Stonework - Masonry SWMS

NSW β€” Stonework - Masonry. Full task scope, hazards and controls to be authored to Phase 1 standard.

βš–οΈWHS Regulation 2025 & Codes of Practice β€” legally binding from 1 July 2026 (s26A)
πŸ‘·Reviewed by certified occupational health and safety professionals
πŸ—ΊοΈState-specific variants for all 8 Australian jurisdictions
$199 AUDβœ“ Instant Download Available

SWMS variants reference your state’s WHS legislation. Instant download after payment.

Stonework and masonry construction involves the placement of natural stone, manufactured stone, and masonry units to form load-bearing walls, cladding, retaining structures, and decorative features. The work combines heavy manual handling of dense units (often 15-40 kg per stone), operation of cutting equipment that liberates respirable crystalline silica, work at height on scaffolds and elevated work platforms, and the construction and temporary support of partially-completed structures that are inherently unstable until mortar cures and lateral restraint is achieved.

Under the Work Health and Safety Regulation 2025 (NSW), stonework and masonry work meets the definition of high risk construction work under section 291 where workers can fall more than 2 metres and where structural alteration requires temporary support to prevent collapse. Section 299 requires a Safe Work Method Statement to be prepared before this work commences, and the SWMS must identify hazards, document risk controls applied through the hierarchy of controls, and describe how controls will be implemented, monitored and reviewed.

Hazards identified

12 hazards covered, sorted by priority.

Fall from scaffold, edge or trestle exceeding 2 metres during wall construction above single-storey heightHIGH

Fatal or catastrophic injury from impact with ground, projecting reinforcement or debris

Collapse of partially-completed masonry wall before mortar cures or lateral bracing is fittedHIGH

Crush fatality or severe crush injury to bricklayers and adjacent trades

Respirable crystalline silica dust from cutting, grinding, chasing or dry-drilling stone, brick, block or engineered stoneHIGH

Silicosis, lung cancer, chronic obstructive pulmonary disease and autoimmune disease

Structural collapse during alteration, cutting of openings or removal of load-bearing masonry without adequate proppingHIGH

Multiple fatalities from uncontrolled wall or lintel collapse

Crush injury from mechanical lifting of stone pallets, blocks or feature stones by crane, telehandler or brick elevatorHIGH

Fatal crush injury from suspended or dropped load

Musculoskeletal injury from repetitive manual handling of masonry units, mortar and mixed materialsHIGH

Chronic lower back injury, shoulder rotator cuff damage, cumulative disability

Contact with wet cement, lime mortar and cement dust causing chemical burns and allergic contact dermatitisMEDIUM

Deep alkaline burns, chromate sensitisation, chronic dermatitis

Electric shock from 240V mixers, saws and grinders in wet conditions or with damaged leadsMEDIUM

Electrocution or serious electrical burn

Struck by projectile from abrasive cutting wheel disintegration or ejected stone fragmentMEDIUM

Penetrating eye injury, facial laceration, loss of vision

Noise exposure from masonry saws, grinders, hammer drills and mortar mixers exceeding 85 dB(A)MEDIUM

Permanent noise-induced hearing loss and tinnitus

Hand-arm vibration from prolonged use of grinders, breakers and rotary hammersMEDIUM

Hand-arm vibration syndrome, Raynaud's phenomenon, nerve damage

Heat stress during summer work on unshaded slabs and against radiant masonry surfacesMEDIUM

Heat exhaustion, heat stroke, dehydration-related incidents

Control measures

Hierarchy-of-controls order: elimination β†’ substitution β†’ isolation β†’ engineering β†’ administrative β†’ PPE.

  1. 1Eliminate work at height by pre-fabricating stone panels at ground level and lifting into position where design permits; sequence work so upper courses are laid from a scaffold platform rather than a ladder or trestle.
  2. 2Substitute dry cutting with wet cutting for all masonry saws, block splitters and grinders to suppress respirable crystalline silica at source, in accordance with the SafeWork NSW Working with silica and silica containing products code and AS/NZS 60335.2.45 for portable cutting equipment.
  3. 3Erect edge-protected scaffolding compliant with AS/NZS 1576 (scaffolding) and AS/NZS 4576 (guidelines for scaffolding) with guardrails, mid-rails and toeboards for any work platform above 2 m; scaffolds above 4 m to be erected by a ticketed scaffolder and handover certificate issued before use.
  4. 4Engineer temporary support for structural alteration works: install propping designed to AS 3610 (formwork for concrete) principles and needle/prop lintel supports certified by a structural engineer before any load-bearing masonry is cut, chased or removed; propping to remain until new lintel or beam achieves design strength.
  5. 5Brace freestanding and partially-completed masonry walls with raking props or temporary bracing at maximum spacings specified in AS 3700 (masonry structures) until permanent lateral restraint (roof tie-down, return walls, bond beams) is in place; do not exceed unbraced height limits in wind.
  6. 6Use on-tool local exhaust ventilation (H-class shroud and vacuum) or integrated water suppression on all cutting, grinding and chasing tools; conduct atmospheric monitoring to confirm exposures remain below the workplace exposure standard of 0.05 mg/mΒ³ (8-hour TWA) for respirable crystalline silica.
  7. 7Provide mechanical aids for handling: brick tongs, block clamps, wheelbarrows, brick elevators and telehandler forks with masonry attachments; limit single-person lifts to units under 20 kg and require two-person or mechanical handling above this threshold.
  8. 8Test and tag all 240V electrical equipment every 3 months per AS/NZS 3012 (electrical installations - construction and demolition sites); supply through a portable RCD and inspect leads daily for damage; isolate and lock out damaged equipment.
  9. 9Issue task-appropriate PPE: P2 respirators (or PAPR for extended cutting) fit-tested per AS/NZS 1715, safety eyewear to AS/NZS 1337.1, Class 5 hearing protection to AS/NZS 1270, chemical-resistant gloves for mortar work, steel-capped boots to AS/NZS 2210.3, and hi-vis to AS/NZS 4602.1.
  10. 10Implement a silica health monitoring program per WHS Regulation 2025 (NSW) sections 435-445: baseline and periodic low-dose HRCT chest imaging, spirometry and occupational history for all workers with ongoing silica exposure, coordinated by a registered medical practitioner with occupational health experience.
  11. 11Schedule rest breaks and cool water access during heat stress conditions above 32Β°C ambient; rotate workers off cutting stations to limit vibration exposure below the daily A(8) action value of 2.5 m/sΒ² per AS 2670.1.
  12. 12All workers to hold White Card (CPCCWHS1001) and be inducted into this SWMS before commencing; consultation with workers is required under section 47 of the WHS Act 2011 (NSW) and the SWMS must be reviewed under section 302 of the WHS Regulation 2025 (NSW) whenever controls are revised, an incident occurs, or a new hazard is identified.

Applicable Codes of Practice

Construction Work Code of Practice (SafeWork NSW)βš– Legally binding Β· 1 Jul 2026

General construction duties including SWMS preparation, site induction, and management of high risk construction work under section 291.

Working with silica and silica containing products Code of Practice (SafeWork NSW)βš– Legally binding Β· 1 Jul 2026

Mandatory controls for cutting, grinding and drilling masonry materials that generate respirable crystalline silica.

Managing the Risk of Falls at Workplaces Code of Practice (SafeWork NSW)βš– Legally binding Β· 1 Jul 2026

Fall prevention hierarchy for scaffolds, edge protection and elevated masonry work above 2 metres.

AS 3700 Masonry structures

Design and construction requirements for masonry including unbraced wall heights, bracing and temporary stability during construction.

High-Risk Construction Work triggered

s291(a)
Involves a risk of a person falling more than 2 metres

Masonry construction above single-storey height requires work from scaffolds, hop-ups and elevated platforms where workers, tools and materials can fall more than 2 metres to the ground or lower level below.

s291(e)
Involves structural alterations or repairs that require temporary support to prevent collapse

Cutting openings in load-bearing masonry, replacing lintels, underpinning and modifying existing walls all require engineered temporary propping and needle supports to prevent uncontrolled collapse during the works.

Legal consequence

Section 299 of the WHS Regulation 2025 (NSW) requires a compliant SWMS to be prepared before high risk construction work commences and section 302 requires the SWMS to be reviewed and revised when controls change or an incident occurs. Failure to prepare, comply with or review a SWMS exposes the PCBU and officers to prosecution under section 32 (Category 2 - failure to comply with a health and safety duty exposing a person to risk of death or serious injury) or section 31 (Category 1 - reckless conduct) of the Work Health and Safety Act 2011 (NSW). Current maximum penalties are published in the SafeWork NSW penalty schedule and are indexed periodically.

Who this is for

  • β†’Licensed bricklaying and stonemasonry contractors undertaking residential and commercial masonry works
  • β†’Builders and principal contractors engaging masonry subcontractors on Class 1-9 buildings
  • β†’Heritage restoration specialists working on stone facades, chimneys and load-bearing masonry
  • β†’Landscape contractors constructing stone retaining walls, feature walls and paving above 2 m
  • β†’Owner-builders undertaking masonry works requiring SWMS documentation for principal contractor sign-off

What you receive

  • βœ“Editable SWMS document in Microsoft Word format aligned to WHS Regulation 2025 (NSW) section 299 content requirements
  • βœ“Complete hazard register with 10+ masonry-specific hazards, risk ratings and hierarchy-of-control treatments
  • βœ“Section 291 HRCW justification covering fall from height and structural alteration triggers
  • βœ“Silica management appendix referencing the SafeWork NSW silica code and health monitoring obligations
  • βœ“Scaffold and temporary works inspection checklists aligned to AS/NZS 1576 and AS 3700
  • βœ“Worker sign-on and consultation register satisfying WHS Act section 47 duties
  • βœ“SWMS review log for section 302 revision triggers (incident, control change, new hazard)
  • βœ“Emergency response and first aid procedures specific to masonry work sites
  • βœ“PPE issue register and fit-test record template for P2 respiratory protection to AS/NZS 1715

Worked example

A bricklaying contractor at Wentworth Point is engaged to construct 3.6-metre-high recycled brick feature walls and an internal load-bearing masonry stair core on a four-townhouse development. The scope includes cutting a new door opening through an existing double-brick party wall retained from the previous structure. Because workers will operate from scaffold above 2 metres and the party wall alteration requires engineered temporary support to prevent collapse, both section 291(a) and section 291(e) HRCW categories are triggered under the WHS Regulation 2025 (NSW). The contractor prepares this SWMS, has it signed by all bricklayers and labourers, provides it to the principal contractor before work starts, engages a ticketed scaffolder to erect and hand over the perimeter scaffold, and obtains an engineer-designed propping schedule for the party wall opening. Wet-cut masonry saws with H-class vacuum extraction are used for all cutting, and workers are enrolled in the silica health monitoring program. The SWMS is reviewed after a near-miss involving a dropped brick from the second lift.

Related legislation

  • Work Health and Safety Act 2011 (NSW) β€” sections 19 (primary duty), 31-32 (Category 1 and 2 offences), 47 (consultation)
  • Work Health and Safety Regulation 2025 (NSW) β€” sections 291, 299, 302 (HRCW and SWMS)
  • Work Health and Safety Regulation 2025 (NSW) β€” sections 49-50, 435-445 (airborne contaminants, silica health monitoring)
  • Environmental Planning and Assessment Act 1979 (NSW) β€” development consent and construction certificate obligations
  • Protection of the Environment Operations Act 1997 (NSW) β€” dust and noise control on construction sites
  • Home Building Act 1989 (NSW) β€” licensing of bricklaying and stonemasonry work above prescribed value thresholds

Frequently asked questions

Does a garden retaining wall under 2 metres still need this SWMS?

If no worker can fall more than 2 metres and no structural alteration requires temporary support, the work may not trigger section 291 HRCW categories. However, a documented risk assessment is still required under the WHS Act and this SWMS remains best practice given silica, manual handling and electrical hazards persist regardless of height.

How does this SWMS address engineered stone bans?

The prohibition on the manufacture, supply, processing and installation of engineered stone benchtops, panels and slabs commenced 1 July 2024 nationally. This SWMS covers natural stone, brick, block and manufactured masonry units only. Any residual engineered stone work must comply with the SafeWork NSW transitional and exemption arrangements and is outside this document's scope.

Who can sign off temporary propping for structural alterations?

Section 291(e) work requires temporary support designed to prevent collapse. Propping schedules for load-bearing masonry alterations must be designed and certified by a Chartered Professional Engineer (CPEng) or Registered Professional Engineer (RPEQ-equivalent) with structural competence. The SWMS documents this requirement but does not substitute for engineered drawings.

How often must the SWMS be reviewed?

Section 302 of the WHS Regulation 2025 (NSW) requires review whenever controls are revised, a notifiable incident occurs, a new hazard is identified, or workers request review through consultation. In practice, we recommend a formal review at each new site, at any scope change, and at minimum every 12 months even if no trigger event has occurred.

What's in this SWMS

Document details

Regulation
Work Health and Safety Regulation 2025 (NSW), Section 291 β€” High Risk Construction Work
HRCW Category
s. 291(a) β€” Risk of fall greater than 2 metres; s. 291(e) β€” Structural alteration requiring temporary support
Hazards Identified
12 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment
CIH-reviewed SWMS Β· from $99 Β· instant download

Related SWMS templates

🧱Chimney & Fireplace Masonry SWMS

NSW β€” Chimney & Fireplace Masonry. Full task scope, hazards and controls to be authored to Phase 1 standard.

$199 AUDBuy β†’

🧱Masonry Cleaning & Caulking SWMS

NSW β€” Masonry Cleaning & Caulking. Full task scope, hazards and controls to be authored to Phase 1 standard.

$149 AUDBuy β†’

🧱Acoustic Ceiling Tile Installation SWMS

NSW β€” Acoustic Ceiling Tile Installation. Full task scope, hazards and controls to be authored to Phase 1 stan…

$149 AUDBuy β†’

🏒Aluminium Composite Panel Installation SWMS

NSW β€” Aluminium Composite Panel Installation. Full task scope, hazards and controls to be authored to Phase 1 …

$199 AUDBuy β†’

🚧Artificial Turf Installation SWMS

NSW β€” Artificial Turf Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.

$99 AUDBuy β†’

☣️Asbestos Soil Remediation SWMS

NSW β€” Asbestos Soil Remediation. Full task scope, hazards and controls to be authored to Phase 1 standard.

$249 AUDBuy β†’