OH Consultant
SWMS

Civil Plumbing & Excavation SWMS Templates

Pipe laying, excavation near services, DBYD service location, trench shoring, slab coring, suspended pipework, BESS cooling loops, EV charging site plumbing, fire hydrant install, sewer pump stations, and remote / cyclone region work SWMS.

⚖️WHS Regulation 2025 & Codes of Practice — legally binding from 1 July 2026 (s26A)
👷Reviewed by certified occupational health and safety professionals
🗺️State-specific variants for all 8 Australian jurisdictions

About these SWMS

Civil Plumbing & Excavation SWMS cover pipe laying, trenching, service location, vacuum excavation, slab coring, suspended pipework, fire services, sewer pump stations and recycled water plumbing across Australian construction, civil and infrastructure sites. Every template is built to WHS Regulation 2025 (including Schedule 1 high-risk construction work triggers for trenches deeper than 1.5 m and work near energised services), the Model Code of Practice: Excavation Work, AS/NZS 3500 (Plumbing and Drainage), and AS 2865 (Confined Spaces). Templates address Before You Dig Australia (DBYD) referrals, ground disturbance permits, shoring and benching design, and dual-reticulation compliance — giving plumbing contractors, civil crews and principal contractors a defensible, regulator-aligned safe work method statement for high-risk underground and pressurised water work.

What this category covers

  • Trench excavation, shoring, benching and battering deeper than 1.5 m
  • DBYD service location with EM, GPR and potholing verification
  • Non-destructive vacuum excavation around live underground services
  • Pipe laying, jointing, bedding and backfill compaction
  • Slab coring and core-drilled penetrations through suspended floors
  • Suspended pipework installation from EWPs and scaffolds
  • Fire hydrant, hose reel and sprinkler system installation
  • Sewer pump station fit-out and confined space entry
  • Greywater, Class A recycled and dual-reticulation plumbing
  • Heritage cast iron stack replacement with lead and asbestos controls
  • Temporary site water and sewer connections for construction
  • Basement dewatering, sump pump install and groundwater management
CIH-reviewed SWMS library

17 SWMS in this category

17 ready-to-buy editable DOCXs · 8 state variants per product · delivered within 24 hours of payment.

🔍

🔧BESS Cooling Loop Plumbing SWMS

Safe work method statement for the installation of cooling loop plumbing on Battery Energy Storage Systems (BESS) including glycol handling,…

$149 AUDINSTANT
Buy BESS Cooling Loop Plumbing SWMS →

🔧Deep Trench Plumbing Repair SWMS

Safe work method statement for plumbing repair and installation in excavations exceeding 1.5m depth including shoring, benching, batter slop…

$199 AUDINSTANT
Buy Deep Trench Plumbing Repair SWMS →

🔧EV Charging Site Plumbing SWMS

Safe work method statement for plumbing coordination works on electric vehicle charging station installations including stormwater drainage,…

$149 AUDINSTANT
Buy EV Charging Site Plumbing SWMS →

🔧Excavator Use — Plumbing Trenches SWMS

Excavator use for plumbing involves operating mini-excavators and excavators to dig trenches for water supply, sewer, stormwater and gas pip…

$149 AUDINSTANT
Buy Excavator Use — Plumbing Trenches SWMS →

🔧Fire Services — Hydrant & Sprinkler SWMS

Fire services plumbing involves the installation, testing and maintenance of fire hydrant systems, fire sprinkler systems, fire hose reels a…

$149 AUDINSTANT
Buy Fire Services — Hydrant & Sprinkler SWMS →

🔧Greywater / Recycled Water System Install SWMS

SWMS template for greywater / recycled water system install. Covers Greywater treatment + reuse plumbing.. 8-state AU coverage, CIH-reviewed…

$99 AUDINSTANT
Buy Greywater / Recycled Water System Install SWMS →

🔧Heritage Cast Iron Stack & Drain Replacement SWMS

A Safe Work Method Statement for heritage cast iron stack & drain replacement covering all key hazards, controls and regulatory requirements…

$199 AUDINSTANT
Buy Heritage Cast Iron Stack & Drain Replacement SWMS →

🔧Cyclone Region Plumbing SWMS

Safe work method statement for plumbing installations in cyclone-rated areas of the Northern Territory and Far North Queensland including wi…

$149 AUDINSTANT
Buy Cyclone Region Plumbing SWMS →

🔧Pipe Laying & Trenching SWMS

Pipe laying and trenching involves the excavation of trenches for the installation of water supply, sewer, stormwater and gas pipe systems. …

$149 AUDINSTANT
Buy Pipe Laying & Trenching SWMS →

🔧Plumbing Slab Coring & Penetrations SWMS

A Safe Work Method Statement for plumbing slab coring & penetrations covering all key hazards, controls and regulatory requirements. This is…

$149 AUDINSTANT
Buy Plumbing Slab Coring & Penetrations SWMS →

🔧Reclaimed Water Plumbing SWMS

Safe work method statement for the installation and connection of Class A recycled water systems including dual-pipe identification, cross-c…

$99 AUDINSTANT
Buy Reclaimed Water Plumbing SWMS →

🔧Remote Mining Site Plumbing SWMS

Safe work method statement for plumbing works on fly-in fly-out mining sites and process facilities under PHMP requirements including fatigu…

$199 AUDINSTANT
Buy Remote Mining Site Plumbing SWMS →

🔧Sump Pump / Basement Dewatering Install SWMS

A Safe Work Method Statement for sump pump / basement dewatering install covering all key hazards, controls and regulatory requirements. Thi…

$149 AUDINSTANT
Buy Sump Pump / Basement Dewatering Install SWMS →

🔧Suspended Pipework Installation SWMS

SWMS template for suspended pipework installation. Covers Above-ceiling install of pressure/waste pipework, brackets, supports.. 8-state AU …

$149 AUDINSTANT
Buy Suspended Pipework Installation SWMS →

🔧Temporary Services Connection (Site) SWMS

SWMS template for temporary services connection (site). Covers Site water/gas/sewer hookup, temporary.. 8-state AU coverage, CIH-reviewed ed…

$99 AUDINSTANT
Buy Temporary Services Connection (Site) SWMS →

🔧Underground Service Locating SWMS

A Safe Work Method Statement for underground service locating covering all key hazards, controls and regulatory requirements.

$99 AUDINSTANT
Buy Underground Service Locating SWMS →

🔧Vacuum Excavation NDD SWMS

A Safe Work Method Statement for vacuum excavation ndd covering all key hazards, controls and regulatory requirements. This is classified as…

$149 AUDINSTANT
Buy Vacuum Excavation NDD SWMS →

Applicable standards & regulations

Model Code of Practice: Excavation Work (Safe Work Australia)
Sets PCBU duties for trench shoring, ground assessment, spoil placement and edge protection for any excavation, with mandatory controls above 1.5 m depth.
AS/NZS 3500 — Plumbing and Drainage Set
Governs design, installation, testing and commissioning of water, sanitary, stormwater and heated water services referenced by every state plumbing regulator.
WHS Regulation 2025, Schedule 1 — High Risk Construction Work
Triggers mandatory SWMS for trenches >1.5 m, work near energised services, confined spaces, work at heights >2 m and use of powered mobile plant.
AS 2865 — Confined Spaces
Applies to entry into sewer pump stations, wet wells, manholes and tanks — requiring atmospheric testing, entry permits, standby person and rescue arrangements.

Frequently asked questions

Is trench work over 1.5 metres deep classified as high-risk construction work in Australia?

Yes. WHS Regulation 2025, Schedule 1 explicitly classifies work in or near a trench or shaft deeper than 1.5 m as high-risk construction work (HRCW), triggering a mandatory SWMS before work starts. The Model Code of Practice: Excavation Work further requires a competent person to assess ground conditions and specify shoring, benching or battering. SWMS must be prepared, signed by workers, kept on site and reviewed if conditions change or a control fails.

Do I need to call Before You Dig Australia (DBYD) before every excavation?

Yes — DBYD referral is the regulator-expected starting point for any ground disturbance, including hand digging. DBYD plans are indicative only, so the Model Code of Practice: Excavation Work and AS 5488 (Classification of Subsurface Utility Information) require physical verification through potholing, electromagnetic locating or vacuum excavation before mechanical digging near plotted services. Our SWMS templates document DBYD reference numbers, locator qualifications, exclusion zones around live services and the escalation steps if unidentified utilities are encountered.

What is the difference between a SWMS and a JSA for plumbing and excavation work?

A SWMS is a legally required document under WHS Regulation 2025 for the 18 categories of high-risk construction work listed in Schedule 1, including trenching over 1.5 m and work near energised services. A JSA (Job Safety Analysis) is a general planning tool with no specific legal status. SWMS must identify the HRCW, hazards, control measures using the hierarchy of control, and how controls are implemented, monitored and reviewed. For civil plumbing, a SWMS is mandatory — a JSA alone will not satisfy a regulator inspection.

Are sewer pump stations and wet wells considered confined spaces under Australian WHS law?

Yes. Sewer pump stations, wet wells and manholes meet the AS 2865 and WHS Regulation 2025 definition of a confined space — they are enclosed or partially enclosed, not designed for continuous human occupancy, and have a risk of harmful atmosphere, engulfment or oxygen deficiency. Entry requires a confined space entry permit, atmospheric testing, mechanical ventilation, a trained standby person, rescue equipment and workers holding a confined space entry unit of competency. Our SWMS templates integrate the permit and rescue plan.

Do civil plumbing SWMS need to be customised for each state or territory?

The model WHS Regulation 2025 framework is harmonised across most Australian jurisdictions, so the core SWMS structure is consistent. However, plumbing licensing, dial-before-you-dig service names, recycled water rules and notifiable excavation thresholds vary — for example Victoria operates under OHS Regulations 2017 rather than the model WHS Act. Our templates are state-neutral in structure but include prompts to insert jurisdiction-specific regulator references, plumbing licence numbers, and local water authority approvals before issue to the site.

Civil Plumbing & Excavation SWMS

Editable DOCX templates, 8 state variants per product, CIH-reviewed.

Browse all SWMS