OH Consultant
← All SWMS Documents
πŸ€

Pre-Construction Pest Treatment SWMS

Pre-construction termite barrier β€” chemical soil drench or reticulation system install before slab pour. Includes pre-slab perimeter spray, plumbing penetration treatment, reticulation pipe install, certification documentation per AS 3660.1.

βš–οΈWHS Regulation 2025 & Codes of Practice β€” legally binding from 1 July 2026 (s26A)
πŸ‘·Reviewed by certified occupational health and safety professionals
πŸ—ΊοΈState-specific variants for all 8 Australian jurisdictions
$149 AUDβœ“ Instant Download Available

SWMS variants reference your state’s WHS legislation. Instant download after payment.

Pre-construction termite management involves applying registered termiticides to soil, slab penetrations, and reticulation systems before the concrete slab is poured, in accordance with AS 3660.1. The work exposes technicians to organophosphate, pyrethroid, or fipronil-based chemicals through dermal absorption, inhalation of drift, and accidental ingestion, while operating in active construction zones alongside formworkers, plumbers, and steel fixers. Because the activity involves the use, handling and storage of hazardous chemicals on a construction site, it is classified as High Risk Construction Work under WHS Regulation 2025 Schedule 1, Category 17. A Safe Work Method Statement is mandatory before work commences, must be developed in consultation with workers, and must be available for inspection by the principal contractor and the regulator. This SWMS documents hazard identification, the hierarchy of controls applied, certification obligations under AS 3660.1, and the chemical-specific emergency response required when working with Schedule 6 and Schedule 7 termiticides.

Hazards identified

7 hazards covered, sorted by priority.

Dermal absorption of concentrated termiticide during decanting and mixingHIGH

Acute organophosphate toxicity, cholinesterase inhibition, chemical dermatitis, and potential long-term neurological harm requiring medical surveillance

Inhalation of termiticide spray drift and aerosolised mist during perimeter applicationHIGH

Respiratory irritation, headache, nausea, and chronic exposure exceeding workplace exposure standards under WES Schedule

Contamination of potable water lines via incorrect plumbing penetration treatmentHIGH

Public health notification, chemical poisoning of building occupants, mandatory regulator notification and significant remediation liability

Slip, trip and fall on reinforced steel mesh, trench edges and wet soil during applicationMEDIUM

Sprains, fractures, lacerations from rebar, lost-time injury and potential chemical container rupture causing secondary exposure

Manual handling injuries lifting 20L chemical drums and reticulation pipe coilsMEDIUM

Lumbar strain, soft tissue injury, hernia, and cumulative musculoskeletal disorder requiring workers compensation claim

Heat stress during summer slab preparation in unshaded excavation footprintMEDIUM

Dehydration, heat exhaustion, impaired judgement increasing chemical misapplication risk, and potential heat stroke collapse

Environmental contamination of stormwater drains and adjacent soil from runoff or spillLOW

EPA breach, prosecution under state environmental protection legislation, mandatory remediation and reputational damage to PCBU

Control measures

Hierarchy-of-controls order: elimination β†’ substitution β†’ isolation β†’ engineering β†’ administrative β†’ PPE.

  1. 1Elimination β€” Where building design permits, substitute chemical barrier with physical termite barrier system (e.g. stainless mesh or graded stone) eliminating chemical exposure entirely.
  2. 2Elimination β€” Schedule chemical application outside other trades' working hours so no concurrent workers are present in the treatment footprint or downwind drift zone.
  3. 3Substitution β€” Select lower-toxicity termiticide actives (Schedule 6 fipronil or bifenthrin) over Schedule 7 organophosphates where AS 3660.1 efficacy criteria can still be satisfied.
  4. 4Substitution β€” Use ready-mixed cartridge formulations or closed-transfer systems instead of manual decanting of concentrate from bulk drums.
  5. 5Engineering β€” Install closed-loop reticulation pipework with above-slab fill points eliminating future re-treatment exposure and isolating chemical from occupied building zones.
  6. 6Engineering β€” Use low-pressure coarse droplet spray nozzles (under 300 kPa) to minimise aerosol generation and drift beyond the treatment perimeter.
  7. 7Administrative β€” Conduct pre-start SWMS sign-on, verify SDS for the specific termiticide batch, confirm wind speed under 15 km/h, and isolate the work zone with hazard tape and signage.
  8. 8Administrative β€” Maintain certification records, batch numbers, application volumes and a treatment plan per AS 3660.1 clause 8, retained by the PCBU for the life of the structure.
  9. 9PPE β€” Chemical-resistant nitrile gloves, P2 respirator with organic vapour cartridge, splash goggles, Type 4 chemical coveralls and rubber boots compliant with AS/NZS 1715/1716.
  10. 10PPE β€” On-site decontamination station with emergency eyewash, potable rinse water, spill kit and atropine information card accessible within 10 metres of the application zone.

Applicable Codes of Practice

AS 3660.1:2014 Termite management β€” New building work

Mandates chemical application rates, treated zone coverage, reticulation installation method and certification documentation issued to the builder on completion.

WHS Regulation 2025 Part 7.1 β€” Hazardous Chemicalsβš– Legally binding Β· 1 Jul 2026

Requires SDS access, risk assessment, exposure control to WES limits, induction, and health monitoring for workers using Schedule 6 and 7 termiticides.

Model Code of Practice β€” Managing Risks of Hazardous Chemicals in the Workplace (Safe Work Australia)

Provides the hierarchy of controls framework, placarding, decanting procedure and emergency response planning required for on-site termiticide handling.

AS/NZS 1715:2009 Selection, use and maintenance of respiratory protective equipment

Specifies fit-testing, cartridge selection for organic vapours, and maintenance regime for the P2 respirators used during spray application.

High-Risk Construction Work triggered

17
Work involving the use, handling or storage of hazardous chemicals on a construction site

Pre-construction termiticide application involves bulk decanting, spraying and storing Schedule 6 or 7 agricultural chemicals across the building footprint before slab pour.

Legal consequence

PCBU must prepare and consult workers on a SWMS before HRCW commences, provide it to the principal contractor, and retain it for at least two years (or for the duration of any notifiable incident investigation). Penalties for non-compliance are substantial and indexed; current maximum follows the prevailing WHS schedule.

Who this is for

  • β†’Licensed pest control technicians on residential builds
  • β†’Pre-construction termite treatment subcontractors to volume builders
  • β†’Principal contractors coordinating slab-stage trades
  • β†’Owner-builders engaging pest management contractors directly

What you receive

  • βœ“Editable DOCX template β€” Microsoft Word compatible
  • βœ“State-specific WHS legislation schedule (NSW/VIC/QLD/SA/WA/TAS/NT/ACT)
  • βœ“Hazard register with risk ratings + hierarchy-of-control mapping
  • βœ“Worker sign-on register, pre-start checklist, and incident escalation flow

Worked example

On a slab-stage detached housing project in a greenfield estate, a licensed pest technician arrives at 6:30am to apply a fipronil-based perimeter and penetration treatment ahead of a 10:00am concrete pour. At the pre-start brief, the site supervisor opens this SWMS with the technician and the formwork leading hand. They walk the hazard register: drift exposure is flagged HIGH, and the technician notes a 12 km/h easterly wind β€” within tolerance per the administrative control, but they reposition the application sequence to work upwind of the plumbing apprentice still finishing penetration boxing. The SDS for the specific fipronil batch is reviewed, decontamination station location is confirmed at the site shed, and all three workers sign on. Mid-task, the plumber asks to access a penetration the technician has just treated; referring to the SWMS re-entry control, the supervisor enforces a 30-minute exclusion until the surface is touch-dry. The technician completes the application, photographs the treated zone, records batch numbers and litres applied on the AS 3660.1 certificate, and lodges it with the builder. The SWMS is filed with the site safety folder and remains available for the principal contractor and regulator inspection throughout the build.

Related legislation

  • WHS Act 2011 (model)
  • WHS Regulation 2025
  • Managing Risks of Hazardous Chemicals CoP; APVMA registered product label requirements
What's in this SWMS

Document details

Regulation
WHS Regulation 2025, Schedule 1 β€” High Risk Construction Work
HRCW Category
Chemical exposure (soil-applied termiticide), Cat 17
Hazards Identified
7 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment