OH Consultant
← All SWMS Documents
🚧

Traffic Management & Control SWMS

NSW β€” Traffic Management & Control. Full task scope, hazards and controls to be authored to Phase 1 standard.

βš–οΈWHS Regulation 2025 & Codes of Practice β€” legally binding from 1 July 2026 (s26A)
πŸ‘·Reviewed by certified occupational health and safety professionals
πŸ—ΊοΈState-specific variants for all 8 Australian jurisdictions
$149 AUDβœ“ Instant Download Available

SWMS variants reference your state’s WHS legislation. Instant download after payment.

Traffic management and control involves the design, deployment, operation and removal of temporary traffic control devices β€” signs, cones, barriers, variable message signs, portable traffic signals and hand-held stop/slow bats β€” to separate live vehicular and pedestrian traffic from a road worksite. Workers install taper zones on active carriageways, direct traffic under 'Traffic Controller' authority, and work within centimetres of vehicles travelling at posted speeds up to 110 km/h. The dominant risk is being struck by a road user who fails to slow, merges late, is distracted, fatigued or impaired; secondary risks include being struck by plant, sun and heat exposure, and manual handling of heavy devices.

This work is High Risk Construction Work under section 291(n) of the Work Health and Safety Regulation 2025 (NSW) because it is carried out on, in or adjacent to a road or traffic corridor in use. A Safe Work Method Statement is therefore mandatory under section 299 before work commences. Controls must follow AS 1742.3 and the current Transport for NSW Traffic Control at Work Sites Manual, and be applied through the hierarchy of control β€” eliminating exposure by full road closure or detour where reasonably practicable before relying on positive protection, signage and PPE.

Hazards identified

12 hazards covered, sorted by priority.

Traffic controller or worker struck by an errant vehicle entering the work area at posted speedHIGH

Fatality or catastrophic multi-system trauma

Head-on or rear-end incursion at the taper due to late-merging or distracted driversHIGH

Multiple fatalities including workers and road users

Setting up or removing signs and cones on a live carriageway (installation/pack-up phase is the highest exposure period)HIGH

Struck-by fatality; the majority of worksite fatalities occur during set-up/removal

Being struck by reversing or manoeuvring plant, trucks or Truck-Mounted Attenuators (TMA) inside the worksiteHIGH

Fatality or crush injuries

Night work β€” reduced visibility, driver fatigue, glare from headlights and impaired drivers (alcohol/drugs)HIGH

Struck-by fatality; increased incursion probability

Working on high-speed rural roads (100–110 km/h) without positive barrier protectionHIGH

Fatality on incursion; minimal survivable impact energy

Traffic controller fatigue and loss of situational awareness during long shifts holding a stop/slow batHIGH

Delayed reaction to incursion; serious injury or fatality

Heat stress, UV exposure and dehydration from prolonged outdoor exposure in high-visibility clothingMEDIUM

Heat exhaustion, heat stroke, collapse into traffic lane

Manual handling of water-filled barriers, sign stands, VMS boards and cones (repetitive lifting, awkward postures)MEDIUM

Musculoskeletal injury β€” back, shoulder, knee

Pedestrian and cyclist conflict where footpaths or shared paths are closed or divertedMEDIUM

Pedestrian struck by vehicle or worker; fall injuries

Silica and bitumen fume exposure where traffic control is co-located with cutting, grinding or asphalt pavingMEDIUM

Respirable crystalline silica disease; respiratory irritation

Communication breakdown between traffic controllers at each end of a single-lane closureHIGH

Head-on collision within the closure; multiple fatalities

Control measures

Hierarchy-of-controls order: elimination β†’ substitution β†’ isolation β†’ engineering β†’ administrative β†’ PPE.

  1. 1ELIMINATE: Where reasonably practicable, undertake work under full road closure with signed detour, or schedule work in off-peak/low-volume windows to remove worker exposure to live traffic entirely.
  2. 2SUBSTITUTE: Replace hand-held stop/slow bat control with portable traffic signals (compliant with AS 4191) or Automated Flagger Assistance Devices to remove the traffic controller from the traffic stream.
  3. 3ENGINEER β€” Positive protection: Deploy road safety barriers (concrete or water-filled to AS/NZS 3845.1) and Truck-Mounted Attenuators between live traffic and the work zone on roads with posted speeds β‰₯ 80 km/h wherever geometry allows.
  4. 4ENGINEER β€” Traffic Guidance Scheme: Prepare a site-specific TGS/TMP designed and signed by a Transport for NSW accredited 'Prepare a Work Zone Traffic Management Plan' holder, complying with AS 1742.3 and the current TfNSW Traffic Control at Work Sites Manual, including buffer zones sized to speed environment.
  5. 5ENGINEER β€” Speed management: Apply reduced speed limits via authorised Speed Zone Authorisation, use physical speed reduction measures (lateral shifts, chicanes), variable message signs (VMS) and rumble strips on approaches.
  6. 6ADMIN β€” Accreditation: Every traffic controller holds a current SafeWork NSW-recognised 'Control Traffic with a Stop-Slow Bat' (RIIWHS205E) and 'Implement Traffic Management Plans' (RIIWHS302E) qualification as required, with cards carried on site.
  7. 7ADMIN β€” Set-up/pack-up procedure: Install signs and devices in the direction of travel from the furthest advance warning sign inwards; remove in reverse order; never cross a live lane on foot to place devices β€” use a shadow vehicle with rear-mounted TMA and flashing arrow board.
  8. 8ADMIN β€” Communication: Two-way radios on a dedicated channel between traffic controllers at each end of single-lane closures with token/lead-vehicle system; documented positive handshake before releasing traffic.
  9. 9ADMIN β€” Fatigue and rotation: Traffic controller rotation every 2 hours maximum on stop/slow duties; rest breaks in shaded, hydrated environment; shift length limits and night-work fatigue management per site fatigue policy.
  10. 10ADMIN β€” Respirable crystalline silica: Where traffic control overlaps saw-cutting or grinding, maintain upwind position, wet-cutting at source and air monitoring in accordance with the Workplace exposure limit of 0.05 mg/mΒ³ (8-hr TWA).
  11. 11PPE: Day/night high-visibility garments to AS/NZS 4602.1 (Class D/N), safety footwear to AS/NZS 2210.3, hard hat to AS/NZS 1801, sun protection (broad-brim attachment, SPF 50+, UV-rated eyewear to AS/NZS 1067) and P2 respiratory protection to AS/NZS 1716 where dust/fume present.
  12. 12CONSULT & REVIEW: All workers hold CPCCWHS1001 (White Card); the SWMS is developed in consultation with workers under section 47 of the WHS Act 2011 (NSW), signed on before work, and reviewed under section 302 of the WHS Regulation 2025 (NSW) whenever the TGS changes, an incursion occurs, or conditions change.

Applicable Codes of Practice

SafeWork NSW Code of Practice: Construction Workβš– Legally binding Β· 1 Jul 2026

Approved Code establishing general construction WHS duties, including planning, supervision and consultation applicable to roadwork sites.

AS 1742.3 β€” Manual of uniform traffic control devices: Traffic control for works on roads

Primary technical standard for signage, taper lengths, buffer zones and device placement referenced by the TfNSW Traffic Control at Work Sites Manual.

AS/NZS 3845.1 β€” Road safety barrier systems

Specifies performance requirements for temporary and permanent barriers, TMAs and crash cushions used to provide positive protection.

AS/NZS 4602.1 β€” High visibility safety garments

Mandatory garment classification (Class D, N, D/N) for workers exposed to vehicular traffic in day, night and combined conditions.

High-Risk Construction Work triggered

s291(n)
Is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor in use by traffic other than pedestrians

Traffic management is by definition carried out on or immediately adjacent to a road in use by vehicular traffic. Workers, plant and controllers occupy or abut the live carriageway throughout set-up, operation and removal, directly satisfying section 291(n) of the WHS Regulation 2025 (NSW).

Legal consequence

Because the work is HRCW under section 291(n), a compliant SWMS must be prepared before work starts (section 299) and must be reviewed and revised under section 302 whenever controls are inadequate, an incident occurs, or the work method changes. Failure to prepare, comply with or review a SWMS is an offence under the WHS Regulation 2025 (NSW). Where non-compliance exposes a person to risk of death or serious injury, prosecution may proceed under sections 31 (Category 1 β€” reckless conduct) or 32 (Category 2) of the Work Health and Safety Act 2011 (NSW). Current maximum penalties are set out in the SafeWork NSW penalty schedule as amended from time to time.

Who this is for

  • β†’Civil contractors and road construction principal contractors delivering work under TfNSW or local council contracts
  • β†’Traffic management companies deploying Traffic Guidance Schemes and Traffic Controllers
  • β†’Utility contractors (water, gas, electricity, telecommunications) working within road reserves
  • β†’Line-marking, asphalt, saw-cutting and pavement crews requiring co-located traffic control
  • β†’Local government road maintenance teams and their sub-contracted traffic control providers

What you receive

  • βœ“Editable Word/PDF SWMS aligned to NSW WHS Regulation 2025 sections 291(n), 299 and 302
  • βœ“Pre-populated hazard register with 12 role-specific traffic management hazards and risk ratings
  • βœ“Hierarchy-of-control response for each hazard citing AS 1742.3, AS/NZS 3845.1 and AS/NZS 4602.1
  • βœ“HRCW declaration linking the task to section 291(n) with legal justification
  • βœ“PCBU, Supervisor and Worker sign-on register with competency verification fields (White Card, RIIWHS205E, RIIWHS302E)
  • βœ“Consultation record template satisfying section 47 of the WHS Act 2011 (NSW)
  • βœ“SWMS review and revision log satisfying section 302 of the WHS Regulation 2025 (NSW)
  • βœ“Emergency response and incursion procedure section, including notification pathway to SafeWork NSW under section 38 of the WHS Act
  • βœ“Plain-English worker toolbox summary suitable for pre-start briefings on site

Worked example

A civil contractor is replacing a stormwater pit on the Princes Highway at Kiama, requiring closure of the left southbound lane over three consecutive nights between 8pm and 5am. The posted speed is 80 km/h. The Traffic Guidance Scheme, prepared by an accredited TMP designer, applies a 60 km/h roadworks speed zone under a TfNSW Speed Zone Authorisation, deploys advance warning VMS 1 km back, a taper compliant with AS 1742.3 for 80/60 km/h, water-filled barriers along the longitudinal buffer, and a Truck-Mounted Attenuator upstream of the crew. Two accredited traffic controllers hold RIIWHS205E and communicate by two-way radio; controllers are rotated every 90 minutes. All workers wear AS/NZS 4602.1 Class D/N garments and hold CPCCWHS1001. The SWMS is signed on by all workers before shift, reviewed after Night 1 when a near-miss incursion is logged, and the taper is lengthened by 20 metres before Night 2 under section 302.

Related legislation

  • Work Health and Safety Act 2011 (NSW) β€” sections 19, 31, 32, 38, 47
  • Work Health and Safety Regulation 2025 (NSW) β€” sections 291(n), 299, 302
  • Road Transport Act 2013 (NSW) and Road Rules 2014 (NSW) β€” authority for temporary speed zoning and traffic control
  • Roads Act 1993 (NSW) β€” approvals for work within a road reserve
  • Transport for NSW Traffic Control at Work Sites Manual (current edition)
  • Environmental Planning and Assessment Act 1979 (NSW) β€” where road occupancy triggers approvals

Frequently asked questions

Do I still need a SWMS if the work is short-duration, such as a 30-minute utility repair on a suburban street?

Yes. Section 291(n) of the WHS Regulation 2025 (NSW) is triggered by the nature of the work β€” being on or adjacent to a road in use β€” not its duration. Section 299 requires a SWMS before HRCW commences, regardless of how brief the exposure.

Can a general construction supervisor direct traffic instead of an accredited traffic controller?

No. Directing traffic with a stop/slow bat on a NSW road requires the SafeWork NSW-recognised 'Control Traffic with a Stop-Slow Bat' (RIIWHS205E) qualification, and implementing a Traffic Management Plan requires RIIWHS302E. Untrained personnel directing traffic breach both the WHS Act general duty and TfNSW requirements.

Is a Traffic Guidance Scheme the same thing as a SWMS?

No. A TGS (or TMP) is the engineering design showing device placement, taper lengths and speed zoning under AS 1742.3. A SWMS is the WHS document that identifies HRCW hazards, controls and responsibilities under section 299. Both are required, and the SWMS should reference the approved TGS.

When must this SWMS be reviewed?

Section 302 of the WHS Regulation 2025 (NSW) requires review whenever controls are inadequate, an incident or near-miss occurs, the work method or TGS changes, or a health and safety representative reasonably requests it. In practice, night-work jobs are often reviewed at the end of each shift before the next commences.

What's in this SWMS

Document details

Regulation
Work Health and Safety Regulation 2025 (NSW), Section 291 β€” High Risk Construction Work
HRCW Category
s. 291(n) β€” Work on, in or adjacent to a road, railway, shipping lane or other traffic corridor in use
Hazards Identified
12 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment
CIH-reviewed SWMS Β· from $99 Β· instant download

Related SWMS templates

⚑Traffic Signal Installation SWMS

NSW β€” Traffic Signal Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.

$199 AUDBuy β†’

🧱Acoustic Ceiling Tile Installation SWMS

NSW β€” Acoustic Ceiling Tile Installation. Full task scope, hazards and controls to be authored to Phase 1 stan…

$149 AUDBuy β†’

🏒Aluminium Composite Panel Installation SWMS

NSW β€” Aluminium Composite Panel Installation. Full task scope, hazards and controls to be authored to Phase 1 …

$199 AUDBuy β†’

🚧Artificial Turf Installation SWMS

NSW β€” Artificial Turf Installation. Full task scope, hazards and controls to be authored to Phase 1 standard.

$99 AUDBuy β†’

☣️Asbestos Soil Remediation SWMS

NSW β€” Asbestos Soil Remediation. Full task scope, hazards and controls to be authored to Phase 1 standard.

$249 AUDBuy β†’

πŸ”¨Asbestos-Containing Material Demolition SWMS

NSW β€” Asbestos-Containing Material Demolition. Full task scope, hazards and controls to be authored to Phase 1…

$249 AUDBuy β†’