Combustible Cladding Risk Assessment SWMS
Combustible cladding risk assessment for existing buildings — material identification, fire spread modelling, evacuation planning, interim fire safety measures, and rectification sequencing.
SWMS variants reference your state’s WHS legislation. Instant download after payment.
Combustible cladding risk assessment involves the systematic identification, sampling, and fire-spread evaluation of external wall materials on existing buildings — including aluminium composite panels (ACP) with polyethylene cores, expanded polystyrene (EPS) render systems, and high-pressure laminates (HPL). The work spans desktop document review, intrusive sampling at height, laboratory analysis, fire engineering modelling, occupant evacuation planning, and sequencing of interim and permanent rectification measures. A SWMS is mandatory under WHS Regulation 2025 because the assessment activity itself constitutes high-risk construction work — operatives access façades at height, disturb potentially friable insulation, and work on or near buildings with known fire-propagation risk. NSW Building Products (Safety) Act 2017, VIC Building Act 1993 cladding provisions, and the ABCB advisory framework all require documented risk assessments prepared by competent persons, and PCBUs must demonstrate consultation, hazard control, and worker sign-on before any façade intervention commences. Without a compliant SWMS, the PCBU cannot lawfully mobilise assessors, EWP operators, or rectification crews to a suspect building.
Hazards identified
7 hazards covered, sorted by priority.
Catastrophic façade ignition, multi-storey fire propagation, occupant fatalities, and corporate manslaughter exposure for PCBU and directors
Fatal impact injuries, traumatic brain injury, or permanent spinal damage from falls exceeding two metres
Silicosis, pulmonary fibrosis, mesothelioma risk, and long-tail occupational disease compensation claims against the PCBU
Head trauma, fatalities to pedestrians, and breach of public protection duties under WHS Regulation 2025 Part 6.3
Electrocution, arc flash burns, cardiac arrest, and unplanned outages affecting life safety systems including fire detection
Mass casualty event, failure of egress capacity, and breach of NCC Volume One Section D evacuation requirements
Building remains occupied under inadequate controls, regulatory enforcement action, and exposure to civil negligence claims
Control measures
Hierarchy-of-controls order: elimination → substitution → isolation → engineering → administrative → PPE.
- 1Elimination — Conduct desktop assessment of building documentation, façade drawings, and supplier declarations before any intrusive sampling to eliminate unnecessary façade entry.
- 2Elimination — Prohibit all hot work, grinding, and spark-producing activities on or within five metres of suspect combustible cladding during the assessment phase.
- 3Substitution — Replace destructive core sampling with non-destructive XRF analysis and infrared spectroscopy where panel identification can be achieved without disturbance.
- 4Substitution — Use cold-cutting hydraulic shears instead of abrasive saws when sample extraction is unavoidable to remove ignition energy from the cladding system.
- 5Engineering — Install perimeter catch fans, hoarding, and exclusion zones extending one-third of building height per AS 4576 to capture dropped objects and debris.
- 6Engineering — Deploy continuous fire watch with thermal imaging cameras and charged hose reels positioned within 15 metres of all sampling locations throughout works.
- 7Administrative — Issue permit-to-work authorised by competent fire safety engineer for each sampling location, with cladding type, evacuation plan, and interim measures documented.
- 8Administrative — Conduct daily pre-start briefing referencing this SWMS, confirm occupant notification, and verify fire indicator panel isolation procedures with building management.
- 9PPE — Issue P2 respirators, cut-resistant gloves to AS/NZS 2161.3, FR-rated coveralls to AS/NZS 4824, and full-body harness with twin lanyards to AS/NZS 1891.1.
- 10PPE — Provide impact-rated hard hats with chin straps to AS/NZS 1801, sealed safety eyewear to AS/NZS 1337.1, and high-visibility garments to AS/NZS 4602.1 for all façade personnel.
Applicable Codes of Practice
Imposes mandatory affected building notification and rectification obligations, requiring documented competent-person risk assessment before and during façade investigation works.
Requires registered building practitioners to assess and rectify combustible cladding under documented safe work procedures aligned with WHS Regulation 2025.
Defines acceptable combustibility criteria under AS 1530.1, triggering the assessment scope and dictating sample testing methodology for compliance determination.
Section 26A high-risk construction work involving fall risk over two metres — mandates documented fall-arrest system selection, anchor certification, and rescue plan.
High-Risk Construction Work triggered
Intrusive sampling is carried out from elevated work platforms or on rope access across multi-storey façades, with assessors working well above 2 metres on full-body harnesses and twin lanyards to AS/NZS 1891.1.
PCBU must prepare, consult workers on, and retain this SWMS for the duration of the work plus two years; non-compliance penalties are substantial and indexed, with the current maximum following the prevailing WHS schedule.
Who this is for
- →Cladding rectification contractors on residential and commercial buildings
- →Fire safety engineers conducting façade compliance audits
- →Building surveyors managing affected-building registers
- →Owners corporation managers coordinating rectification programs
What you receive
- ✓Editable DOCX template — Microsoft Word compatible
- ✓State-specific WHS legislation schedule (NSW/VIC/QLD/SA/WA/TAS/NT/ACT)
- ✓Hazard register with risk ratings + hierarchy-of-control mapping
- ✓Worker sign-on register, pre-start checklist, and incident escalation flow
Worked example
A cladding assessment crew mobilises to an eight-storey mixed-use building flagged on the state affected-buildings register, suspected to contain polyethylene-core ACP across the northern elevation. At the 6:30am pre-start brief in the ground-floor amenities room, the supervisor walks the four-person team through this SWMS line by line. The team reviews the hazard register and confirms today's primary risks: fall from EWP at level seven, dropped sample fragments onto the laneway below, and ignition risk from any spark source near the panel. Controls are selected from the hierarchy — hot work is eliminated entirely, an XRF analyser will be used at three locations before any cold-cut sampling is attempted, perimeter hoarding has been verified by the site engineer, and a fire watch with charged hose reel is stationed at level six. Each worker signs on, confirming competency for EWP operation (HRWL WP licence sighted) and rope access (IRATA Level 1 minimum). At 10:15am, the assessor identifies an unexpected services penetration behind the proposed sample location. Work stops, the SWMS is reopened on the supervisor's tablet, and an additional control — services isolation permit through building management — is added before any cutting proceeds. The amended SWMS is re-signed by all four workers before the task resumes.
Related legislation
- WHS Act 2011 (model)
- WHS Regulation 2025
- National Construction Code; AS 5113 — Combustible cladding
Frequently asked questions
Does a cladding assessment need a SWMS, or only the rectification?
The assessment itself needs one. Operatives access façades from elevated work platforms or rope access with a fall risk of more than 2 m, which is high risk construction work under s291(a), and core sampling can bring workers onto concealed energised building services behind the cavity. A SWMS is therefore mandatory under s299 before assessors, platform operators or sampling crews mobilise. Separately, the state building product and cladding rectification frameworks require the risk assessment itself to be prepared by a competent person, so the two documentation streams run in parallel rather than one substituting for the other.
Can we sample without cutting the panel?
Often yes, and the document pushes you there first. Desktop assessment of building documentation, façade drawings and supplier declarations comes before any façade entry at all, and where panel identification can be achieved non-destructively, XRF analysis and infrared spectroscopy replace destructive core sampling. Where extraction is unavoidable, cold-cutting hydraulic shears replace abrasive saws so no ignition energy is introduced into the cladding system. The worked example runs XRF at three locations before any cold cut is attempted, which is the sequence you want on a polyethylene-core panel on an occupied building.
What fire precautions apply during sampling?
All hot work, grinding and spark-producing activity is prohibited on or within five metres of suspect combustible cladding for the whole assessment phase, and a continuous fire watch runs with thermal imaging and charged hose reels within 15 metres of every sampling location. Each sampling location works under a permit authorised by a competent fire safety engineer, recording the cladding type, the evacuation plan and the interim measures in force. Occupant notification is confirmed and fire indicator panel isolation procedures are verified with building management at pre-start, because the building stays occupied while you work on its façade.
How are people below the work protected?
Through perimeter catch fans, hoarding and exclusion zones extending one third of the building height, verified by the site engineer before work starts. A dropped panel fragment, fixing or sampling tool from level seven kills a pedestrian in the laneway, and the public protection duty is owed regardless of whether the footpath belongs to the site. Personnel on the façade wear impact-rated hard hats with chin straps, sealed eyewear and full-body harnesses with twin lanyards to AS/NZS 1891.1, with anchor certification and a rescue plan documented — a suspended worker on a façade has minutes, not hours.
What about the insulation behind the panel?
It is treated as its own respiratory hazard rather than an afterthought. Disturbing insulation backings during intrusive sampling can release respirable crystalline silica and synthetic mineral fibre, so P2 respirators, cut-resistant gloves and fire-retardant coveralls are issued for all façade personnel. Misidentification is the other listed risk with a long tail: getting the material composition wrong means the building stays occupied under interim fire measures that do not match the actual hazard. That is why sampling is permitted, laboratory-confirmed and documented against the combustibility criteria rather than judged on site.
Document details
Related SWMS templates
🔥Bushfire Rebuild & Cleanup SWMS
Post-bushfire property cleanup and rebuild preparation — asbestos identification on damaged sheet / pipe laggi…
🏗️Cladding Rectification SWMS
Removal and replacement of non-compliant combustible aluminium composite panel (ACP) cladding — building acces…
📋Carpentry JSA SWMS
This Carpentry JSA Template covers the core tasks of a framing and fit-out carpenter: material handling, power…
🏢Cladding Removal — EWP Access SWMS
External cladding removal using EWP access covers boom lift and scissor lift positioning, ACP panel handling a…
🚨Emergency Plan Template SWMS
Ready-to-fill written Emergency Plan covering emergency contacts, response procedures for fire, medical, chemi…
🚪Fire Door Inspection SWMS
Fire door inspection, testing, and certification — annual inspection programme, gap and seal testing, certific…