OH Consultant
← All SWMS Documents
πŸ”§

Drain Re-lining (CIPP) SWMS

CIPP (cured-in-place pipe) re-lining of drainage and sewer lines covers steam and UV-cured liner installation, resin handling, confined-space access for inversion and pull-in-place methods, and trenchless rehabilitation of stormwater and sewer mains.

βš–οΈWHS Regulation 2025 & Codes of Practice β€” legally binding from 1 July 2026 (s26A)
πŸ‘·Reviewed by certified occupational health and safety professionals
πŸ—ΊοΈState-specific variants for all 8 Australian jurisdictions
$99 AUDβœ“ Instant Download Available

SWMS variants reference your state’s WHS legislation. Instant download after payment.

Drain relining by cured-in-place pipe (CIPP) covers the trenchless rehabilitation of drains and sewers by installing a resin-impregnated liner inside the existing pipe and curing it in place to form a new pipe within the old β€” repairing a defective drain without excavation. It avoids the trench hazards of dig-and-replace, but introduces the chemical hazards of the liner resins, the curing process, the biological hazards of the existing drain, and the potential for confined space entry. This document is written on the basis that CIPP relining is carried out by competent operators with the chemical, curing, biological and confined-space hazards controlled, and the resin system used to the manufacturer's safety requirements.

Drain relining by CIPP is trenchless rehabilitation carried out in connection with AS/NZS 3500.2, using a cured-in-place liner system. The resins and chemicals are hazardous chemicals managed under the hazardous-chemicals provisions of the WHS Regulations, with safety data sheets and exposure controls, and the curing process β€” heat, steam, hot water or ultraviolet β€” brings thermal or radiation hazards. Access to maintenance holes is a confined space hazard. This document coordinates the chemical, curing, biological and confined-space controls so the drain is relined without exposure or injury.

Hazards identified

9 hazards covered, sorted by priority.

Exposure to liner resins and chemicalsHIGH

Skin, eye and respiratory irritation and sensitisation from resin and chemical contact

Vapours and emissions from the resin and curing processHIGH

Inhalation exposure to chemical vapours and styrene or other emissions

Thermal hazards from heat, steam or hot-water curingHIGH

Burns and scalding from the heat or steam used to cure the liner

Ultraviolet radiation from UV curing systemsHIGH

Eye and skin injury from ultraviolet light where UV curing is used

Biological hazards from the existing drainHIGH

Infection from contact with sewage in the drain being relined

Entry into maintenance holes or pitsHIGH

Oxygen deficiency, contaminated atmosphere and restricted egress where entry is required

Pressure used to install and inflate the linerMEDIUM

Pressure release and equipment failure during liner installation

Spill or uncontrolled release of resin and chemicalsMEDIUM

Environmental and exposure hazard from a resin spill

Manual handling of liners and equipmentMEDIUM

Musculoskeletal injury from heavy liners and equipment

Control measures

Hierarchy-of-controls order: elimination β†’ substitution β†’ isolation β†’ engineering β†’ administrative β†’ PPE.

  1. 1Administrative: manage the liner resins and chemicals as hazardous chemicals β€” obtain and follow the safety data sheets, assess exposure, and apply the manufacturer's safety requirements for handling, mixing and curing.
  2. 2Engineering: control vapours and emissions with ventilation at the work area and access points, particularly during mixing, installation and curing.
  3. 3Engineering: control the curing-process hazard for the method used β€” guard against the heat, steam and hot water of thermal curing, or against ultraviolet exposure for UV curing β€” and keep workers clear of the hazard during curing.
  4. 4PPE: chemical-resistant gloves and protective clothing, eye and face protection, and respiratory protection appropriate to the resin and vapours, with UV-protective equipment where UV curing is used, per the safety data sheet and AS/NZS 1715 and AS/NZS 1716.
  5. 5Administrative: manage the biological hazard of the existing drain with hygiene controls, washing facilities and decontamination, and prohibition of eating, drinking and smoking until decontaminated.
  6. 6Administrative: where access to a maintenance hole or pit is required, apply the confined space entry permit, atmospheric testing, ventilation, standby and rescue controls to the confined spaces Code of Practice.
  7. 7Administrative: control resin spills with containment and spill response, manage the pressure used to install and inflate the liner, and dispose of resin and chemical waste in line with the requirements.
  8. 8Administrative: ensure the work is carried out and certified by an appropriately licensed plumber or drainer under the relevant state or territory plumbing licensing scheme, with the relevant competencies and a compliance certificate issued where required.
  9. 9Administrative: all workers must hold a valid White Card (General Construction Induction Training, CPCCWHS1001) before entering any construction workplace, with the plumbing, excavation, confined space and any other competencies and licences required for the work.
  10. 10Administrative: conduct a daily pre-start toolbox talk covering the day's work, identified hazards, isolations, required PPE and emergency procedures, and record attendance in the consultation section.
  11. 11Administrative: consult workers and any health and safety representatives on the work and its risks, record the consultation, and keep this document available at the workplace.
  12. 12PPE: eye protection to AS/NZS 1337.1, hearing protection where required, gloves appropriate to the task, high-visibility clothing, and Class I or Class II safety footwear with protective toecap to AS/NZS 2210.3.
  13. 13Administrative: review and update this SWMS whenever the work scope changes, after any incident or near miss, when a worker or health and safety representative raises a concern, when new hazards are identified, or at minimum every 12 months.

Applicable Codes of Practice

AS/NZS 3500.2 β€” Plumbing and drainage Part 2: Sanitary plumbing and drainageβš– Legally binding Β· 1 Jul 2026

The sanitary plumbing and drainage standard for the drain being rehabilitated by relining.

Code of Practice: Managing risks of hazardous chemicals in the workplaceβš– Legally binding Β· 1 Jul 2026

The management of the liner resins and chemicals as hazardous chemicals, including safety data sheets and exposure controls.

Code of Practice: Confined spacesβš– Legally binding Β· 1 Jul 2026

Atmospheric testing, ventilation, entry permit and rescue controls where the work involves entry into a confined space.

AS/NZS 1715 and AS/NZS 1716 β€” Respiratory protective equipment

Selection, fit testing and use of respiratory protection where dust, fumes or atmospheric hazards require it for the work.

Code of Practice: How to manage work health and safety risksβš– Legally binding Β· 1 Jul 2026

The risk management process and hierarchy of controls applied to the hazards of the work.

High-Risk Construction Work triggered

9
Work carried out in or near a confined space

Where CIPP drain relining requires entry into a maintenance hole or pit that may have a contaminated atmosphere, the work is high risk construction work requiring a SWMS before the work commences.

Legal consequence

This is licensed plumbing, drainage or specialist work that, in the circumstances described, is high risk construction work β€” in or near a confined space β€” so a SWMS must be prepared before the work commences, kept readily accessible, reviewed as necessary, and given to the principal contractor if one is appointed. The work is carried out to the relevant AS/NZS 3500 plumbing and drainage standards, the excavation, confined space and pressure-equipment requirements, and the relevant utility requirements, which are called up by the relevant legislation, with the excavation, confined-space, electrical, pressurised-pipe or work-at-height controls applied as relevant. A failure in this work can cause burial, an atmospheric incident, a service strike, a loss of containment or serious injury, and breaches of the relevant legislation and the primary duty of care under the model WHS Act are actively enforced, with offence categories running from failure-to-comply through to reckless conduct, and the most serious breaches carrying imprisonment for individuals. Body-corporate maxima are substantial and indexed; the current maximum follows the prevailing schedule of the responsible regulator.

Who this is for

  • β†’Competent operators carrying out CIPP drain relining.
  • β†’Trenchless rehabilitation crews installing cured-in-place liners.
  • β†’Plumbing and drainage businesses providing drain relining.
  • β†’Asset owners and PCBUs commissioning trenchless drain rehabilitation.
  • β†’PCBU safety managers and supervisors coordinating the chemical, curing and confined-space controls.

What you receive

  • βœ“Editable Microsoft Word document (.docx) fully compatible with Microsoft Word 2016 and newer, Google Docs, and LibreOffice Writer.
  • βœ“Title page with editable fields for PCBU name, ABN, site address, project name, principal contractor details, and document revision date.
  • βœ“Hazard register with the drain relining (cured-in-place pipe) hazards β€” each with a documented consequence, inherent risk rating on a 5x5 likelihood-consequence matrix, hierarchy-of-control measures, and residual risk rating.
  • βœ“CIPP relining prompts referencing the cured-in-place liner system and AS/NZS 3500.2, a hazardous-chemicals and safety-data-sheet section, a curing-process control section for the method used, and a biological-hazard and confined-space section.
  • βœ“Licensing, competency and permit prompts for the relevant plumbing, excavation, confined space and specialist work, and a respiratory protection selection and fit-test record per AS/NZS 1715 where relevant.
  • βœ“Worker consultation record per the model WHS Act consultation duty and a worker sign-on register (blank, expandable).
  • βœ“Applicable legislation and Codes of Practice schedule pre-populated for the model WHS jurisdiction with a state-variance reference table covering the harmonised states, plus Victoria.
  • βœ“Emergency procedure template and a revision log.

Worked example

A trenchless rehabilitation crew is engaged to reline a defective drain by cured-in-place pipe. The liner resins and chemicals are managed as hazardous chemicals, with the safety data sheets obtained and the manufacturer's safety requirements followed for handling, mixing and curing. Ventilation is set up at the work area and access points to control vapours and emissions during mixing, installation and curing. The curing method is UV curing, so the ultraviolet exposure hazard is controlled, workers kept clear, and UV-protective equipment used. Operators wear chemical-resistant gloves and protective clothing, eye and face protection, and respiratory protection appropriate to the resin and vapours. The biological hazard of the existing drain is managed with hygiene controls, washing facilities and decontamination. The work is carried out from the surface where possible; where access to a maintenance hole is required, the confined space controls apply. Resin containers are managed against spill, and the pressure used to install and inflate the liner managed. The drain is relined, decontaminated, and the records retained.

Related legislation

  • Model Work Health and Safety Act β€” primary duty of care; the duty to consult workers; the reckless-conduct offence; and notifiable-incident provisions, as enacted in each jurisdiction.
  • Model Work Health and Safety Regulations β€” Section 291 high risk construction work and the SWMS preparation and review duties, and the excavation, confined space and pressurised-pipe provisions where applicable, as enacted in each jurisdiction.
  • The relevant plumbing and drainage standards AS/NZS 3500 (Parts 0–5), the excavation and confined space Codes of Practice, the pressure equipment and pipework standards, and the silica Code of Practice where cutting concrete, are called up by the relevant legislation, together with the Before You Dig Australia information and the relevant utility requirements.
  • Plumbing and drainage work is licensed under each state and territory's plumbing licensing scheme, with the relevant competencies for excavation, confined space and specialist work, and compliance certification required for notifiable work; electrical work is carried out by a licensed electrician.
  • Victoria operates under the Occupational Health and Safety Act 2004 and the Occupational Health and Safety Regulations 2017, with the high risk construction work, excavation and confined space provisions applying in place of the model instruments.

Frequently asked questions

What is CIPP drain relining?

CIPP (cured-in-place pipe) drain relining is a trenchless method of rehabilitating a defective drain or sewer by installing a resin-impregnated liner inside the existing pipe and curing it in place to form a new pipe within the old. It repairs the drain without excavation, avoiding the trench hazards of dig-and-replace, but introduces chemical, curing and biological hazards that are controlled.

What chemical hazards apply to CIPP relining?

The liner resins and chemicals can be irritant, sensitising or hazardous, and the resin and curing process can release vapours and emissions such as styrene. They are managed as hazardous chemicals with safety data sheets, exposure controls, ventilation, and chemical-resistant gloves, protective clothing and respiratory protection, following the manufacturer's safety requirements.

What are the curing hazards?

Curing forms the liner and may use heat, steam, hot water or ultraviolet light depending on the system. Thermal curing brings burn and scalding hazards, and UV curing brings eye and skin injury from ultraviolet light. The curing-process hazard is controlled for the method used, with workers kept clear and UV-protective equipment where UV curing is used.

Does CIPP relining involve confined spaces?

It can, where access to a maintenance hole or pit is required during the work. In those cases the confined space entry permit, atmospheric testing, ventilation, standby and rescue controls apply, and the work is high risk construction work requiring a SWMS. The trenchless method itself avoids excavation, and the work is carried out from the surface where possible.

What biological hazards apply?

The existing drain being relined contains sewage and contaminated water, so contact carries infection risk. Hygiene controls, washing facilities, decontamination, and prohibition of eating, drinking and smoking until decontaminated manage that hazard, alongside the chemical and curing controls, so the work is carried out without biological or chemical exposure.

What's in this SWMS

Document details

Regulation
WHS Regulation 2025, Schedule 1 β€” High Risk Construction Work
HRCW Category
Work in or near a confined space; Use of hazardous chemicals (epoxy resin)
Hazards Identified
9 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment