Construction Site Clean-Up SWMS
Post-construction clean β debris removal, dust extraction, final detail clean of fittings, glass, and floors. Includes coordination with active trades, PPE for construction site, waste skip loading.
SWMS variants reference your stateβs WHS legislation. Instant download after payment.
Post-construction clean-up involving debris removal, dust extraction, and detail cleaning alongside active trades. Triggers WHS Regulation 2025 construction work duties and SWMS requirements under Part 6.4.
Hazards identified
3 hazards covered, sorted by priority.
Silicosis, lung disease
Musculoskeletal injury
Head and crush injuries
Control measures
Hierarchy-of-controls order: elimination β substitution β isolation β engineering β administrative β PPE.
- 1H-class HEPA vacuum and wet methods per AS/NZS 60335.2.69 for dust.
- 2Two-person lifts above 16kg; mechanical aids for skip loading.
- 3Hard hat, hi-vis, steel-cap boots; isolate from active trade zones.
Applicable Codes of Practice
Construction work SWMS mandatory before commencement.
Site coordination and clean-up duties.
High-Risk Construction Work triggered
Clean-up occurs alongside active trades operating plant and tools.
No SWMS before work: $9,000 PCBU fine.
What you receive
- βEditable DOCX template β Microsoft Word compatible
- βState-specific WHS legislation schedule (NSW/VIC/QLD/SA/WA/TAS/NT/ACT)
- βHazard register with risk ratings + controls
- βWorker sign-on register and pre-start checklist
Related legislation
- WHS Act 2011 (model)
- WHS Regulation 2025
- Code of Practice β Hazardous Manual Tasks