OH Consultant
🧨

Explosives Handling SWMS (ANFO / Emulsion)

Receipt, storage, on-site transport, and pre-blast handling of commercial explosives including ANFO, bulk emulsion, detonators, boosters, and primers. Covers magazine security requirements, physical separation of detonators from bulk explosive, static electricity and stray current precautions, shot-hole loading sequence, and exclusion zone establishment before charging commences.

βš–οΈWHS Regulation 2025 & Codes of Practice β€” legally binding from 1 July 2026 (s26A)
πŸ‘·Reviewed by certified occupational health and safety professionals
πŸ—ΊοΈState-specific variants for all 8 Australian jurisdictions
$199 AUDβœ“ Instant Download Available

SWMS variants reference your state’s WHS legislation. Instant download after payment.

Receiving, storing, transporting and loading commercial explosives β€” bulk ANFO, emulsion, electric and non-electric detonators, cast boosters and primers β€” is among the highest-consequence work performed on Australian mine sites, quarries and civil blasting projects. A single deviation from established loading sequence, magazine separation distance or stray-current control can initiate the charge prematurely, killing the shotfiring crew and anyone inside the exclusion zone. WHS Regulation 2025 Part 3.1 requires the PCBU to identify reasonably foreseeable hazards and implement controls under the hierarchy, while AS 2187.2:2006 mandates licensed shotfirer supervision, segregated magazines, and documented loading procedures. State Dangerous Goods legislation independently requires a shotfirer's licence and approved explosives driver. Because the work is section 291 category High Risk Construction Work, a SWMS must be prepared, signed by every worker handling product, retained for the statutory period, and reviewed before each blast. This document provides the prescribed controls and worker sign-on register required to lawfully commence charging.

Hazards identified

7 hazards covered, sorted by priority.

Premature detonation from stray current contacting electric detonator leg wires near radio transmitters or HV powerlinesHIGH

Fatal blast injuries to loading crew within hole collar zone; structural damage and regulator prosecution under WHS s32

Static electricity discharge during pneumatic ANFO loading into dry, dust-laden shot holesHIGH

Spark initiation of primer with crew on bench; multiple fatalities and dangerous goods incident notification required

Sympathetic detonation between bulk explosive and detonators stored without the required physical separation distanceHIGH

Mass detonation of magazine inventory; catastrophic site loss, fatalities, and licence revocation by Dangerous Goods regulator

Misfire or hangfire in loaded hole requiring re-entry before the mandated waiting period elapsesHIGH

Delayed detonation kills inspector or crew member entering the face; coronial inquest and Category 1 offence prosecution

Flyrock ejected beyond calculated exclusion zone due to inadequate stemming or overcharged holeHIGH

Fatal projectile injury to workers, public, or property outside blast zone; civil liability and WHS breach charges

Manual handling injury lifting cast boosters and detonator reels into deep blast holes from bench edgeMEDIUM

Lumbar disc injury, lost-time claim, falls from bench edge into hole; workers compensation and notifiable incident

Nitrous oxide and post-blast fume exposure during re-entry after misfire investigation or in poorly ventilated underground roundsMEDIUM

Acute pulmonary oedema, delayed-onset chemical pneumonitis, hospitalisation; exposure standard breach under WHS Sch 19.3

Control measures

Hierarchy-of-controls order: elimination β†’ substitution β†’ isolation β†’ engineering β†’ administrative β†’ PPE.

  1. 1Elimination β€” Eliminate electric detonators entirely by specifying non-electric shock-tube or electronic detonator systems on sites with HV powerlines, mobile plant radios, or cathodic protection within 200 m.
  2. 2Elimination β€” Prohibit any person inside the calculated exclusion zone during charging; clear the bench using positive head-count and lockable boom gates before any primer enters a hole.
  3. 3Substitution β€” Substitute bulk emulsion for ANFO in wet holes and where static-sensitive ground conditions exist, reducing pneumatic loading static risk per AS 2187.2 cl 9.
  4. 4Substitution β€” Replace cast booster manual placement with mechanically assisted loading rigs on holes deeper than 6 m to remove edge-of-bench manual handling exposure.
  5. 5Engineering β€” Provide segregated, earthed, ventilated magazines for detonators and bulk explosive at the separation distances tabulated in AS 2187.1, with intrusion alarm and licensed access register.
  6. 6Engineering β€” Bond and earth all pneumatic loading hoses, charging trucks, and shot-hole collars; verify continuity with a calibrated resistance meter before each shift.
  7. 7Administrative β€” Only licensed shotfirers (holding current state Dangerous Goods authority) direct charging, witness primer assembly, and authorise the firing sequence; record names on the SWMS sign-on register.
  8. 8Administrative β€” Enforce radio silence, mobile phone shutdown and HV line de-energisation within the prescribed clearance distance from the charged pattern from primer entry until tie-in completion.
  9. 9Administrative β€” Apply the 30-minute minimum re-entry waiting period after misfires and post-blast fume dispersal; verify atmosphere with gas monitor before any worker approaches the face.
  10. 10PPE β€” Issue anti-static cotton coveralls, conductive safety footwear, hearing protection rated SLC80 β‰₯26 dB, impact eyewear and hard hat to all personnel handling product on the bench.

Applicable Codes of Practice

AS 2187.2:2006 Explosives β€” Storage and Use of Explosives (Use of Explosives)βš– Legally binding Β· 1 Jul 2026

Clauses 4 and 9 mandate licensed shotfirer supervision, loading procedures, stray-current precautions and exclusion-zone calculation for every blast.

AS 2187.1:1998 Explosives β€” Storage, Transport and Use Part 1 (Storage)βš– Legally binding Β· 1 Jul 2026

Specifies magazine construction, separation distances between detonator and bulk magazines, and security requirements enforced under state Dangerous Goods regulations.

WHS Regulation 2025 Part 3.1 and section 291 (High Risk Construction Work)βš– Legally binding Β· 1 Jul 2026

Requires hazard identification, hierarchy of controls, SWMS preparation, worker consultation and retention because explosives use is section 291 category HRCW.

Model Code of Practice β€” Managing Risks of Hazardous Chemicals in the Workplace (Safe Work Australia)

Provides risk-management framework for Class 1 dangerous goods including segregation, placarding, manifest quantities and emergency planning duties on the PCBU.

High-Risk Construction Work triggered

s291(h)
Involves the use of explosives

Receipt, storage, on-site transport and loading of ANFO, emulsion, detonators and boosters is direct use of Class 1 explosives requiring a licensed shotfirer under AS 2187.2 cl 4.1.

Legal consequence

PCBU must prepare and retain the SWMS, consult and obtain sign-on from every worker handling explosives, and produce it on inspector request; penalties are substantial and indexed, with the current maximum following the prevailing WHS schedule.

Who this is for

  • β†’Licensed shotfirers on open-cut quarries and mines
  • β†’Civil contractors performing rock excavation blasting
  • β†’Underground development crews loading face rounds
  • β†’Magazine keepers and explosives transport drivers

What you receive

  • βœ“Editable DOCX template β€” Microsoft Word compatible
  • βœ“State-specific WHS legislation schedule (NSW/VIC/QLD/SA/WA/TAS/NT/ACT)
  • βœ“Hazard register with risk ratings + hierarchy-of-control mapping
  • βœ“Worker sign-on register, pre-start checklist, and incident escalation flow

Worked example

At a regional hard-rock quarry preparing a 42-hole production blast on a 12 m bench, the shift supervisor opens the pre-start brief by tabling this SWMS on the crib-room bench. The licensed shotfirer walks the four-person loading crew and the charge truck operator through each hazard line. When the crew identifies that a contractor's UHF repeater tower sits 180 m from the pattern, the SWMS control requiring radio silence and mobile shutdown within clearance distance is applied β€” the supervisor radios the office to enforce silence and posts a spotter at the access road. The static-control entry prompts the truck operator to bond the loading hose to the collar casing and verify earthing with the resistance meter before any ANFO flows; the reading is logged on the back of the SWMS. Every worker signs the sign-on register, including the powder monkey assisting with primer assembly. During loading, hole 27 returns wet ground conditions, so the shotfirer invokes the substitution control and switches that hole to emulsion, annotating the change on the SWMS as a recorded amendment. Once tie-in is complete, the exclusion zone is swept, boom gates locked, and the firing sequence initiated. After the blast, the 30-minute re-entry control is enforced, fume readings taken, and the signed SWMS filed for the statutory retention period.

Related legislation

  • WHS Act 2011 (model)
  • WHS Regulation 2025
  • Code of Practice β€” Hazardous Manual Tasks

Frequently asked questions

Is explosives handling high risk construction work?

Yes, where it forms part of construction work. Work involving the use of explosives is high risk construction work under WHS Regulation 2025 s291(h), and s299 then requires the SWMS to be prepared before charging begins, consulted on, and signed by every worker handling product. On a quarry or mine your state's mining safety legislation may apply alongside or instead of the construction provisions, so check which regime governs your site. State Dangerous Goods legislation applies independently and requires a shotfirer's licence and an approved explosives driver β€” separate authorisations this document records but cannot supply.

Who has to be licensed, and what does the document record?

Charging is directed by a licensed shotfirer holding a current state Dangerous Goods authority, who witnesses primer assembly and authorises the firing sequence. Transport requires an approved explosives driver, and the magazine requires a licensed access register. Licence titles and classes differ between states, so confirm the authority your own regulator issues rather than assuming a national equivalent. The sign-on register names every person who handles product, including the offsider assisting with primer assembly β€” s299 requires consultation with the workers doing the task, and that register is what evidences it happened before the first primer went down a hole.

How does the SWMS deal with stray current near radio transmitters and powerlines?

By removing the susceptible detonator wherever it can. The first control eliminates electric detonators entirely in favour of shock-tube or electronic systems on any site with HV powerlines, mobile plant radios or cathodic protection within 200 m. Where electric detonators remain, radio silence, mobile phone shutdown and HV de-energisation are enforced within the prescribed clearance distance from primer entry through to tie-in completion. Static during pneumatic ANFO loading is a separate problem with a separate control: bond and earth the loading hose, charge truck and hole collar, then verify continuity with a calibrated resistance meter before each shift and log the reading.

What does the SWMS require after a misfire?

A waiting period before anyone approaches the face, treated as a hold point rather than a judgement call. Delayed detonation catching the person who walked back in is the classic fatality in this work, so the controls apply a 30-minute minimum re-entry period after a misfire and after post-blast fume dispersal, with the atmosphere verified by gas monitor before any worker approaches. Post-blast nitrous oxide and fumes cause pulmonary oedema that can present hours later, particularly in poorly ventilated underground rounds. Your site's re-entry period may be longer under the mine's own procedures or a regulator condition β€” this sets a floor, not a ceiling.

Does this cover magazine storage as well as loading the pattern?

Yes. The controls cover receipt, storage, on-site transport and loading. Magazines must be segregated, earthed and ventilated, with detonators held at the separation distances tabulated in AS 2187.1 away from bulk explosive, plus intrusion alarm and a licensed access register β€” sympathetic detonation between a detonator store and a bulk store sited too close is one of the listed hazards. Loading controls come from AS 2187.2 clauses 4 and 9: exclusion-zone calculation, positive head-count and lockable boom gates before any primer enters a hole, and stemming discipline to keep flyrock inside the calculated zone.

What's in this SWMS

Document details

Regulation
AS 2187 Part 2:2006 (Explosives β€” Storage and Use of Explosives); state Dangerous Goods Act (shotfirer licence); WHS Regulation 2025 Part 3.1 (Managing Risks)
HRCW Category
Work involving explosives β€” licensed shotfirer required (AS 2187.2 cl 4.1) (s291(h))
Hazards Identified
7 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment
CIH-reviewed SWMS Β· from $99 Β· instant download

Related SWMS templates

⛏️Mining Explosives Handling & Magazine SWMS

Bulk explosives transport, magazine storage, on-bench charging, primer assembly. Australian Explosives Code 7t…

$199 AUDBuy β†’

πŸ’₯Shotfiring SWMS

Shot initiation, misfire management, and post-blast re-entry at surface and underground operations. Covers ini…

$199 AUDBuy β†’

πŸ“‹Forklift JSA SWMS

This Job Safety Analysis template covers day-to-day forklift operations: pre-start inspection, load assessment…

$99 AUDBuy β†’

⛏️Underground Development SWMS

Underground drive development using drill-and-blast jumbo. Covers face inspection after blast (minimum 30-minu…

$199 AUDBuy β†’

πŸ“‹Concreting JSA SWMS

This template breaks a complete concreting task into its real work sequence β€” pre-pour planning, formwork and …

$99 AUDBuy β†’

πŸ’₯Explosive (Implosion) Demolition SWMS

Explosive (implosion) demolition SWMS for NSW. Danger-zone establishment, flyrock, misfire, security and notif…

$149 AUDBuy β†’