OH Consultant
πŸ—οΈ

Site Safety Management Plan Template

Ready-to-complete site safety management plan for construction work below the value at which a principal contractor’s WHS management plan is mandatory: legal requirements table, roles, induction and licences, consultation, risk management, high risk construction work and SWMS, controls for twelve common hazards, site rules and public protection, emergency plan, incident reporting, subcontractor management, inspections and review, with a pre-filled hazard register and seven site forms.

βš–οΈWHS Regulation 2025 & Codes of Practice β€” legally binding from 1 July 2026 (s26A)
πŸ‘·Reviewed by certified occupational health and safety professionals
πŸ—ΊοΈState-specific variants for all 8 Australian jurisdictions
$399 AUDβœ“ Instant Download Available

SWMS variants reference your state’s WHS legislation. Instant download after payment.

A principal contractor's WHS management plan is only mandatory on a construction project worth $250,000 or more (WHS Regulation 2025 (NSW) s292 and s309). Most renovations, extensions, fit-outs and small civil jobs fall below that, yet the duties that matter still apply to them: managing construction risks, a SWMS for every high risk construction work activity, induction, a secure site and an emergency plan. This template is the written plan for those jobs, ready to complete. It opens with a table that maps each legal requirement to the section that meets it, then covers the project, named responsibilities, induction and licences, consultation, the risk rating method, high risk construction work and SWMS, controls for twelve common hazards, site rules and public protection, the emergency plan, incident reporting, subcontractor management and inspections. A hazard register pre-filled with fifteen hazards and seven site forms are included. It is a site safety plan for a builder or contractor in control of a small job. It is not a SWMS, and it does not replace the SWMS required for high risk construction work.

Hazards identified

10 hazards covered, sorted by priority.

Fall from a roof, scaffold or ladder, or through an uncovered voidHIGH

Death or permanent injury; falls are the leading cause of death on small residential jobs

Contact with overhead power lines or underground services during excavation or deliveriesHIGH

Electrocution, gas release or flooding

Collapse of an unsupported trench or excavationHIGH

Burial and crush injuries

A subcontractor starts high risk construction work with no SWMS, or a generic one nobody has readHIGH

Uncontrolled risk and a breach by both the subcontractor and the business in control of the site

Workers or delivery drivers on site who were never inductedHIGH

People unaware of no-go areas, asbestos locations and the emergency procedure

Asbestos disturbed during renovation of a building built before 2004HIGH

Fibre exposure for workers and occupants; stop-work and decontamination

Dry cutting or grinding of concrete, brick, tile or fibre cementMEDIUM

Silica dust exposure; silicosis and lung cancer

Unsecured site entered by children or the public after hoursMEDIUM

Injury to a member of the public in an excavation or on a scaffold

Occupants living or working in the building while work goes onMEDIUM

Exposure to dust, noise, falling objects and plant movements

A serious incident with no emergency contacts posted and nobody sure who notifies the regulatorMEDIUM

Delayed treatment and a failure to notify a notifiable incident

Control measures

Hierarchy-of-controls order: elimination β†’ substitution β†’ isolation β†’ engineering β†’ administrative β†’ PPE.

  1. 1Legal requirements table mapping each duty in the Act and Regulation to the section of the plan that meets it
  2. 2Project description and a responsibilities table with named people: business owner, site supervisor, subcontractors, workers, first aider and client
  3. 3Induction, training and licence requirements, including the general construction induction card and high risk work licences
  4. 4Consultation and communication arrangements: daily pre-start, weekly toolbox talk and coordination between trades
  5. 5Risk management procedure with the hierarchy of control and a risk rating matrix with required actions
  6. 6High risk construction work checklist of all 18 categories and the rules for preparing, reviewing, following and keeping SWMS
  7. 7Controls for twelve common hazards: falls, electricity, excavation and services, mobile plant, silica dust, manual handling, noise, chemicals, asbestos, hot work, weather and housekeeping
  8. 8Site rules, security, signage, PPE, amenities and protection of occupants and the public
  9. 9Emergency plan and first aid, with a contacts table and a six-step emergency procedure
  10. 10Incident reporting and investigation, including notifiable incidents and preserving the site
  11. 11Subcontractor management: insurances, licences and SWMS collected before start, induction and monitoring
  12. 12Inspection schedule, review triggers, review log and sign-off
  13. 13Hazard and risk register pre-filled with fifteen hazards and controls for small construction jobs
  14. 14Seven site forms: SWMS register, subcontractor register, induction checklist and register, toolbox talk record, incident report, emergency contacts poster and weekly site inspection

Applicable Codes of Practice

Code of Practice: Construction Workβš– Legally binding Β· 1 Jul 2026

Managing construction risks, SWMS, induction, and the content of a WHS management plan that this plan follows.

Code of Practice: Managing the Risk of Falls at Workplacesβš– Legally binding Β· 1 Jul 2026

The order of fall controls used in the plan.

Code of Practice: Excavation Workβš– Legally binding Β· 1 Jul 2026

Underground services information, trench support and barricading.

Code of Practice: How to Manage Work Health and Safety Risksβš– Legally binding Β· 1 Jul 2026

The risk management process and the hierarchy of control.

Code of Practice: Work Health and Safety Consultation, Cooperation and Coordinationβš– Legally binding Β· 1 Jul 2026

Consulting workers and coordinating between the trades on site.

Who this is for

  • β†’Builders and renovators running jobs under $250,000 (under $350,000 in Victoria)
  • β†’Trade contractors in control of their own small site: extensions, bathrooms and kitchens, decks, sheds, driveways and retaining walls
  • β†’Shopfitters and commercial fit-out contractors working in occupied premises
  • β†’Small civil and landscaping contractors
  • β†’Contractors asked by a client, body corporate, council or insurer for a site safety plan

What you receive

  • βœ“Fully editable Microsoft Word (DOCX) site safety management plan, about 4,000 words, with bracketed fields for your project, people and dates
  • βœ“Fourteen sections, from purpose and legal status to sign-off
  • βœ“A legal requirements table for the state you choose, citing its own Act, regulation and regulator
  • βœ“Risk rating matrix and the hierarchy of control
  • βœ“High risk construction work checklist and SWMS rules
  • βœ“Controls for twelve common construction hazards, to keep or delete as they apply
  • βœ“Emergency plan with the regulator's notification number for your state
  • βœ“Appendix A: hazard and risk register, pre-filled with fifteen hazards
  • βœ“Appendices B to D: SWMS register, subcontractor register, induction checklist and register
  • βœ“Appendices E to H: toolbox talk record, incident report, emergency contacts poster and weekly site inspection checklist

Worked example

A builder took on a $180,000 rear extension to an occupied 1960s house. Because the job was under $250,000 no WHS management plan was required, and none was written. The excavation subcontractor arrived without services plans, the roofer's SWMS was never asked for, and eaves lining that turned out to contain asbestos was pulled down with the family at home. With a completed plan, the supervisor would have collected the SWMS and insurances before each trade started, obtained the services information before digging, and checked the asbestos question in the project description before any demolition.

Related legislation

  • Work Health and Safety Act 2011 (NSW) β€” s19 primary duty of care; ss38 and 39 notifiable incidents; ss46 to 49 consultation
  • Work Health and Safety Regulation 2025 (NSW) β€” s291 high risk construction work; s292 construction project ($250,000 or more); s297 management of risks associated with construction work
  • Work Health and Safety Regulation 2025 (NSW) β€” s298 security of workplace; ss299 to 303 safe work method statements
  • Work Health and Safety Regulation 2025 (NSW) β€” s304 underground essential services information; s309 WHS management plan; ss316 and 317 general construction induction training
  • Work Health and Safety Regulation 2025 (NSW) β€” ss40 to 43 facilities, first aid and emergency plans; ss78 to 80 falls
  • Victoria: Occupational Health and Safety Regulations 2017 (Vic) β€” Part 5.1 Construction (the Victorian edition is written against these, with the $350,000 threshold)

Frequently asked questions

Is a site safety management plan required for a job under $250,000?

The regulation requires a principal contractor's WHS management plan only for construction projects of $250,000 or more. Below that there is no duty to hold a document by that name, but the duties to manage construction risks, obtain SWMS for high risk construction work, induct workers, secure the site and plan for emergencies all still apply. This plan is how a small job records that those duties are being met, and it is what clients, councils and insurers usually ask to see.

Does this replace a SWMS?

No. A SWMS is required for each high risk construction work activity regardless of the value of the job. This plan sets the rules for the whole site and includes a register of the SWMS that apply; the SWMS themselves are separate documents.

What if my project goes over $250,000?

The project then needs a principal contractor and a WHS management plan with the content the regulation prescribes. This template follows that content, so it is a sound starting point, but check it against the regulation and the Construction Work code of practice before relying on it for a project at or above the threshold.

Is the threshold the same in Victoria?

No. In Victoria a principal contractor must prepare a health and safety coordination plan for construction projects of $350,000 or more. The Victorian edition of this template is written against the Occupational Health and Safety Act 2004 and the OHS Regulations 2017 and uses that threshold.

Which state versions are available?

All eight: NSW, VIC, QLD, SA, WA, TAS, NT and ACT. Each cites that jurisdiction's Act, regulation and regulator and carries the regulator's incident notification number.

How long does it take to complete?

For a typical small job, one to two hours: the project details and names, a walk of the site to complete the hazard register, the high risk construction work checklist and the emergency details. The procedures are already written and only need changing where your job differs.

What's in this SWMS

Document details

Regulation
Work Health and Safety Regulation 2025 (NSW), s. 297 β€” Management of risks associated with construction work; s. 299 β€” Safe work method statement required for high risk construction work
Hazards Identified
10 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment
CIH-reviewed SWMS Β· from $99 Β· instant download

Related SWMS templates

☣️Asbestos Management Plan Template SWMS

Ready-to-complete written asbestos management plan for a workplace where asbestos has been identified or is as…

$299 AUDBuy β†’

πŸ“˜WHS Management System Manual SWMS

Ready-to-implement WHS management system manual for a small or medium business, structured to ISO 45001:2018: …

$499 AUDBuy β†’

πŸ“‹Plumbing JSA

A complete, editable JSA for plumbing tasks, breaking the job into eight sequential steps with pre-filled haza…

$99 AUDBuy β†’

πŸ“‹Concreting JSA

This template breaks a complete concreting task into its real work sequence β€” pre-pour planning, formwork and …

$99 AUDBuy β†’

πŸ”§AWTS / On-Site Sewage Management System Install SWMS

A Safe Work Method Statement for awts / on-site sewage management system install covering all key hazards, con…

$149 AUDBuy β†’

πŸ”§Cathodic Protection β€” Buried Plumbing Mains SWMS

A Safe Work Method Statement for cathodic protection β€” buried plumbing mains covering all key hazards, control…

$149 AUDBuy β†’