before minor plumbing tasks; never enter or lean into pits and tanks.
- 4Engineering β On-tool dust extraction to an H-class vacuum for drilling; RCD protection on all mains-powered tools; roof access only with installed edge protection or an inspected fall-arrest anchorage system; trolleys and dollies for furniture moves; cargo barrier and restrained loads in the service vehicle.
- 5Administrative β Check the building asbestos register before drilling, cutting or removing building material in buildings constructed before 31 December 2003; follow a check-in system for lone and remote work with escalation for missed check-ins; sign in and complete each site induction; keep SDS for every product carried.
- 6PPE β Safety boots, safety glasses or face shield, task-appropriate and puncture-resistant gloves, fit-tested P2 respirator for dusty work, hearing protection, hi-vis outdoors, and sun protection for outdoor tasks.
Applicable Codes of Practice
Ladders, platform ladders, mobile scaffolds, roof access, edge protection, fall arrest and fragile roofs.
Checking the asbestos register before maintenance work, presumed asbestos and the unexpected-find procedure.
Isolation, lock-out and tag-out, RCDs and inspection of portable tools and leads.
Recognising pits and tanks as confined spaces and referring out any work requiring entry.
Cleaning agents, solvents, graffiti removers and pressure-cleaning chemicals, SDS and registers.
Furniture moves, ladder handling, rubbish removal and awkward postures.
Who this is for
- βFacilities maintenance contractors
- βProperty-services firms holding building maintenance contracts
- βHandymen and multi-skilled maintenance technicians servicing offices, retail, schools and strata
- βFacility managers setting safe work procedures for maintenance contractors
What you receive
- βEditable DOCX template β Microsoft Word compatible
- βOne-page job-by-job check for the technician to complete before every task
- βFull hazard register with inherent and residual risk ratings and controls in hierarchy-of-control order
- βConstruction work and high risk construction work status table, with clear referral points for out-of-scope tasks
- βLone and remote work check-in system, emergency response and contacts table
- βWorker consultation, sign-on register and SWMS review log
Worked example
A technician has five jobs in one shift across three sites. At a 1980s office building the first job is a sticking fire door closer and a damaged plasterboard patch. Before starting, the technician completes the job-by-job check, finds the building was constructed before 31 December 2003, and checks the asbestos register at reception, which records the wall as plasterboard with no asbestos. The patch is cut back with a battery tool and the area barricaded from staff. At a bank branch the work order asks for a lamp change, but the fitting is damaged and needs replacing; that is electrical wiring work, so the technician stops and refers it to a licensed electrician. At a school the last job is a gutter check: the technician inspects it from a secured ladder at the eave instead of going onto the roof, and checks in with the supervisor on arrival and departure at each site.
Related legislation
- Work Health and Safety Act 2011 (NSW)
- Work Health and Safety Regulation 2025 (NSW) β s48 remote or isolated work, s289 and s291 construction work and high risk construction work, s299 SWMS
- WHS Regulation 2025 (NSW) β Chapter 8 asbestos and Chapter 8A crystalline silica
- Managing the risk of falls at workplaces β Code of Practice
Frequently asked questions
Do I need a SWMS for building maintenance work?
A SWMS is legally required only where a task is high risk construction work β construction work that, for example, involves a risk of a person falling more than 2 m, is likely to involve disturbing asbestos, or is carried out near energised electrical installations or a confined space. Minor maintenance and repair work is not construction work under the Regulation. The document explains this and is used as the safe work procedure for the remaining tasks; clients and facility managers commonly ask for it either way.
What is the job-by-job check?
It is a one-page form the technician completes before every task at every site. It asks whether the task matches the work order and is inside the SWMS, whether the asbestos register has been checked, whether a fall of more than 2 m is possible, whether services are isolated, and whether lone-work check-ins are in place. Any out-of-scope answer means stop and call the supervisor.
Does it cover electrical and plumbing work?
Only within licence limits. Lamp and plug-in component changes are covered with the circuit isolated; electrical wiring work and plumbing, drainage or gasfitting work that needs a licence are referred to an appropriately licensed person.
Does it cover roof work?
It covers gutter and roof-access checks from a ladder, or on a roof only where installed edge protection or an inspected fall-arrest anchorage system is in place. Roofs without those controls, and fragile roofing, are referred to a specialist roof work SWMS.
Is this a completed site document?
It is a template until you complete it. You must review it against your contract, sites and technicians, add your details, and consult your workers before the work starts.
Document details
Related SWMS templates
πͺWorking in Risers SWMS
Working in service risers covers ladder access through floor penetrations, fall arrest in vertical shafts, AS β¦
π’Make Good (End of Lease) SWMS
Safe Work Method Statement for reinstating a commercial or retail tenancy to its lease condition β strip-out oβ¦
π Roof Access SWMS
General roof access for inspection, maintenance, and minor works including anchor point use and edge protectioβ¦
βοΈAC Service & Repairs SWMS
Air conditioning service and repair work covers split-system, ducted, and VRV/VRF service tasks including refrβ¦
π’Building Maintenance Unit (BMU) SWMS
BMU operations covers high-rise facade access using building-mounted davit and cradle systems, AS 1418.13 compβ¦
π Roof Tile Replacement SWMS
Roof tile replacement covers the removal and replacement of individual or localised damaged tiles on existing β¦