Fire Door Installation & Certification SWMS
This SWMS covers supply and installation of fire-rated door assemblies including frames, hardware, seals, and closers in accordance with AS 1905.1 and the Building Code of Australia. Work includes cutting wall openings, fixing frames, hanging leaves, and fitting fire-rated hardware.
SWMS variants reference your state's WHS legislation. Instant download after payment.
This SWMS covers This SWMS covers supply and installation of fire-rated door assemblies including frames, hardware, seals, and closers in accordance with AS 1905.1 and the Building Code of Australia. Work includes cutting wall openings, fixing frames, hanging leaves, and fitting fire-rated hardware. Authored against WHS Regulation 2025, Part 4.4 โ High Risk Construction Work; AS 1905.1 โ Fire-Resistant Doorsets and the relevant Safe Work Australia Codes of Practice. CIH-reviewed. Editable DOCX delivered within 24 hours of payment.
Hazards identified
8 hazards covered, sorted by priority.
TBD consequence โ author this in Phase 6 enrichment.
TBD consequence โ author this in Phase 6 enrichment.
TBD consequence โ author this in Phase 6 enrichment.
TBD consequence โ author this in Phase 6 enrichment.
TBD consequence โ author this in Phase 6 enrichment.
TBD consequence โ author this in Phase 6 enrichment.
TBD consequence โ author this in Phase 6 enrichment.
TBD consequence โ author this in Phase 6 enrichment.
Control measures
Hierarchy-of-controls order: elimination โ substitution โ isolation โ engineering โ administrative โ PPE.
- 1TBD control 1 โ author in Phase 6
- 2TBD control 2 โ author in Phase 6
- 3TBD control 3 โ author in Phase 6
- 4TBD control 4 โ author in Phase 6
- 5TBD control 5 โ author in Phase 6
- 6TBD control 6 โ author in Phase 6
- 7TBD control 7 โ author in Phase 6
- 8TBD control 8 โ author in Phase 6
- 9TBD control 9 โ author in Phase 6
- 10TBD control 10 โ author in Phase 6
Applicable Codes of Practice
Core risk-management framework applicable to all work subject to Model WHS Regulations.
High-Risk Construction Work triggered
TBD โ author in Phase 6.
TBD โ author in Phase 6.
Who this is for
- โTBD audience 1 โ author in Phase 6
- โTBD audience 2
- โTBD audience 3
What you receive
- โEditable Microsoft Word (.docx) document delivered within 24 hours of payment.
- โTitle page with company details and revision date fields.
- โHazard register covering the 8 hazards identified in this SWMS.
- โHierarchy-of-control measures cross-referenced to the applicable Codes of Practice.
- โLegislation schedule pre-populated per Australian state.
Worked example
TBD worked example for Fire Door Installation โ author in Phase 6.
Related legislation
- Work Health and Safety Act 2011 (model)
- WHS Regulation 2025, Part 4.4 โ High Risk Construction Work; AS 1905.1 โ Fire-Resistant Doorsets
Frequently asked questions
Is a SWMS legally required for fire door installation?
TBD โ author in Phase 6 per the master spec.
What do I receive after payment?
Editable DOCX delivered within 24 hours of payment to the email you provide at checkout.
Is the template state-specific?
Yes โ 8 state variants (NSW, VIC, QLD, SA, WA, TAS, NT, ACT) with jurisdiction-specific legislation schedules.
Document details
Buy the complete Fire Services Installation SWMS for $35 AUD
Covers every fire services installation task in one document instead of purchasing each sub-activity separately. Editable DOCX, same author, same state-specific delivery.