OH Consultant
Pipelines

Pipeline & Pressurised Systems SWMS

Pipeline and pressurised-system work carries some of the highest consequence hazards in Australian construction — uncontrolled releases of gas, oil, or high-pressure water can cause fatalities, environmental damage, and significant asset loss. Every Australian state has its own Pipeline Act, and the model WHS Regulation designates pipe-laying in a trench as High Risk Construction Work under Reg 291. The AS/NZS 2885 series governs gas and liquid petroleum pipelines nationally and is referenced by SafeWork Australia, state energy regulators, and major operators (APA Group, Jemena, ATCO, AGN). This category covers the full pipeline project lifecycle: design acceptance and pre-commissioning checks, trenching and pipe installation to AS/NZS 2885.3, hot-tap and stopple operations, pigging runs, hydrotest and commissioning, cathodic protection installation, and decommissioning. Each SWMS is structured to the WHS Regulation HRCW framework, references the applicable state Pipeline Act and regulator, and includes the hierarchy-of-controls table required by Reg 290.

Need a pipeline SWMS that references AS/NZS 2885?

Each SWMS is a CIH-reviewed, editable DOCX covering the hazard identification, risk controls, regulatory citations, and competency requirements your project needs.

View all Pipeline SWMS →