Wallpaper Hanging & Removal SWMS
NSW β Wallpaper Hanging & Removal. Full task scope, hazards and controls to be authored to Phase 1 standard.
SWMS variants reference your stateβs WHS legislation. Instant download after payment.
Wallpaper hanging and removal involves surface preparation, stripping of existing wall coverings using steamers, chemical strippers or scoring tools, application of sizing and adhesives, and hanging of new material on internal walls and ceilings. Work is typically performed from stepladders, trestles or mobile scaffolds in occupied residential, commercial and heritage buildings. The task exposes workers to falls from height when accessing upper walls and ceilings, scalding from wallpaper steamers, chemical burns and respiratory irritation from strippers and adhesives, and β critically in pre-1990 buildings β the potential disturbance of asbestos-containing wall linings, textured ceiling coatings or backing papers.
Under the Work Health and Safety Regulation 2025 (NSW), section 291 defines high risk construction work, and this scope triggers category (a) work carried out where there is a risk of a person falling more than 2 metres and category (d) work likely to involve the disturbance of asbestos. Section 299 requires a Safe Work Method Statement to be prepared before the work commences. Controls follow the hierarchy in section 36 β eliminate where feasible, otherwise substitute, isolate or engineer, then apply administrative controls and PPE.
Hazards identified
12 hazards covered, sorted by priority.
Inhalation of respirable asbestos fibres causing mesothelioma, asbestosis and lung cancer
Fractures, head injury or fatality from fall to lower level
Electric shock, electrocution or arc flash burns
First and second degree burns to hands, arms and face
Dermatitis, chemical burns, respiratory sensitisation and CNS effects
Silicosis, chronic obstructive pulmonary disease and lung cancer
Lead absorption causing neurological and haematological effects
Musculoskeletal injury to back, shoulders and wrists
Sprains, fractures and head injury from same-level falls
Lacerations, tendon and nerve damage to hands
Respiratory irritation, allergic reactions and infection
Eye strain, trips and cumulative musculoskeletal disorders
Control measures
Hierarchy-of-controls order: elimination β substitution β isolation β engineering β administrative β PPE.
- 1ELIMINATE: Where an asbestos register or pre-1990 building history indicates suspect materials, do not disturb the substrate β engage a Class A or Class B licensed asbestos removalist to clear the wall before wallpaper work commences, in accordance with WHS Regulation 2025 (NSW) Chapter 8 and the Code of Practice: How to Manage and Control Asbestos in the Workplace.
- 2SUBSTITUTE: Use low-VOC, solvent-free wallpaper pastes, strippers and primers labelled to the GHS 7 classification and Safety Data Sheets prepared under WHS Regulation 2025 (NSW) sections 330 and 335, in preference to solvent-based products.
- 3ISOLATE: De-energise and lock out the local circuit at the switchboard before wet stripping around switches, GPOs and light fittings; test dead with a licensed electrician where required under AS/NZS 3000:2018 Electrical Installations.
- 4ENGINEER: Access walls above 2 m from a mobile scaffold erected and inspected in accordance with AS/NZS 1576.1:2019 and AS/NZS 1576.3:2015, or use industrial platform stepladders complying with AS/NZS 1892.1:2018 rated for the load β never use domestic ladders.
- 5ENGINEER: Fit wallpaper steamers with insulated plates, drip-guards and thermostatic cut-outs; inspect hoses and pressure vessels before each use and tag out defective units.
- 6ENGINEER: Use HEPA-filtered H-class vacuums complying with AS/NZS 60335.2.69:2017 to control dust from any sanding or making-good of substrates, and dampen surfaces before stripping to suppress fibres and dust.
- 7ADMINISTRATIVE: Conduct pre-work asbestos identification β review the site asbestos register (WHS Reg 2025 s425) and, for buildings pre-1990 with unknown materials, arrange sampling by a licensed asbestos assessor before scoring, wetting or removing wall linings.
- 8ADMINISTRATIVE: Establish a hazardous chemicals register and provide SDS at the work area; ventilate rooms with mechanical extraction when using strippers, and prohibit ignition sources near flammable solvents.
- 9ADMINISTRATIVE: Implement a 3-point contact rule on ladders, restrict work to below shoulder height, and prohibit standing on the top two rungs; a second worker foots the ladder on smooth floors.
- 10PPE: Provide chemical-resistant nitrile gloves (AS/NZS 2161.10.1:2020), safety eyewear (AS/NZS 1337.1:2010), P2 disposable respirators (AS/NZS 1716:2012) when sanding or handling strippers, and heat-resistant gauntlets when operating steamers.
- 11PPE (asbestos contingency): If suspected asbestos is encountered mid-task, stop work immediately, isolate the area, notify the PCBU, and do not resume until a licensed removalist has cleared the material and a clearance certificate is issued under WHS Regulation 2025 (NSW) section 474.
- 12VERIFICATION: All workers hold a current White Card (CPCCWHS1001); the SWMS is developed in consultation with workers under WHS Act 2011 (NSW) section 47, signed on before commencement, and reviewed under WHS Regulation 2025 (NSW) section 302 whenever controls change, an incident occurs, or a new hazard is identified.
Applicable Codes of Practice
Approved Code providing practical guidance on fall prevention for work above 2 m, including ladder, trestle and scaffold selection for interior finishing work.
Approved Code setting out identification, sampling, control and licensing requirements where wallpaper removal may disturb asbestos-containing linings or backing.
Approved Code governing storage, labelling, SDS access and exposure control for wallpaper strippers, adhesives, primers and solvents.
Specifies design and load rating requirements for industrial stepladders and extension ladders used to access upper walls and ceilings.
High-Risk Construction Work triggered
Hanging and stripping wallpaper on standard 2.4 m and higher walls, stairwells and ceilings routinely requires workers to operate from stepladders, trestles or mobile scaffolds where a fall to the lower level would exceed 2 metres.
In buildings constructed or refurbished before 1990, wallpaper substrates may include asbestos-containing fibre-cement sheeting, textured coatings or backing papers; scoring, wet stripping and steam removal can release respirable fibres.
Because this work is HRCW under section 291, a SWMS complying with section 299 must be prepared before work commences, kept accessible on site, and reviewed under section 302 when controls change or an incident occurs. Failure to prepare, follow or review a SWMS is an offence. Where non-compliance exposes a worker to a risk of death or serious injury, prosecution may proceed as a Category 2 offence under section 32 of the Work Health and Safety Act 2011 (NSW), or a Category 1 offence under section 31 where reckless conduct is established. Current penalty amounts are set out in the SafeWork NSW penalty schedule and are indexed periodically.
Who this is for
- βPainting and decorating contractors offering wallpaper hanging and removal services
- βInterior fit-out companies working in residential and commercial refurbishments
- βSole trader wallpaperers and paperhangers subcontracted to builders
- βHeritage restoration trades working in pre-1990 buildings
- βProperty maintenance PCBUs delivering strata and hotel refurbishment
What you receive
- βEditable SWMS in Microsoft Word and PDF formats aligned to WHS Regulation 2025 (NSW) section 299
- βFull hazard and control register covering falls, asbestos, chemicals, electrical and manual handling
- βHRCW declaration referencing section 291(a) and 291(d)
- βPre-start asbestos identification checklist for pre-1990 substrates
- βSign-on register for worker consultation under WHS Act 2011 (NSW) section 47
- βPlant and equipment register for steamers, ladders, scaffolds and hand tools
- βPPE schedule referencing current AS/NZS standards
- βEmergency response and first aid procedures including scald and chemical exposure
- βSWMS review log to evidence section 302 reviews
Worked example
A two-person painting crew is engaged to strip and re-hang wallpaper in a 1960s semi-detached residence in Marrickville prior to sale. The scope covers three bedrooms and a hallway with 2.7 m ceilings. Because the building predates 1990, the PCBU obtains the vendor's asbestos report; the report identifies AC sheet in the hallway walls behind the existing paper. Work in the hallway is paused and a Class B licensed removalist is engaged to remove the AC sheeting and issue a clearance certificate before papering resumes. In the bedrooms, workers use a low-VOC stripper and steamer from an industrial platform stepladder rated to 150 kg. Circuits are isolated at the switchboard before wet stripping around GPOs. The SWMS is signed on by both workers, the register is kept in the site folder, and a review is triggered when the removalist's clearance is issued and the scope resumes.
Related legislation
- Work Health and Safety Act 2011 (NSW)
- Work Health and Safety Regulation 2025 (NSW)
- Protection of the Environment Operations Act 1997 (NSW) β asbestos and chemical waste disposal
- Electricity Supply Act 1995 (NSW) and AS/NZS 3000:2018 β electrical isolation obligations
- Poisons and Therapeutic Goods Act 1966 (NSW) β labelling of scheduled chemicals
- Dangerous Goods (Road and Rail Transport) Act 2008 (NSW) β transport of flammable solvents
Frequently asked questions
Is a SWMS mandatory for wallpapering if the ceilings are only 2.4 m high?
Yes. A fall from the top platform of a stepladder to the floor at a 2.4 m ceiling exceeds 2 metres, triggering section 291(a) of the WHS Regulation 2025 (NSW). A SWMS is required under section 299 before work commences.
What if the building was built after 1990 β do I still need to address asbestos?
Buildings constructed after 31 December 2003 are generally not expected to contain asbestos. For structures between 1990 and 2003, review the asbestos register under WHS Regulation 2025 (NSW) section 425 before disturbing linings. If the register is absent or unclear, arrange sampling by a licensed asbestos assessor.
Can I use a domestic ladder from a hardware store for wallpaper hanging?
No. Ladders used in the course of work must comply with the industrial rating requirements of AS/NZS 1892.1:2018. Domestic-rated ladders (typically 100 kg) are not permitted for commercial paperhanging.
Who must sign the SWMS?
The SWMS must be developed in consultation with workers under section 47 of the WHS Act 2011 (NSW) and signed by each worker performing the HRCW before they commence. The PCBU or supervisor also signs, and the document is kept on site and reviewed under section 302 whenever controls change or an incident occurs.
Document details
Related SWMS templates
β£οΈSynthetic Mineral Fibre Insulation Removal SWMS
NSW β Synthetic Mineral Fibre Insulation Removal. Full task scope, hazards and controls to be authored to Phasβ¦
βοΈUnderground Tank Removal SWMS
NSW β Underground Tank Removal. Full task scope, hazards and controls to be authored to Phase 1 standard.
π§±Acoustic Ceiling Tile Installation SWMS
NSW β Acoustic Ceiling Tile Installation. Full task scope, hazards and controls to be authored to Phase 1 stanβ¦
π’Aluminium Composite Panel Installation SWMS
NSW β Aluminium Composite Panel Installation. Full task scope, hazards and controls to be authored to Phase 1 β¦
π§Artificial Turf Installation SWMS
NSW β Artificial Turf Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.
β£οΈAsbestos Soil Remediation SWMS
NSW β Asbestos Soil Remediation. Full task scope, hazards and controls to be authored to Phase 1 standard.