Asbestos Management & Removal SWMS Templates
Asbestos identification, management plans, drilling, controlled removal, roof-sheet replacement, and licensed bulk removal SWMS. How to Manage and Control Asbestos in the Workplace CoP, How to Safely Remove Asbestos CoP, and licensed-removalist requirements (Class A / Class B).
About these SWMS
Asbestos Management & Removal SWMS templates cover the identification, assessment, control, and licensed removal of asbestos-containing materials (ACM) across Australian construction, maintenance, demolition, and refurbishment work. All work involving asbestos is High-Risk Construction Work under WHS Regulation 2025 (Part 8.1, asbestos), requiring a documented SWMS before work commences. These templates align with the model Code of Practice: How to Manage and Control Asbestos in the Workplace, the Code of Practice: How to Safely Remove Asbestos, and AS 4964 (sampling and analysis) and AS/NZS 1715/1716 (respiratory protection). They support Class A (friable) and Class B (non-friable) licensed removalists, asbestos assessors, and PCBUs managing in-situ ACM registers and removal control plans.
What this category covers
- βAsbestos register development and workplace ACM identification surveys
- βControlled drilling of asbestos cement sheet for service penetrations
- βAsbestos Removal Control Plan (ARCP) preparation for licensed removal
- βClass B non-friable removal of cement sheeting and vinyl tiles
- βRoof sheet replacement and super-six corrugated removal
- βEncapsulation of in-situ ACM using approved sealant systems
- βSoil disturbance and excavation in asbestos-contaminated land
- βDecontamination unit setup and personal decontamination procedures
- βAir monitoring, clearance inspections, and certificate issuance
- βWrapping, labelling, and transport of asbestos waste to licensed facilities
- βEmergency response to unexpected ACM discovery during works
- βNegative pressure enclosure construction for friable Class A work
6 SWMS in this category
6 ready-to-buy editable DOCXs Β· 8 state variants per product Β· delivered within 24 hours of payment.
β οΈAsbestos Mgmt SWMS
In-situ asbestos identification, condition monitoring, register maintenance, and minor sealing/encapsulation.
β£οΈAsbestos Class B Non-Friable SWMS
Class B licensed asbestos removal β non-friable bonded asbestos cement products (fibro sheeting, asbestos cement pipes, vinyl floor tiles wiβ¦
β οΈAsbestos Drilling Holes SWMS
Controlled drilling of holes into bonded asbestos material covers wet-drilling technique, water trap to capture residue, P3 respiratory protβ¦
β£οΈAsbestos Encapsulation SWMS
Asbestos encapsulation β sealing intact asbestos-containing material (ceiling lagging, pipework insulation, plant insulation) with a registeβ¦
β£οΈAsbestos Removal Control Plan SWMS
Asbestos Removal Control Plan (ARCP) β site-specific compliance document required under WHS Regulation Chapter 8 for any licensed asbestos rβ¦
β£οΈAsbestos Soil & Contaminated Land SWMS
Excavation and earthworks on land contaminated with asbestos β bonded fragments, fibro pieces, buried demolition waste. Includes pre-works cβ¦
Applicable standards & regulations
Frequently asked questions
Is asbestos work always High-Risk Construction Work requiring a SWMS?
Yes. Under WHS Regulation 2025, any construction work involving asbestos is listed as High-Risk Construction Work (Category 7), and a SWMS must be prepared before work commences. This applies regardless of whether the work is licensed Class A, Class B, or unlicensed minor work under 10 square metres of non-friable ACM. The SWMS must identify hazards, controls, PPE, and the persons responsible, and be available at the workplace for the duration of the work as required by the How to Safely Remove Asbestos Code of Practice.
What is the difference between a SWMS and an Asbestos Removal Control Plan?
A SWMS addresses the high-risk construction work hazards and controls for the people performing the task, as required by WHS Regulation 2025. An Asbestos Removal Control Plan (ARCP) is a separate, broader document mandated for all licensed asbestos removal work under the How to Safely Remove Asbestos Code of Practice. The ARCP details site setup, removal method, waste handling, air monitoring, and clearance. Licensed removalists need both documents β the ARCP governs the project, and the SWMS governs the task-level execution.
Do I need a Class A or Class B licence for the asbestos work I'm doing?
A Class B licence is required to remove more than 10 square metres of non-friable (bonded) ACM such as cement sheeting, vinyl tiles, or roof sheets. A Class A licence is required for any quantity of friable asbestos, including lagging, insulation, and asbestos contamination dust. Class A work also requires negative pressure enclosures and independent licensed asbestos assessor oversight under WHS Regulation 2025 Part 8.10. Unlicensed work is only permitted for non-friable ACM under 10 square metres.
Are these asbestos SWMS valid in all Australian states and territories?
Yes. These SWMS are written against the model WHS Regulation 2025 and Safe Work Australia model Codes of Practice, which have been adopted in NSW, QLD, ACT, NT, TAS, SA, and WA. Victoria operates under the OHS Act 2004 and OHS Regulations 2017 with equivalent asbestos provisions in Part 4.4. The templates include editable jurisdiction fields so users can reference their state regulator (SafeWork NSW, WorkSafe VIC, Workplace Health and Safety QLD, etc.) and applicable licensing authority.
What air monitoring and clearance is required after asbestos removal?
Under the How to Safely Remove Asbestos Code of Practice, control air monitoring is mandatory for all Class A friable removal and recommended for Class B work in occupied areas. A licensed asbestos assessor must conduct clearance inspections for Class A work and issue a clearance certificate before re-occupation. Sampling and analysis must follow AS 4964 and the NOHSC Guidance Note on Membrane Filter Method. Results must be retained for the duration of the work and provided to the PCBU and any affected workers.
Asbestos Management & Removal SWMS
Editable DOCX templates, 8 state variants per product, CIH-reviewed.
Browse all SWMS