OH Consultant
← All SWMS Documents
πŸ”¨

Tank & Silo Demolition SWMS

Demolition of industrial tanks (steel, concrete) and silos. Includes residue purging and cleaning, confined space entry for internal cutting where required, oxy or plasma cutting of steel, sequenced collapse, hauling off-site.

βš–οΈWHS Regulation 2025 & Codes of Practice β€” legally binding from 1 July 2026 (s26A)
πŸ‘·Reviewed by certified occupational health and safety professionals
πŸ—ΊοΈState-specific variants for all 8 Australian jurisdictions
$199 AUDβœ“ Instant Download Available

SWMS variants reference your state’s WHS legislation. Instant download after payment.

Demolition of industrial tanks and silos involves residue purging, internal hot work in confined spaces, oxy/plasma cutting of steel, and sequenced collapse. This constitutes High Risk Construction Work under WHS Regulation 2025 Schedule 1, requiring a SWMS before work commences due to structural collapse, confined space, and chemical exposure risks.

Hazards identified

3 hazards covered, sorted by priority.

Residual flammable vapours igniting during hot workHIGH

Explosion, fatal burns, structural rupture

Confined space entry for internal cuttingHIGH

Asphyxiation, toxic exposure, entrapment fatality

Uncontrolled structural collapse during sequenced demolitionHIGH

Crush injuries, fatality, adjacent damage

Control measures

Hierarchy-of-controls order: elimination β†’ substitution β†’ isolation β†’ engineering β†’ administrative β†’ PPE.

  1. 1Purge, clean and gas-test to LEL <5% before any hot work; reverify continuously.
  2. 2Confined space permit, standby attendant, retrieval system and continuous atmospheric monitoring per AS 2865.
  3. 3Engineered demolition sequence by competent person; exclusion zones and remote cutting where collapse risk identified.

Applicable Codes of Practice

WHS Regulation 2025 Schedule 1βš– Legally binding Β· 1 Jul 2026

HRCW Cat 4 and 5 β€” SWMS mandatory

AS 2865 Confined Spaces

Internal tank entry, permits, atmospheric testing

High-Risk Construction Work triggered

5
Work involving demolition of load-bearing structure

Tanks and silos are load-bearing structures requiring sequenced demolition to prevent uncontrolled collapse.

4
Work in or near a confined space

Internal cutting requires entry into tank interior meeting confined space definition under WHS Reg.

Legal consequence

No SWMS = Cat 2 offence, fines up to $63,000 (individual).

What you receive

  • βœ“Editable DOCX SWMS tailored to tank and silo demolition
  • βœ“State-specific WHS legislation schedule (NSW, VIC, QLD, WA, SA, TAS, ACT, NT)
  • βœ“Hazard register covering residue, hot work, confined space and collapse risks
  • βœ“Worker sign-on register for SWMS consultation evidence

Related legislation

  • WHS Act 2011 s.19 β€” primary duty of care
  • WHS Regulation 2025 Part 6.3 β€” Confined spaces
  • WHS Regulation 2025 Chapter 6 β€” Construction work
What's in this SWMS

Document details

Regulation
WHS Regulation 2025, Schedule 1 β€” High Risk Construction Work
HRCW Category
Cat 5, Cat 4 (confined space β€” internal), residue chemical risk
Hazards Identified
15 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment