OH Consultant
SWMS

Trenchless & Pipe Relining SWMS Templates

CIPP pipe lining, drain relining, pipe bursting, horizontal directional drilling, electrofusion poly-pipe, and hot-tapping live process SWMS — no-dig methods for live sewer / water main rehab.

⚖️WHS Regulation 2025 & Codes of Practice — legally binding from 1 July 2026 (s26A)
👷Reviewed by certified occupational health and safety professionals
🗺️State-specific variants for all 8 Australian jurisdictions

About these SWMS

Trenchless and pipe relining SWMS templates cover no-dig rehabilitation and installation of sewer, stormwater, water main and process pipework using cured-in-place pipe (CIPP), pipe bursting, slip-lining, horizontal directional drilling (HDD), electrofusion poly welding and hot-tapping on live lines. These works engage multiple high-risk work classifications under WHS Regulation 2025 Schedule 1 (confined spaces, hazardous chemicals, pressure equipment and energised services) and must be controlled in line with AS/NZS 3500 (Plumbing and drainage), AS 2885 (Pipelines — Gas and liquid petroleum) where applicable, and the model Code of Practice: Confined Spaces. Templates suit civil plumbers, drainage contractors, HDD crews and process maintenance teams tendering to councils, water authorities and industrial clients.

What this category covers

  • CIPP liner impregnation with styrene and epoxy resins
  • Steam, hot water and UV curing of CIPP liners
  • Pre-lining CCTV inspection and high-pressure water jetting
  • Pipe bursting head deployment and static pull-in rigs
  • Slip-lining HDPE into host pipes via launch pits
  • Horizontal directional drilling pilot bore and reaming
  • Locating and avoiding underground services during HDD
  • Electrofusion welding of PE100 poly pipe and fittings
  • Hot-tapping live water, gas and process pipelines
  • Confined space entry to pits, manholes and chambers
  • Bypass pumping and over-pumping of live sewers
  • Drilling fluid management and frac-out response
CIH-reviewed SWMS library

5 SWMS in this category

5 ready-to-buy editable DOCXs · 8 state variants per product · delivered within 24 hours of payment.

🔍

🔧Drain Re-lining (CIPP) SWMS

CIPP (cured-in-place pipe) re-lining of drainage and sewer lines covers steam and UV-cured liner installation, resin handling, confined-spac…

$99 AUDINSTANT
Buy Drain Re-lining (CIPP) SWMS →

🔧Electrofusion Poly Pipe Welding (PPW) SWMS

SWMS template for electrofusion poly pipe welding (ppw). Covers PE pipe joining via electrofusion couplers — gas + water mains.. 8-state AU …

$149 AUDINSTANT
Buy Electrofusion Poly Pipe Welding (PPW) SWMS →

🔧Horizontal Directional Drilling SWMS

Safe work method statement for trenchless horizontal directional drilling for plumbing service installation including service detection, dri…

$149 AUDINSTANT
Buy Horizontal Directional Drilling SWMS →

🔧Hot Tapping Live Process SWMS

Safe work method statement for hot tapping and line-stopping on pressurised live process pipework including pressure containment, leak testi…

$199 AUDINSTANT
Buy Hot Tapping Live Process SWMS →

🔧Pipe Bursting & Slip-Lining SWMS

A Safe Work Method Statement for pipe bursting & slip-lining covering all key hazards, controls and regulatory requirements. This is classif…

$199 AUDINSTANT
Buy Pipe Bursting & Slip-Lining SWMS →

Applicable standards & regulations

WHS Regulation 2025, Part 4.3 — Confined Spaces
Entry to manholes, pits and host pipes during CIPP and bursting works triggers permit, atmospheric monitoring and standby person duties.
AS/NZS 3500 Set — Plumbing and Drainage
Sets installation, jointing and testing requirements for rehabilitated drainage, sewer and water service lines including relined and replaced sections.
Model Code of Practice: Managing Risks of Hazardous Chemicals in the Workplace
Governs styrene, epoxy resin and drilling fluid handling, ventilation, SDS access and emergency response during liner impregnation and curing.
AS 2885 Series — Pipelines: Gas and Liquid Petroleum
Applies to hot-tapping, isolation and welding on high-pressure transmission pipelines, mandating qualified welders, fitness-for-service and safe operating procedures.

Frequently asked questions

Is CIPP pipe relining classified as high-risk construction work in Australia?

Yes. CIPP relining typically engages two HRCW categories under WHS Regulation 2025 Schedule 1, clause 291: work in or near a confined space (host pipe, launch pit, manhole) and use of hazardous chemicals (styrene-based or epoxy resins). A SWMS is mandatory before work starts and must address atmospheric monitoring, ventilation during steam and UV cure, SDS-driven PPE selection, and emergency retrieval. The model Code of Practice: Confined Spaces and the Hazardous Chemicals Code both apply.

Do I need a confined space permit for drain relining in a live sewer?

If workers enter the manhole, pit or host pipe, yes — a confined space entry permit is required under WHS Regulation 2025 Part 4.3, regardless of work duration. AS 2865 governs safe entry procedures, including atmospheric testing for oxygen, LEL, H2S and CO before and during entry. Where relining is completed entirely from the surface via robotic cutters and remote inversion, confined space duties may not trigger, but adjacent manholes used for liner access usually still require permits.

What's the difference between a SWMS and a JSA for HDD and trenchless work?

A SWMS is a legally required document under WHS Regulation 2025 for any HRCW activity, with prescribed content: hazards, controls, how controls are implemented, monitored and reviewed. A JSA (Job Safety Analysis) is a broader risk tool with no statutory format. HDD frac-out, pipe bursting near services, and hot-tapping all involve HRCW triggers (energised services, pressure, confined spaces), so a compliant SWMS — not just a JSA — must be prepared, signed by workers, and available on site.

Are hot-tapping SWMS different for water mains versus gas pipelines?

Yes. Hot-tapping potable or raw water mains is controlled under AS/NZS 3500 and water authority technical specifications, focusing on contamination, pressure containment and isolation. Hot-tapping gas or hydrocarbon pipelines falls under AS 2885.2 and requires qualified pipeline welders, a documented hot-tap procedure, fitness-for-service assessment of the host pipe, and engineering sign-off. SWMS content for gas hot-taps must reference ignition control, gas detection, and emergency shutdown — controls not typically required for water applications.

Do trenchless SWMS need to be customised for each state or territory?

The core SWMS content is harmonised because WHS Regulation 2025 applies in all jurisdictions except Victoria (OHS Regulations 2017) and WA (WHS Regulations 2022, which mirror the model). What changes is referenced authority — Dial Before You Dig (now BYDA), state water authority technical standards, and local council trade waste conditions. Templates should remain regulation-anchored and project-customised: site address, supervisor, plant, services located, and permit references added per job rather than per state.

Trenchless & Pipe Relining SWMS

Editable DOCX templates, 8 state variants per product, CIH-reviewed.

Browse all SWMS