OH Consultant
← All SWMS Documents
🎨

Wallpaper Hanging & Removal SWMS

NSW β€” Wallpaper Hanging & Removal. Full task scope, hazards and controls to be authored to Phase 1 standard.

βš–οΈWHS Regulation 2025 & Codes of Practice β€” legally binding from 1 July 2026 (s26A)
πŸ‘·Reviewed by certified occupational health and safety professionals
πŸ—ΊοΈState-specific variants for all 8 Australian jurisdictions
$149 AUDβœ“ Instant Download Available

SWMS variants reference your state’s WHS legislation. Instant download after payment.

Wallpaper hanging and removal involves surface preparation, stripping of existing wall coverings using steamers, chemical strippers or scoring tools, application of sizing and adhesives, and hanging of new material on internal walls and ceilings. Work is typically performed from stepladders, trestles or mobile scaffolds in occupied residential, commercial and heritage buildings. The task exposes workers to falls from height when accessing upper walls and ceilings, scalding from wallpaper steamers, chemical burns and respiratory irritation from strippers and adhesives, and β€” critically in pre-1990 buildings β€” the potential disturbance of asbestos-containing wall linings, textured ceiling coatings or backing papers.

Under the Work Health and Safety Regulation 2025 (NSW), section 291 defines high risk construction work, and this scope triggers category (a) work carried out where there is a risk of a person falling more than 2 metres and category (d) work likely to involve the disturbance of asbestos. Section 299 requires a Safe Work Method Statement to be prepared before the work commences. Controls follow the hierarchy in section 36 β€” eliminate where feasible, otherwise substitute, isolate or engineer, then apply administrative controls and PPE.

Hazards identified

12 hazards covered, sorted by priority.

Disturbance of asbestos-containing wall linings, backing papers or textured ceiling coatings in pre-1990 structuresHIGH

Inhalation of respirable asbestos fibres causing mesothelioma, asbestosis and lung cancer

Falls from stepladders, trestles or mobile scaffolds while hanging or stripping paper above 2 mHIGH

Fractures, head injury or fatality from fall to lower level

Contact with live electrical fittings, switches and concealed wiring when stripping paper with wet methodsHIGH

Electric shock, electrocution or arc flash burns

Scalding from wallpaper steamer plates, hoses and condensateHIGH

First and second degree burns to hands, arms and face

Exposure to solvents and hazardous chemicals in wallpaper strippers, adhesives, primers and sizingHIGH

Dermatitis, chemical burns, respiratory sensitisation and CNS effects

Respirable crystalline silica dust when sanding or making good plaster or render substratesHIGH

Silicosis, chronic obstructive pulmonary disease and lung cancer

Lead-based paint disturbance when scoring or sanding pre-1970 painted walls prior to paperingMEDIUM

Lead absorption causing neurological and haematological effects

Manual handling of long rolls, paste buckets, steamers and pasting tablesMEDIUM

Musculoskeletal injury to back, shoulders and wrists

Slips on wet paste, water and stripped paper debris on floor surfacesMEDIUM

Sprains, fractures and head injury from same-level falls

Sharp cuts from trimming knives, scoring wheels and snap-off bladesMEDIUM

Lacerations, tendon and nerve damage to hands

Mould and bacterial contamination behind existing wallpaper in damp areasMEDIUM

Respiratory irritation, allergic reactions and infection

Poor lighting and awkward postures in stairwells and confined room cornersLOW

Eye strain, trips and cumulative musculoskeletal disorders

Control measures

Hierarchy-of-controls order: elimination β†’ substitution β†’ isolation β†’ engineering β†’ administrative β†’ PPE.

  1. 1ELIMINATE: Where an asbestos register or pre-1990 building history indicates suspect materials, do not disturb the substrate β€” engage a Class A or Class B licensed asbestos removalist to clear the wall before wallpaper work commences, in accordance with WHS Regulation 2025 (NSW) Chapter 8 and the Code of Practice: How to Manage and Control Asbestos in the Workplace.
  2. 2SUBSTITUTE: Use low-VOC, solvent-free wallpaper pastes, strippers and primers labelled to the GHS 7 classification and Safety Data Sheets prepared under WHS Regulation 2025 (NSW) sections 330 and 335, in preference to solvent-based products.
  3. 3ISOLATE: De-energise and lock out the local circuit at the switchboard before wet stripping around switches, GPOs and light fittings; test dead with a licensed electrician where required under AS/NZS 3000:2018 Electrical Installations.
  4. 4ENGINEER: Access walls above 2 m from a mobile scaffold erected and inspected in accordance with AS/NZS 1576.1:2019 and AS/NZS 1576.3:2015, or use industrial platform stepladders complying with AS/NZS 1892.1:2018 rated for the load β€” never use domestic ladders.
  5. 5ENGINEER: Fit wallpaper steamers with insulated plates, drip-guards and thermostatic cut-outs; inspect hoses and pressure vessels before each use and tag out defective units.
  6. 6ENGINEER: Use HEPA-filtered H-class vacuums complying with AS/NZS 60335.2.69:2017 to control dust from any sanding or making-good of substrates, and dampen surfaces before stripping to suppress fibres and dust.
  7. 7ADMINISTRATIVE: Conduct pre-work asbestos identification β€” review the site asbestos register (WHS Reg 2025 s425) and, for buildings pre-1990 with unknown materials, arrange sampling by a licensed asbestos assessor before scoring, wetting or removing wall linings.
  8. 8ADMINISTRATIVE: Establish a hazardous chemicals register and provide SDS at the work area; ventilate rooms with mechanical extraction when using strippers, and prohibit ignition sources near flammable solvents.
  9. 9ADMINISTRATIVE: Implement a 3-point contact rule on ladders, restrict work to below shoulder height, and prohibit standing on the top two rungs; a second worker foots the ladder on smooth floors.
  10. 10PPE: Provide chemical-resistant nitrile gloves (AS/NZS 2161.10.1:2020), safety eyewear (AS/NZS 1337.1:2010), P2 disposable respirators (AS/NZS 1716:2012) when sanding or handling strippers, and heat-resistant gauntlets when operating steamers.
  11. 11PPE (asbestos contingency): If suspected asbestos is encountered mid-task, stop work immediately, isolate the area, notify the PCBU, and do not resume until a licensed removalist has cleared the material and a clearance certificate is issued under WHS Regulation 2025 (NSW) section 474.
  12. 12VERIFICATION: All workers hold a current White Card (CPCCWHS1001); the SWMS is developed in consultation with workers under WHS Act 2011 (NSW) section 47, signed on before commencement, and reviewed under WHS Regulation 2025 (NSW) section 302 whenever controls change, an incident occurs, or a new hazard is identified.

Applicable Codes of Practice

Code of Practice: Managing the Risk of Falls at Workplaces (SafeWork NSW)βš– Legally binding Β· 1 Jul 2026

Approved Code providing practical guidance on fall prevention for work above 2 m, including ladder, trestle and scaffold selection for interior finishing work.

Code of Practice: How to Manage and Control Asbestos in the Workplace (SafeWork NSW)βš– Legally binding Β· 1 Jul 2026

Approved Code setting out identification, sampling, control and licensing requirements where wallpaper removal may disturb asbestos-containing linings or backing.

Code of Practice: Managing Risks of Hazardous Chemicals in the Workplace (SafeWork NSW)βš– Legally binding Β· 1 Jul 2026

Approved Code governing storage, labelling, SDS access and exposure control for wallpaper strippers, adhesives, primers and solvents.

AS/NZS 1892.1:2018 Portable ladders β€” Performance and geometric requirements

Specifies design and load rating requirements for industrial stepladders and extension ladders used to access upper walls and ceilings.

High-Risk Construction Work triggered

s291(a)
Involves a risk of a person falling more than 2 metres

Hanging and stripping wallpaper on standard 2.4 m and higher walls, stairwells and ceilings routinely requires workers to operate from stepladders, trestles or mobile scaffolds where a fall to the lower level would exceed 2 metres.

s291(d)
Involves, or is likely to involve, the disturbance of asbestos

In buildings constructed or refurbished before 1990, wallpaper substrates may include asbestos-containing fibre-cement sheeting, textured coatings or backing papers; scoring, wet stripping and steam removal can release respirable fibres.

Legal consequence

Because this work is HRCW under section 291, a SWMS complying with section 299 must be prepared before work commences, kept accessible on site, and reviewed under section 302 when controls change or an incident occurs. Failure to prepare, follow or review a SWMS is an offence. Where non-compliance exposes a worker to a risk of death or serious injury, prosecution may proceed as a Category 2 offence under section 32 of the Work Health and Safety Act 2011 (NSW), or a Category 1 offence under section 31 where reckless conduct is established. Current penalty amounts are set out in the SafeWork NSW penalty schedule and are indexed periodically.

Who this is for

  • β†’Painting and decorating contractors offering wallpaper hanging and removal services
  • β†’Interior fit-out companies working in residential and commercial refurbishments
  • β†’Sole trader wallpaperers and paperhangers subcontracted to builders
  • β†’Heritage restoration trades working in pre-1990 buildings
  • β†’Property maintenance PCBUs delivering strata and hotel refurbishment

What you receive

  • βœ“Editable SWMS in Microsoft Word and PDF formats aligned to WHS Regulation 2025 (NSW) section 299
  • βœ“Full hazard and control register covering falls, asbestos, chemicals, electrical and manual handling
  • βœ“HRCW declaration referencing section 291(a) and 291(d)
  • βœ“Pre-start asbestos identification checklist for pre-1990 substrates
  • βœ“Sign-on register for worker consultation under WHS Act 2011 (NSW) section 47
  • βœ“Plant and equipment register for steamers, ladders, scaffolds and hand tools
  • βœ“PPE schedule referencing current AS/NZS standards
  • βœ“Emergency response and first aid procedures including scald and chemical exposure
  • βœ“SWMS review log to evidence section 302 reviews

Worked example

A two-person painting crew is engaged to strip and re-hang wallpaper in a 1960s semi-detached residence in Marrickville prior to sale. The scope covers three bedrooms and a hallway with 2.7 m ceilings. Because the building predates 1990, the PCBU obtains the vendor's asbestos report; the report identifies AC sheet in the hallway walls behind the existing paper. Work in the hallway is paused and a Class B licensed removalist is engaged to remove the AC sheeting and issue a clearance certificate before papering resumes. In the bedrooms, workers use a low-VOC stripper and steamer from an industrial platform stepladder rated to 150 kg. Circuits are isolated at the switchboard before wet stripping around GPOs. The SWMS is signed on by both workers, the register is kept in the site folder, and a review is triggered when the removalist's clearance is issued and the scope resumes.

Related legislation

  • Work Health and Safety Act 2011 (NSW)
  • Work Health and Safety Regulation 2025 (NSW)
  • Protection of the Environment Operations Act 1997 (NSW) β€” asbestos and chemical waste disposal
  • Electricity Supply Act 1995 (NSW) and AS/NZS 3000:2018 β€” electrical isolation obligations
  • Poisons and Therapeutic Goods Act 1966 (NSW) β€” labelling of scheduled chemicals
  • Dangerous Goods (Road and Rail Transport) Act 2008 (NSW) β€” transport of flammable solvents

Frequently asked questions

Is a SWMS mandatory for wallpapering if the ceilings are only 2.4 m high?

Yes. A fall from the top platform of a stepladder to the floor at a 2.4 m ceiling exceeds 2 metres, triggering section 291(a) of the WHS Regulation 2025 (NSW). A SWMS is required under section 299 before work commences.

What if the building was built after 1990 β€” do I still need to address asbestos?

Buildings constructed after 31 December 2003 are generally not expected to contain asbestos. For structures between 1990 and 2003, review the asbestos register under WHS Regulation 2025 (NSW) section 425 before disturbing linings. If the register is absent or unclear, arrange sampling by a licensed asbestos assessor.

Can I use a domestic ladder from a hardware store for wallpaper hanging?

No. Ladders used in the course of work must comply with the industrial rating requirements of AS/NZS 1892.1:2018. Domestic-rated ladders (typically 100 kg) are not permitted for commercial paperhanging.

Who must sign the SWMS?

The SWMS must be developed in consultation with workers under section 47 of the WHS Act 2011 (NSW) and signed by each worker performing the HRCW before they commence. The PCBU or supervisor also signs, and the document is kept on site and reviewed under section 302 whenever controls change or an incident occurs.

What's in this SWMS

Document details

Regulation
Work Health and Safety Regulation 2025 (NSW), Section 291 β€” High Risk Construction Work
HRCW Category
s. 291(a) β€” Risk of fall greater than 2 metres; s. 291(d) β€” Likely to involve disturbance of asbestos
Hazards Identified
12 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment
CIH-reviewed SWMS Β· from $99 Β· instant download

Related SWMS templates

☣️Synthetic Mineral Fibre Insulation Removal SWMS

NSW β€” Synthetic Mineral Fibre Insulation Removal. Full task scope, hazards and controls to be authored to Phas…

$149 AUDBuy β†’

⛏️Underground Tank Removal SWMS

NSW β€” Underground Tank Removal. Full task scope, hazards and controls to be authored to Phase 1 standard.

$249 AUDBuy β†’

🧱Acoustic Ceiling Tile Installation SWMS

NSW β€” Acoustic Ceiling Tile Installation. Full task scope, hazards and controls to be authored to Phase 1 stan…

$149 AUDBuy β†’

🏒Aluminium Composite Panel Installation SWMS

NSW β€” Aluminium Composite Panel Installation. Full task scope, hazards and controls to be authored to Phase 1 …

$199 AUDBuy β†’

🚧Artificial Turf Installation SWMS

NSW β€” Artificial Turf Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.

$99 AUDBuy β†’

☣️Asbestos Soil Remediation SWMS

NSW β€” Asbestos Soil Remediation. Full task scope, hazards and controls to be authored to Phase 1 standard.

$249 AUDBuy β†’