OH Consultant
โ† All SWMS Documents
๐Ÿ“ก

Concrete Scanning & X-Ray SWMS

This SWMS covers ground-penetrating radar (GPR) and X-ray scanning of concrete slabs, walls, and columns to locate embedded services, reinforcement, and voids before drilling or cutting. Includes radiation source handling and site clearance procedures.

$19 AUDOne-time purchase ยท Editable DOCX ยท delivered within 24 hours

SWMS variants reference your state's WHS legislation. Instant download after payment.

This SWMS covers This SWMS covers ground-penetrating radar (GPR) and X-ray scanning of concrete slabs, walls, and columns to locate embedded services, reinforcement, and voids before drilling or cutting. Includes radiation source handling and site clearance procedures. Authored against WHS Regulation 2025; State Radiation Safety Acts and ARPANSA RPS C-1 and the relevant Safe Work Australia Codes of Practice. CIH-reviewed. Editable DOCX delivered within 24 hours of payment.

Hazards identified

8 hazards covered, sorted by priority.

TBD hazard 1 for Concrete Scanning & X-RayHIGH

TBD consequence โ€” author this in Phase 6 enrichment.

TBD hazard 2 for Concrete Scanning & X-RayHIGH

TBD consequence โ€” author this in Phase 6 enrichment.

TBD hazard 3 for Concrete Scanning & X-RayHIGH

TBD consequence โ€” author this in Phase 6 enrichment.

TBD hazard 4 for Concrete Scanning & X-RayMEDIUM

TBD consequence โ€” author this in Phase 6 enrichment.

TBD hazard 5 for Concrete Scanning & X-RayMEDIUM

TBD consequence โ€” author this in Phase 6 enrichment.

TBD hazard 6 for Concrete Scanning & X-RayMEDIUM

TBD consequence โ€” author this in Phase 6 enrichment.

TBD hazard 7 for Concrete Scanning & X-RayMEDIUM

TBD consequence โ€” author this in Phase 6 enrichment.

TBD hazard 8 for Concrete Scanning & X-RayLOW

TBD consequence โ€” author this in Phase 6 enrichment.

Control measures

Hierarchy-of-controls order: elimination โ†’ substitution โ†’ isolation โ†’ engineering โ†’ administrative โ†’ PPE.

  1. 1TBD control 1 โ€” author in Phase 6
  2. 2TBD control 2 โ€” author in Phase 6
  3. 3TBD control 3 โ€” author in Phase 6
  4. 4TBD control 4 โ€” author in Phase 6
  5. 5TBD control 5 โ€” author in Phase 6
  6. 6TBD control 6 โ€” author in Phase 6
  7. 7TBD control 7 โ€” author in Phase 6
  8. 8TBD control 8 โ€” author in Phase 6
  9. 9TBD control 9 โ€” author in Phase 6
  10. 10TBD control 10 โ€” author in Phase 6

Applicable Codes of Practice

Code of Practice: How to Manage Work Health and Safety Risks (Safe Work Australia, 2018)โš– Legally binding ยท 1 Jul 2026

Core risk-management framework applicable to all work subject to Model WHS Regulations.

High-Risk Construction Work triggered

0
Work involving non-ionising electromagnetic radiation; work near buried services

TBD โ€” author in Phase 6.

Legal consequence

TBD โ€” author in Phase 6.

Who this is for

  • โ†’TBD audience 1 โ€” author in Phase 6
  • โ†’TBD audience 2
  • โ†’TBD audience 3

What you receive

  • โœ“Editable Microsoft Word (.docx) document delivered within 24 hours of payment.
  • โœ“Title page with company details and revision date fields.
  • โœ“Hazard register covering the 8 hazards identified in this SWMS.
  • โœ“Hierarchy-of-control measures cross-referenced to the applicable Codes of Practice.
  • โœ“Legislation schedule pre-populated per Australian state.

Worked example

TBD worked example for Concrete Scanning & X-Ray โ€” author in Phase 6.

Related legislation

  • Work Health and Safety Act 2011 (model)
  • WHS Regulation 2025; State Radiation Safety Acts and ARPANSA RPS C-1

Frequently asked questions

Is a SWMS legally required for concrete scanning & x-ray?

TBD โ€” author in Phase 6 per the master spec.

What do I receive after payment?

Editable DOCX delivered within 24 hours of payment to the email you provide at checkout.

Is the template state-specific?

Yes โ€” 8 state variants (NSW, VIC, QLD, SA, WA, TAS, NT, ACT) with jurisdiction-specific legislation schedules.

What's in this SWMS

Document details

Regulation
WHS Regulation 2025; State Radiation Safety Acts and ARPANSA RPS C-1
HRCW Category
Work involving non-ionising electromagnetic radiation; work near buried services
Hazards Identified
7 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment
Trade master SWMS

Buy the complete Concreting SWMS for $35 AUD

Covers every concreting task in one document instead of purchasing each sub-activity separately. Editable DOCX, same author, same state-specific delivery.

View Concreting Master โ†’
Other Concreting activities

More Concreting sub-task SWMS

Each single-activity template is $19 AUD.