Concrete Driveway & Footpath SWMS
NSW β Concrete Driveway & Footpath. Full task scope, hazards and controls to be authored to Phase 1 standard.
SWMS variants reference your stateβs WHS legislation. Instant download after payment.
Concrete driveway and footpath construction involves excavation, formwork, reinforcement placement, concrete delivery by agitator truck or line pump, screeding, finishing and curing β frequently within the road reserve or immediately adjacent to trafficked carriageways, driveways and pedestrian thoroughfares. Workers are exposed to moving vehicles, powered mobile plant (skid steers, mini-excavators, plate compactors, concrete pumps), wet cement causing chemical burns and dermatitis, respirable crystalline silica during cutting or grinding, manual handling of formwork and mesh, and struck-by risks from pump hoses and delivery chutes.
This work is High Risk Construction Work under section 291 of the Work Health and Safety Regulation 2025 (NSW) because it is performed adjacent to a traffic corridor in use (s291(n)) and involves the movement of powered mobile plant (s291(o)). Section 299 therefore requires a Safe Work Method Statement to be prepared before work commences, identifying hazards, documenting controls applied through the hierarchy in section 36, and specifying how compliance will be monitored.
Hazards identified
12 hazards covered, sorted by priority.
Fatal or serious crush/impact injuries
Fatality or serious crush injury
Severe impact injury, eye injury, fatality
Full-thickness skin burns, chronic sensitisation
Silicosis, lung cancer, COPD
Crush and asphyxiation
Electrocution, explosion, flooding
Musculoskeletal injury, disc injury
Fractures, lacerations, puncture wounds from starter bars
Noise-induced hearing loss
Heat exhaustion, heat stroke, skin cancer
Hand-arm vibration syndrome, Raynaud's
Control measures
Hierarchy-of-controls order: elimination β substitution β isolation β engineering β administrative β PPE.
- 1Eliminate live traffic exposure where practicable by full road closure under a Road Occupancy Licence or council permit; where closure is not possible, implement a compliant Traffic Guidance Scheme prepared by a TfNSW-accredited person under AS 1742.3 and the TfNSW Traffic Control at Work Sites Technical Manual.
- 2Substitute dry cutting with wet-cut saws or on-tool water suppression / H-class HEPA extraction to control respirable crystalline silica below the WES of 0.05 mg/mΒ³ (8-hr TWA); prohibit dry sweeping.
- 3Engineer separation between workers and powered mobile plant using physical exclusion zones, spotters with two-way radios, reversing alarms and 360Β° camera systems; enforce a 3 m no-go zone around slewing plant per AS 2601.
- 4Locate underground services using Before You Dig Australia (BYDA / Dial Before You Dig), pothole with hand tools or non-destructive digging within 500 mm of identified assets, and comply with SafeWork NSW Excavation Work Code of Practice.
- 5Batter, bench or shore excavations deeper than 1.5 m in accordance with AS 2865; keep spoil and plant back from the crown by at least the excavation depth.
- 6Concrete pumping operations to comply with AS 2550.15; secure end hose with two personnel where required, purge air from lines before pumping, and maintain 24 m radial exclusion during boom whip risk.
- 7Provide task lighting, edge protection around excavations, and clear walkways free of reo mesh trip hazards; use timber walk boards over placed reinforcement.
- 8Implement heat stress management with scheduled hydration breaks, shade, work/rest cycles per the SafeWork NSW Managing the Risks of Working in Heat Guide, and start pours early to avoid peak radiant heat.
- 9Administrative controls: pre-start briefings referencing this SWMS, daily plant pre-operational checks, Traffic Controller (Blue Card/RIIWHS205) verification, high-visibility Class D/N garments to AS/NZS 4602.1, and licensed concrete pump operator (HRWL where applicable).
- 10PPE: chemical-resistant gloves and gumboots (AS/NZS 2161.10.1 / AS/NZS 2210.3) for wet concrete contact, P2 respirators fit-tested to AS/NZS 1715 during cutting/grinding, safety eyewear to AS/NZS 1337.1, Class 5 hearing protection to AS/NZS 1270, and SPF50+ sunscreen.
- 11All workers to hold CPCCWHS1001 (White Card); consult workers and HSRs under section 47 of the WHS Act 2011 (NSW) during SWMS development; review and revise the SWMS under section 302 of the WHS Regulation 2025 whenever controls fail, the work method changes, a notifiable incident occurs, or an HSR requests review.
Applicable Codes of Practice
General duties for construction work, SWMS content and consultation requirements applicable to concrete driveway and footpath works.
Controls for subgrade excavation, underground service location and trench stability during driveway preparation.
Assessment and control of noise from saws, compactors and adjacent traffic.
Design of Traffic Guidance Schemes for works within or adjacent to trafficked road corridors.
High-Risk Construction Work triggered
Driveway and footpath construction is routinely performed within the road reserve, kerb line or across vehicle crossings where the carriageway remains open to traffic, directly exposing workers to moving vehicles.
The task requires operation of skid steers, mini-excavators, plate compactors, concrete agitator trucks and concrete pumps in close proximity to workers on foot.
Because this work is HRCW, section 299 of the WHS Regulation 2025 (NSW) requires a SWMS to be prepared before work starts and section 302 requires it to be reviewed and revised when controls are inadequate. Failure to comply exposes the PCBU and officers to Category 1 offences under section 31 (reckless conduct) and Category 2 offences under section 32 of the WHS Act 2011 (NSW). Refer to the current SafeWork NSW penalty schedule for applicable maximum penalties for individuals, officers and body corporates.
Who this is for
- βCivil and concreting contractors constructing residential and commercial driveways
- βCouncil and TfNSW footpath maintenance and renewal crews
- βKerb-and-gutter and vehicle crossing subcontractors
- βConcrete pump operators and agitator delivery drivers working roadside
- βPrincipal contractors coordinating driveway works on active development sites
What you receive
- βFully editable SWMS in Word and PDF formats aligned to WHS Regulation 2025 (NSW) sections 299β302
- βPre-populated hazard and control register covering traffic, mobile plant, silica, wet concrete and excavation risks
- βTraffic management prompts referencing AS 1742.3 and TfNSW TGS requirements
- βPlant pre-start inspection checklist for skid steers, compactors and concrete pumps
- βWorker sign-on register capturing CPCCWHS1001 White Card and Traffic Controller verification
- βConsultation record template satisfying section 47 of the WHS Act 2011 (NSW)
- βSWMS review and revision log meeting section 302 requirements
- βEmergency response and notifiable incident procedure aligned to Part 3 of the WHS Act
- βReference matrix of applicable NSW Codes of Practice and AS/NZS standards
Worked example
A concreting crew in Penrith is engaged to demolish and reinstate a 42 mΒ² residential vehicle crossing on a suburban collector road. Because the work occupies the layback and encroaches on the trafficked lane, the principal contractor obtains a Road Occupancy Licence from Penrith City Council and deploys a TGS designed by an accredited TfNSW TC1 person, including advance signage, tapered lane closure and two Blue Card traffic controllers. Before excavation, BYDA plans are obtained and the crew potholes by hand within 500 mm of a marked Jemena gas main. The skid steer operator works within a physically delineated exclusion zone with a dedicated spotter. Concrete is placed by boom pump; the two-person end-hose rule is enforced and workers wear chemical-resistant gauntlets, P2 respirators during saw-cutting of the existing slab (wet-cut with on-tool water), Class D/N hi-vis and hearing protection. The SWMS is signed on by all workers at the pre-start and reviewed after a near-miss when a vehicle breaches the taper.
Related legislation
- Work Health and Safety Act 2011 (NSW)
- Work Health and Safety Regulation 2025 (NSW)
- Roads Act 1993 (NSW) β road opening permits and works within the road reserve
- Road Transport Act 2013 (NSW) β Road Occupancy Licences and traffic control
- Protection of the Environment Operations Act 1997 (NSW) β concrete washout and stormwater
- Environmental Planning and Assessment Act 1979 (NSW) β development consent conditions
Frequently asked questions
Do we need a SWMS for a small residential driveway that doesn't touch the road?
If any part of the work occurs on, in or adjacent to a road in use (including the layback, kerb or footpath), or involves powered mobile plant such as a skid steer or concrete pump, it is HRCW under section 291 of the WHS Regulation 2025 (NSW) and a SWMS is mandatory under section 299 before work starts.
Who is responsible for the Traffic Guidance Scheme?
The PCBU carrying out the work must ensure a compliant TGS is prepared by a TfNSW-accredited person (TC1/TC2 as required) in accordance with AS 1742.3 and the TfNSW Traffic Control at Work Sites Technical Manual, and that a Road Occupancy Licence or council permit is held where required.
How do we control silica when saw-cutting the existing slab?
Eliminate dry cutting. Use wet-cut saws with continuous water feed or tools with integrated H-class HEPA extraction, wear P2 respirators fit-tested to AS/NZS 1715, prohibit dry sweeping (use HEPA vacuum or wet methods), and ensure exposure remains below the 0.05 mg/mΒ³ workplace exposure standard for respirable crystalline silica.
When must this SWMS be reviewed?
Section 302 of the WHS Regulation 2025 (NSW) requires review whenever controls are found to be inadequate, the work method or plant changes, a notifiable incident occurs, or a Health and Safety Representative requests it. The review must be documented and workers re-consulted before work resumes.
Document details
Related SWMS templates
π§Brick & Paver Driveway Installation SWMS
NSW β Brick & Paver Driveway Installation. Full task scope, hazards and controls to be authored to Phase 1 staβ¦
π¨Concrete Cutting & Breaking - Demolition SWMS
NSW β Concrete Cutting & Breaking - Demolition. Full task scope, hazards and controls to be authored to Phase β¦
ποΈConcrete Floor Surfacing & Grinding SWMS
NSW β Concrete Floor Surfacing & Grinding. Full task scope, hazards and controls to be authored to Phase 1 staβ¦
ποΈConcrete Mud-Jacking & Slabjacking SWMS
NSW β Concrete Mud-Jacking & Slabjacking. Full task scope, hazards and controls to be authored to Phase 1 stanβ¦
ποΈConcrete Pouring & Placement SWMS
NSW β Concrete Pouring & Placement. Full task scope, hazards and controls to be authored to Phase 1 standard.
π§±Polished Concrete Flooring SWMS
NSW β Polished Concrete Flooring. Full task scope, hazards and controls to be authored to Phase 1 standard.