Synthetic Grass Laying (Residential) SWMS
Residential synthetic grass laying covers ground preparation, sub-base compaction, weed-mat installation, turf rolling and seaming, and infill spreading (sand/rubber) for backyard and rooftop applications.
SWMS variants reference your stateβs WHS legislation. Instant download after payment.
Residential synthetic grass installation involves ground preparation, sub-base compaction, weed-mat laying, turf rolling and seaming, plus sand or rubber infill spreading on backyards and rooftops. This construction work requires a SWMS under WHS Regulation 2025 due to manual handling and plant operation hazards on site.
Hazards identified
3 hazards covered, sorted by priority.
Musculoskeletal injury, back strain, crush injuries
Hand-arm vibration syndrome and hearing loss
Lacerations to hands and forearms
Control measures
Hierarchy-of-controls order: elimination β substitution β isolation β engineering β administrative β PPE.
- 1Two-person lifts for turf rolls over 20kg; use trolleys for infill bags.
- 2Issue Class 5 cut-resistant gloves, hearing protection and anti-vibration gloves for compactor operation.
- 3Rotate compactor operators every 30 minutes; maintain hook blades sharp and retracted when idle.
Applicable Codes of Practice
Direct guidance for repetitive lifting and turf handling
Required PPE on landscaping construction sites
High-Risk Construction Work triggered
Rooftop synthetic turf installation involves working on or near structures requiring SWMS controls.
PCBU must prepare SWMS before work starts; penalties up to $30,000.
What you receive
- βEditable DOCX SWMS template
- βState-specific WHS legislation schedule
- βProject hazard register
- βWorker sign-on register
Related legislation
- WHS Act 2011 s19 β Primary duty of care
- WHS Regulation 2025 r299 β SWMS for HRCW
- WHS Regulation 2025 Part 4.2 β Hazardous manual tasks